I hereby give notice that an ordinary meeting of the Strategic Procurement Committee will be held on:
Date: Time: Meeting Room: Venue:
|
Wednesday, 2 May 2018 9.00am Room 1, Level
26 |
Komiti Mahi Āta Torotoro Rawa Strategic Procurement Committee
OPEN AGENDA
|
MEMBERSHIP
Chairperson |
Deputy Mayor Bill Cashmore |
|
Deputy Chairperson |
Cr Ross Clow |
|
Members |
Cr Dr Cathy Casey |
|
|
Cr Linda Cooper, JP |
|
|
Cr Alf Filipaina |
|
|
Cr Penny Hulse |
|
|
Cr Daniel Newman, JP |
|
|
|
|
Ex-officio |
Mayor Hon Phil Goff, CNZM, JP |
|
(Quorum 5 members)
|
|
Michelle Judge Governance Advisor
26 April 2018
Contact Telephone: 09 977 6739 Email: michelle.judge@aucklandcouncil.govt.nz Website: www.aucklandcouncil.govt.nz
|
Terms of Reference
Responsibilities
The committee is established to assist the chief executive to undertake the management procedure of ensuring sound procurement processes are followed in relation to procurement of goods and services necessary to deliver on the work programme and operations outlined in the council’s adopted Annual plan.
It will ensure that reasonable purchasing procedures have been followed in awarding contracts and will provide an efficient mechanism for documenting the approvals for those contracts.
Within a framework where contracts are an operational matter delegated to the chief executive, this committee will consider all contracts beyond the chief executive’s financial delegations. The chief executive may refer contracts within his financial delegations which are sensitive or may impact on the reputation of the council.
The chief executive has power to award contracts up to $20 million alone and the power to award contracts up to $22.5 million jointly with the mayor and Finance and Performance Committee chair.
The committee will have responsibility for:
· awarding of contracts of $22.5 million or greater
· awarding of contracts less than $22.5 million which are sensitive or may impact on the reputation of the council if the chief executive refers the matter to the committee
· oversight over the procurement processes and procedures.
From time to time the committee may advise the chief executive and council on changes to the procurement and contracts probity procedures.
Powers
All powers necessary to perform the committee’s responsibilities.
Except:
(a) powers that the Governing Body cannot delegate or has retained to itself (section 2)
(b) where the committee’s responsibility is limited to making a recommendation only
(c) the power to establish sub-committees
Exclusion of the public – who needs to leave the meeting
Members of the public
All members of the public must leave the meeting when the public are excluded unless a resolution is passed permitting a person to remain because their knowledge will assist the meeting.
Those who are not members of the public
General principles
· Access to confidential information is managed on a “need to know” basis where access to the information is required in order for a person to perform their role.
· Those who are not members of the meeting (see list below) must leave unless it is necessary for them to remain and hear the debate in order to perform their role.
· Those who need to be present for one confidential item can remain only for that item and must leave the room for any other confidential items.
· In any case of doubt, the ruling of the chairperson is final.
Members of the meeting
· The members of the meeting remain (all Governing Body members if the meeting is a Governing Body meeting; all members of the committee if the meeting is a committee meeting).
· However, standing orders require that a councillor who has a pecuniary conflict of interest leave the room.
· All councillors have the right to attend any meeting of a committee and councillors who are not members of a committee may remain, subject to any limitations in standing orders.
Independent Māori Statutory Board
· Members of the Independent Māori Statutory Board who are appointed members of the committee remain.
· Independent Māori Statutory Board members and staff remain if this is necessary in order for them to perform their role.
Staff
· All staff supporting the meeting (administrative, senior management) remain.
· Other staff who need to because of their role may remain.
Local Board members
· Local Board members who need to hear the matter being discussed in order to perform their role may remain. This will usually be if the matter affects, or is relevant to, a particular Local Board area.
Council Controlled Organisations
· Representatives of a Council Controlled Organisation can remain only if required to for discussion of a matter relevant to the Council Controlled Organisation.
