I hereby give notice that an ordinary meeting of the Ōrākei Local Board will be held on:

 

Date:

Time:

Meeting Room:

Venue:

 

Thursday, 20 June 2019

3.00pm

St Chads Church and Community Centre
38 St Johns Road
Meadowbank

 

Ōrākei Local Board

 

OPEN ADDENDUM AGENDA

 

 

 

 

MEMBERSHIP

 

Chairperson

Kit Parkinson

 

Deputy Chairperson

Carmel Claridge

 

Members

Troy Churton

 

 

Colin Davis, JP

 

 

Toni Millar, QSM, JP

 

 

Ros Rundle

 

 

David Wong, JP

 

 

(Quorum 4 members)

 

 

 

Kim  Lawgun

Democracy Advisor

 

17 June 2019

 

Contact Telephone: 021 302 163

Email: Kim.lawgun@aucklandcouncil.govt.nz

Website: www.aucklandcouncil.govt.nz

 

 

 


Ōrākei Local Board

20 June 2019

 

 

ITEM   TABLE OF CONTENTS                                                                                         PAGE

    

12        Approval of the Ōrākei Local Board 2019/2020 Community Services Work Programme                                                                                                                     5

13        Re-allocation of Ōrākei Local Board Locally Driven Initiative Opex June 2019   23

14        Ōrākei Local Board Community Facilities Work Programme 2019 - 2022            27 

 

      


Ōrākei Local Board

20 June 2019

 

 

Approval of the Ōrākei Local Board 2019/2020 Community Services Work Programme

File No.: CP2019/10335

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To approve the 2019/2020 Community Services work programme (Attachment A). 

Whakarāpopototanga matua

Executive summary

2.       Each financial year, a work programme is developed that details the activities to be delivered in the local board area. The development process is supported by a series of workshops with the local board.

3.       To prepare for the 2019/2020 work programme staff representing relevant operational council departments worked together to ensure an integrated approach.

4.       This report presents the draft 2019/2020 Community Services work programme, which responds to Ōrākei Local Board Plan 2017 outcomes and reflects the priorities that have been agreed by departments across council.

5.       Delivery of new activities in the work programme will commence from 1 July 2019. The local board will be updated quarterly on delivery progress, highlights, potential delays and budget implications.

 

Ngā tūtohunga

Recommendation/s

That the Ōrākei Local Board:

a)      approve the 2019/2020 Community Services work programme (Attachment A to the agenda report). 

 

 

Horopaki

Context

6.       The local board decides which activities to allocate its annual work programme budget to in order to achieve the outcomes set out in its 2017 Local Board Plan.

7.       The development of the 2019/2020 work programme has built on the approach piloted for 2018/2019, which enabled staff to work in a more integrated way across departments to improve local outcomes.

8.       In preparation for the 2019/2020 work programme process, an overview group was created from the following council departments to develop an agreed approach to achieve improved integration:

·   Arts, Community and Events

·   Community Facilities

·   Libraries

·   Infrastructure and Environmental Services

·   Parks, Sports and Recreation

·   Community Services - Service, Strategy and Integration.

9.       Teams made up of representatives from these departments were established to explore shared priorities and objectives for each local board area, and to develop the work programme in a collaborative way in response to local board plan outcomes.

10.     Table one shows the business objectives and strategic alignment for community services departments.

Table 1: Adopted community-based strategies and plans

Department

Business objectives

Strategies and plans

Arts, Community and Events

Provision of services, programmes, events and facilities that strengthen and connect communities and create a sense of belonging and pride

·  Hire Fee Framework

·  Events Policy

·  Toi Whītiki

·  Thriving Communities

Libraries

Provision of library services and programmes that support Aucklanders with reading and literacy, and opportunities to participate in community and civic life

·  Te Kauroa

 

Parks, Sports and Recreation

Provision of services to actively engage Aucklanders to lead healthy lives, connect with nature and value our cultural identity

·   Parks and Open Space Strategic Action Plan

·   Sport and Recreation Strategic Action Plan

·   Auckland Growing Greener Framework

·   Urban Ngāhere Strategy

Service, Strategy and Integration

Provision of service and asset planning advice and support more integrated delivery of community outcomes

·   Community Facilities Network Plan

·   Parks and Open Space Strategic Action Plan

 

Tātaritanga me ngā tohutohu

Analysis and advice

11.     The local board provided feedback on proposed activities for the new financial year at a series of workshops between September 2018 and May 2019.

12.     Initial workshops were an opportunity for the local board to communicate to staff its strategic direction. At subsequent workshops, the local board discussed its priorities for budget allocation and requested further scoping for existing and new activities.

13.     The activities in the work programme respond to the outcomes and objectives that the local board identified in its 2017 Local Board Plan.

14.     The work programme is made up of approved activities from previous financial years, including annually occurring events or projects and ongoing programmes. It also includes new initiatives supported by the local board.

15.     Budget is allocated to activities for the 2019/2020 financial year. If zero-dollars is shown this reflects that the project is able to be delivered in-house with no additional external technical advice and support.

16.     Table two shows activities and allocated budget that are new in 2019/2020 or are significantly different to the 2018/2019 work programme.

Table 2: New and significant changes activities

Line number

Activity

Activity description

2018/2019 budget

2019/2020 budget

Local board plan outcome:  Our local parks and open space areas are valued and enjoyed

539

(new)

Pourewa Valley Integrated Plan

Prepare a visionary plan for the whole of the Pourewa Valley which integrates the Kepa Bush work, Ngāti Whātua Ōrākei plan, and incorporates the various community group efforts

$0

$40,000

1233

(new)

Ōrākei Local Parks Management Plan

Develop a multi-park management plan (year 1 of 2) that assists the Ōrākei Local Board in managing use, development and protection of all parks, reserves and other open space they have allocated decision-making for

$0

$60,000

1313

(new)

ANZAC Day Speech Competition

Deliver Speech Competition for ANZAC Day

$0

$3,000

Local board plan outcome:  Our residents are proud of their community facilities and public places

623

(new)

Youth Empowerment

Fund and partner with a local community group/organisation to facilitate and grow the Youth Voice Forum to ensure that local young people have their say in council planning and decision making

$0

$4,000

661

Community Arts Programmes

$20,000 to produce a music programme for Matariki. The second $20,000 will be workshopped in Q1

$22,000

$40,000

1076

(new)

Ellerslie War Memorial Hall Needs Assessment

Undertake a community needs assessment that identifies current usage and users of the Ellerslie War Memorial Hall from a network perspective

$0

$20,000

1185

(new)

Community-led placemaking neighbourhood development projects

Support placemaking projects that foster community identity and encourage shared action

$0

$20,000

1236

(new)

Ōrākei Volunteer Awards

Deliver Ōrākei Volunteer Awards

$0

$8,000

3204

(new)

Seniors and age-friendly communities forum

Support local age friendly initiatives and assess the age friendliness of the local board area

$0

$4,000

Local board plan outcome:  A thriving economy which supports local businesses and town centres

1311

(new)

Ōrākei Local Board Business Awards

A local business award programme will be run to provide opportunities for businesses to benchmark their success against other local businesses

$0

$25,000

 

17.     The way in which Community Places activities are presented in the work programme has changed for 2019/2020. Work related to the operation of venues for hire, community centres, houses, hubs and rural halls will now be reported by the following levels of service: Access, Activation and Intervention Programming.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

18.     