Strategic Procurement Committee 02 May 2018 |
ITEM TABLE OF CONTENTS PAGE
1 Apologies 7
2 Declaration of Interest 7
3 Confirmation of Minutes 7
4 Petitions 7
5 Public Input 7
6 Local Board Input 7
7 Extraordinary Business 8
8 Notices of Motion 8
9 Information report – 2 May 2018 9
10 Graffiti Eradication and Enforcement Services Contracts 17
11 Consideration of Extraordinary Items
PUBLIC EXCLUDED
12 Procedural Motion to Exclude the Public 21
C1 CONFIDENTIAL: Graffiti Eradication and Enforcement Services Contracts 21
C2 CONFIDENTIAL: Community Facilities contracts performance update 21
Strategic Procurement Committee 02 May 2018 |
Apologies from Deputy Mayor Bill Cashmore and Mayor Phil Goff have been received.
Members are reminded of the need to be vigilant to stand aside from decision making when a conflict arises between their role as a member and any private or other external interest they might have.
That the Strategic Procurement Committee: a) confirm the ordinary minutes of its meeting, held on Wednesday, 4 April 2018, including the confidential section, as a true and correct record.
|
At the close of the agenda no requests to present petitions had been received.
Standing Order 7.7 provides for Public Input. Applications to speak must be made to the Governance Advisor, in writing, no later than one (1) clear working day prior to the meeting and must include the subject matter. The meeting Chairperson has the discretion to decline any application that does not meet the requirements of Standing Orders. A maximum of thirty (30) minutes is allocated to the period for public input with five (5) minutes speaking time for each speaker.
At the close of the agenda no requests for public input had been received.
Standing Order 6.2 provides for Local Board Input. The Chairperson (or nominee of that Chairperson) is entitled to speak for up to five (5) minutes during this time. The Chairperson of the Local Board (or nominee of that Chairperson) shall wherever practical, give one (1) day’s notice of their wish to speak. The meeting Chairperson has the discretion to decline any application that does not meet the requirements of Standing Orders.
This right is in addition to the right under Standing Order 6.1 to speak to matters on the agenda.
At the close of the agenda no requests for local board input had been received.
Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (as amended) states:
“An item that is not on the agenda for a meeting may be dealt with at that meeting if-
(a) The local authority by resolution so decides; and
(b) The presiding member explains at the meeting, at a time when it is open to the public,-
(i) The reason why the item is not on the agenda; and
(ii) The reason why the discussion of the item cannot be delayed until a subsequent meeting.”
Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (as amended) states:
“Where an item is not on the agenda for a meeting,-
(a) That item may be discussed at that meeting if-
(i) That item is a minor matter relating to the general business of the local authority; and
(ii) the presiding member explains at the beginning of the meeting, at a time when it is open to the public, that the item will be discussed at the meeting; but
(b) no resolution, decision or recommendation may be made in respect of that item except to refer that item to a subsequent meeting of the local authority for further discussion.”
There were no notices of motion.
Strategic Procurement Committee 02 May 2018 |
Information report – 2 May 2018
File No.: CP2018/05217
Te take mō te pūrongo / Purpose of the report
1. To note progress on the forward work programme (Attachment A).
Whakarāpopototanga matua / Executive summary
2. This is regular information-only report which aims to provide public visibility of information circulated to committee members via memo or other means, where no decisions are required.
3. Note that, unlike an agenda decision report, staff will not be present to answer questions about these items referred to in this summary.
Ngā tūtohunga / Recommendation/s That the Strategic Procurement Committee: a) receive the information report – 2 May 2018.
|
Ngā tāpirihanga / Attachments
No. |
Title |
Page |
a⇩ |
Strategic Procurement Committee - Forward Work Programme 2 May 2018 |
11 |
Ngā kaihaina / Signatories
Author |
Michelle Judge - Governance Advisor |
Authoriser |
Jazz Singh - General Manager Procurement |
Strategic Procurement Committee 02 May 2018 |
|
STRATEGIC PROCUREMENT COMMITTEE FORWARD WORK PROGRAMME 2018 This committee deals with ensuring sound procurement processes are followed in order to deliver on the work programme and operations outlined in council’s adopted Annual Plan. It has responsibility for awarding contracts of $22.5 million or greater, awarding sensitive contracts and oversight of procurement strategies, processes and procedures.
|
||||||||
Priorities for 2018 will be on initiatives which:
1. Delivery on Annual Plan Outcomes 2. Review delivery of Capital Projects 3. Endorse Procurement Category Strategies 4. Enhance Group Sourced Procurement Improve Procurement Maturity |
The work of the Committee will:
· Approve award of contracts and variations within the Committee’s delegations · Monitor the delivery programme of major capital projects and recommend reporting to Finance and Performance Committee · Endorse procurement strategies and process improvements related to the Committee’s responsibilities. · Monitor progress and make recommendations on group sourced procurement activities |
||||||||
1. Delivery on Annual Plan outcomes (Contracts to be awarded) |
|||||||||
Priority # |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
||||
FY18 |
FY19 |
||||||||
Apr-Jun |
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
|||||
1.1 |
City Centre Development |
Approve procurement plan and award contract for City Centre Development project |
Decision: Agree procurement plan and award contract Progress to date: Update received at the 13 December 2017 meeting Resolution number STR/2017/59 - Item C4 Next Update will be considered in |
$370m (total council family spend) |
Q4 June 18 |
|
|
|
|
1.2 |
Building Consents Regional Overflow Model |
Approve the procurement plan for the Building Consents Regional Overflow Model |
Progress to date: Decision: agree procurement plan- 13 December 2017 meeting, Resolution Number STR/2017/60 – Item C5 |
|
Q4 June 18 |
|
|
|
|
1.3 |
America’s Cup 36 progress update |
Update on the infrastructure delivery in support of AC36 |
Receive: progress update |
$212m |
|
Q1 July 18 |
|
|
|
1.4 |
Organics (Food Waste) Processing, caddies and food waste bins |
Award contract for food waste process service, caddies and bins |
Decision: Agree to award contract |
|
|
Q1 August 18 |
|
|
|
St Marys Bay Outfall construction contract |
Approve procurement plan and then award contract for St Marys Bay stormwater project |
Decision: Agree procurement plan and award contract |
$35 million |
|
Q1 August 18 |
|
|
|
2. Review delivery of Capital Projects |
|||||||||||
Priority # |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
|
|||||
FY18 |
FY19 |
|
|||||||||
Apr-Jun |
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
|
||||||
2.1 |
Elected member oversight of progress of Major Projects |
Progress to date: Update received at the 6 September 2017 meeting Resolution number STR/2017/37 - Item C2. Update received at the 13 December 2017 meeting Resolution number STR/2017/61 - Item C6. Update received at the 7 March 2018 meeting Resolution number STR/2018/11- Item C2. Next Update will be considered in June 2018. Receive: No decisions required |
|
Q4 June 18 |
|
|
|
|
|
||
2.2 |
Elected member oversight of pipeline of activity for capital works delivery forward work programme |
Receive: No decisions required |
|
Q4 June 18 |
|
|
|
|
|
||
3. Endorse Procurement Category Strategies |
||||||||||
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
|||||
FY18 |
FY19 |
|||||||||
Apr-Jun |
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
||||||
3.1 |
Aaron Donaldson |
Create a plan for engaging the market to purchase Software. |
Receive: No decision required |
|
Q4 June 18 |
|
|
|
|
|
3.2 |
George Joseph |
Vertical Construction Category Strategy |
Development of the overall strategy for vertical construction and building |
Receive: No decision required |
|
|
Q1 July 18 |
|
|
|
3.3 |
Aaron Donaldson |
ICT Technology Services |
Create a plan for engaging the market to purchase Technology Services – Cloud, Data Centre Services, Print, Network. |
Receive: No decision required |
|
|
Q1 July 18 |
|
|
|
3.4 |
Aaron Donaldson |
Professional Services |
Create a plan to go to market and manage professional services across Auckland Council. |
Receive: No decision required |
|
|
Q1 July 18 |
|
|
|
3.5 |
Peter Cunningham |
Professional Technical Services |
Implementation of professional technical services category |
Receive: No decision required – update from approved strategy by T&P 2016 |
|
|
Q1 July 18 |
|
|
|
4. Enhance Group Sourced Procurement |
||||||||||
Priority # |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known
|
||||
FY18 |
FY19 |
|||||||||
Apr-Jun |
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
||||||
4.1 |
Alan McDonnell |
Keep Committee informed on progress of Fleet changes |
Update received at the meeting on 7 March 2018 Resolution number STR/2018/5 – Receive: No decision needed |
|
Q1 July 18 |
|
|
|
|
|
4.2 |
Jazz Singh |
Group Sourced Procurement update |
Keep Committee informed on progress against Group Sourced Procurement objectives |
Progress to date: Update provided at the October 2017 meeting Resolution number STR/2017/4 Update received at the meeting on 7 March 2018 Resolution number STR/2018/4– Receive: no decision required |
|
Q1 July 18 |
|
|
|
|
5. Improve Procurement Maturity |
||||||
Priority # |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
See completed section below
6. Other |
||||||||||
Priority # |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
||||
FY17 |
FY18 |
|||||||||
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
|||||||
6.1 |
Alan McDonnell |
Review of Project 17 Contract performance |
Update the Committee on the performance of suppliers against key performance metrics under the Project 17 Full Facilities Maintenance contracts |
Receive: No decision required |
|
|
|
|
Q4 May 18 |
|
Completed
1. Delivery on Annual Plan outcomes (Contracts to be awarded) |
||||||||||
Priority |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
||||
|
|
|
|
|
|
FY17 |
FY18 |
|||
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
|||||||
1.1 |
Alan McDonnell |
Refuse Collections |
Change from collection of Bags to Bins for Waitakere and North Shore. Part of aligning refuse collection services across the region |
Decision: Agree to extend current contract
with Veolia for a further 2 years – |
|
Q1 Sep 17 |
|
|
|
|
1.2 |
Alan McDonnell |
Electricity Procurement |
Approve Procurement Plan for Electricity procurement |
Update provided at the October 2017 meeting Resolution number STR/2017/47 - Item C3 |
|
|
Q2 Oct 17 |
|
|
|
1.3 |
Aaron Donaldson |
External Legal Services |
Council has gone out to market for external legal services. Additional scope may mean the contract value over the term of the engagement will exceed $22.5m |
Decision: Agree to contract awards for 2 years.- 13 December 2017 meeting, Resolution Number STR/2017/57 – Item C2 |
|
|
Q2 Dec 17 |
|
|
|
1.4 |
Alan McDonnell |
Graffiti Eradication and Enforcement Services |
Approve procurement plan for graffiti Eradication and Enforcement Services |
Decision: agree procurement plan- 13 December 2017 meeting, Resolution Number STR/2017/58 – Item C3 |
|
|
|
|
Q4 May 18 |
|
1.5 |
Alan McDonnell |
Electricity supply SRR |
Approve the supplier recommendation report for electricity supply services |
Decision: agree SRR- 13 December 2017 meeting, Resolution Number STR/2017/56 – Item C1 |
|
|
Q2 Dec 17 |
|
|
|
1.6 |
Peter Cunningham |
Overflow Planning Services |
Approve the procurement plan for overflow planning services to process resource consents. |
Decision: approve procurement plan Decision taken to approve the procurement plan. Resolution number STR/2018/13 – item C2 |
$30 million |
|
|
|
Q4 April 18 |
|
1.7 |
Aaron Donaldson |
External Recruitment Supplier |
Current All of Government (AoG) contract expires October 2017. New AoG contracts have been negotiated by MBIE. Council will enter into AoG agreements for six months and assess whether they meet our needs. |
Decision: Agree to extend AoG agreements or run own market exercise. Decision taken to extend AoG agreements at 4 April meeting. Resolution number STR/2018/12 – item C1 |
|
|
|
|
Q4 April 18 |
|
3. Endorse Procurement Category Strategies |
|||||||||
Priority # |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
|||
3.1 |
Alan McDonnell |
Waste Solutions Procurement Strategy |
Create plan for go to market exercise for all waste collection (including food waste) and disposal activity prior to 2020 |
Decision: Confirm strategy/challenge Update provided at the October 2017 meeting Resolution number STR/2017/40 - Item 9 |
|
|
Q2 Oct 17 |
|
|
3.2 |
Alan McDonnell |
Organics (food waste) Processing caddies and food waste bins |
Create plan for go to market exercise for all aspects of the planned Organic (food waste) collection and Processing Service together with the caddies and bins required for collection. |
Update provided at the October 2017 meeting Resolution number STR/2017/40- Item 9 and Resolution number STR/2017/45 – C1 |
|
|
Q2 Oct 17 |
|
|
3.3 |
Aaron Donaldson |
ICT hardware |
Create a plan for engaging the market to purchase ICT Hardware. |
Update received at the meeting on 7 March 2018 Resolution number STR/2018/10 – Item C1. Receive: No decision required |
|
|
|
Q3 Mar 18 |
|
4. Enhance Group Sourced Procurement |
|||||||||
Priority # |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
|||
FY17 |
FY18 |
||||||||
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
||||||
4.1 |
Jazz Singh |
Sustainable Procurement Framework |
Give effect to principles to be agreed in Group Procurement Policy |
Update provided at the December 2017 meeting. Resolution number STR/2017/53 Item 9 |
|
|
Q2 Dec 17 |
|
|
5. Improve Procurement Maturity |
||||||||||
Priority |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
||||
|
|
|
|
|
|
FY17 |
FY18 |
|||
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
|||||||
5.1 |
Jazz Singh |
Ariba update |
Update Committee on implementation of procurement enabling technology |
Update provided at the October 2017 meeting Resolution number STR/2017/4 |
|
|
Q2 Oct 17 |
|
|
|
6. Other |
||||||||||
Priority # |
Lead This column is not for inclusion in the public agenda |
Area of work |
Reason for work |
Strategic Procurement Committee role (decision or direction) |
Budget / Funding |
Expected timeframes Highlight financial year quarter and state month if known |
||||
FY17 |
FY18 |
|||||||||
Jul-Sep |
Oct-Dec |
Jan-Mar |
Apr-Jun |
|||||||
6.1 |
Alan McDonnell |
Update on Waste Solutions contracts |
Update the Committee on the current state of all waste contracts prior to the preparation of the Waste Solutions Procurement Strategy |
Update provided at the October 2017 meeting Resolution number STR/2017/41- Item 10 and Resolution number STR/2017/46 – C2 |
|
|
Q2 Oct 17 |
|
|
|
Strategic Procurement Committee 02 May 2018 |
Graffiti Eradication and Enforcement Services Contracts
File No.: CP2018/05495
Te take mō te pūrongo / Purpose of the report
1. To seek approval from the Strategic Procurement Committee for the Supplier Recommendation Report for graffiti eradication and enforcement services.
Whakarāpopototanga matua / Executive summary
2. The current graffiti eradication and enforcement services contracts for Auckland Council, and specific Auckland Transport (AT) assets, will expire on 30 June 2018.
3. Council and AT used an open market process to tender their Graffiti Eradication and Enforcement Services contracts in January 2018. Requests for Proposal (RFPs) closed on 7 February 2018.
4. Two RFPs were issued to the market, these will award the following contracts:
· Graffiti Eradication Services split into four contract areas (North, West, Central and South).
· Graffiti Enforcement Services contract for the whole Auckland region.
5. The objectives of these contracts are aligned with Auckland Graffiti Vandalism Prevention Plan (“The Plan”). The Plan was approved by the Regional Development and Operations Committee (RDOC) in March 2012. The Plan establishes a single, locally orientated, approach to managing Auckland Council’s response to graffiti vandalism, and enables the prevention, management and reduction of graffiti vandalism across the Auckland region.
6. The Arts, Community and Events (ACE) and Waste Solutions departments have previously explored using a common supplier/s to deliver both graffiti eradication and illegal dumping services for each contract area.
7. ACE and Waste Solutions separately approached the market, with each RFP cross-referencing the other to reflect the shared intentions for graffiti eradication and illegal dumping. However, after rigorous evaluation, the ACE and Waste Solutions selection panels could not find any synergies so have decided to award contracts to different suppliers.
8. The suggested contracts will bring the following benefits to Auckland Council:
· align Auckland Council Group’s graffiti eradication and prevention services with the Auckland Council Graffiti Vandalism Prevention Plan (The Plan).
· include graffiti services’ contract requirements in some of AT’s owned and managed assets.
· ensure Auckland Council is getting the best value for money.
· ensure consistent quality and services are provided across the Auckland region.
· apply creative thinking and innovative ideas which are critical to quality service delivery.
· ensure that the three Es approach (eradication, enforcement and education) is applied to graffiti vandalism contracts, which will enhance community safety.
· ensure a whole-community approach to preventing graffiti vandalism is included in the graffiti contracts. Information and tools will be provided to community groups, volunteers, residents, businesses and youth.
· apply practical enforcement steps that complement criminal legislation, as part of a package of measures to prevent graffiti vandalism.
· provide an opportunity for suppliers to suggest changes to council’s graffiti eradication programme to meet the programme’s objectives.
· ensure suppliers provide proactive services, which support police in targeting recidivist offenders, emerging offenders and hot spot locations across Auckland.
Horopaki / Context
9. Council delivers graffiti vandalism prevention services to enhance the visual appeal of the city and to create communities that are safe and feel safe.
10. Successfully implementing the plan involves selecting the right suppliers to work with, including how they are distributed across the region. This will ensure Auckland ratepayers receive value for money for the services provided.
11. Current graffiti eradication and enforcement services contracts at council, as well as some of Auckland Transport’s assets, represent an estimated total annual value of $4.142M. Examples of AT assets include bridges, street furniture and signage. There are different suppliers for each contract area. The following contracts are scheduled to expire on 30 June 2018:
· Graffiti eradication services contracts across four areas (North, West, Central and South)
· Graffiti enforcement services contract across the Auckland region.
Tātaritanga me ngā tohutohu / Analysis and advice
12. The confidential report sets out the analysis and advice leading to these recommendations.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te
poari ā-rohe /
Local impacts and local board views
13. The Regional Development and Operations Committee (RDOC) adopted the Plan in 2012. The Plan incorporates feedback from 16 local boards and is aligned with their own plans. It provides a basis for creating and maintaining the graffiti eradication and enforcement services contracts.
Tauākī whakaaweawe Māori / Māori impact statement
14. Mana whenua were not consulted on the RFP process. If these contracts are endorsed, all communities, including Māori, will benefit from a cleaner, graffiti-free city. Neighbourhoods which feel safer ultimately contribute to council’s vision of making Auckland a world-class city.
Ngā ritenga ā-pūtea / Financial implications
15. The final negotiated contract price for each of the five recommended suppliers is below the allocated budget for the contracts.
Ngā raru tūpono / Risks
16. Failure to approve the supplier recommendation could disrupt the delivery of these key services as there will be no contracted suppliers to deliver the graffiti eradication and enforcement services contracts. These services form a critical part of the Auckland Graffiti Vandalism Prevention Plan.
Ngā koringa ā-muri / Next steps
17. The new contracts will commence on 1 July 2018. They will have an initial term of five years, with four rights of renewal of one year each at council’s discretion. This means that contracts may be in place for up to nine years each.
18. A total of five suppliers will deliver graffiti eradication and enforcement services across Auckland.
19. The contracts are also subject to suppliers’ capability to meet and/or exceed their Key Performance Indicators (KPIs).
Ngā tāpirihanga / Attachments
There are no attachments for this report.
Ngā kaihaina / Signatories
Author |
Uly Alejandrino - Strategic Procurement Specialist |
Authorisers |
Graham Bodman - General Manager Arts, Community and Events Jazz Singh - General Manager Procurement |
Strategic Procurement Committee 02 May 2018 |
Exclusion of the Public: Local Government Official Information and Meetings Act 1987
a)
That the Strategic Procurement Committee:
a) exclude the public from the following part(s) of the proceedings of this meeting.
The general subject of each matter to be considered while the public is excluded, the reason for passing this resolution in relation to each matter, and the specific grounds under section 48(1) of the Local Government Official Information and Meetings Act 1987 for the passing of this resolution follows.
This resolution is made in reliance on section 48(1)(a) of the Local Government Official Information and Meetings Act 1987 and the particular interest or interests protected by section 6 or section 7 of that Act which would be prejudiced by the holding of the whole or relevant part of the proceedings of the meeting in public, as follows:
C1 CONFIDENTIAL: Graffiti Eradication and Enforcement Services Contracts
Reason for passing this resolution in relation to each matter |
Particular interest(s) protected (where applicable) |
Ground(s) under section 48(1) for the passing of this resolution |
The public conduct of the part of the meeting would be likely to result in the disclosure of information for which good reason for withholding exists under section 7. |
s7(2)(h) - The withholding of the information is necessary to enable the local authority to carry out, without prejudice or disadvantage, commercial activities. In particular, the report contains information that could prejudice council's position with suppliers. |
s48(1)(a) The public conduct of the part of the meeting would be likely to result in the disclosure of information for which good reason for withholding exists under section 7. |
C2 CONFIDENTIAL: Community Facilities contracts performance update
Reason for passing this resolution in relation to each matter |
Particular interest(s) protected (where applicable) |
Ground(s) under section 48(1) for the passing of this resolution |
The public conduct of the part of the meeting would be likely to result in the disclosure of information for which good reason for withholding exists under section 7. |
s7(2)(h) - The withholding of the information is necessary to enable the local authority to carry out, without prejudice or disadvantage, commercial activities. In particular, the report contains information that could prejudice council's position with suppliers. |
s48(1)(a) The public conduct of the part of the meeting would be likely to result in the disclosure of information for which good reason for withholding exists under section 7. |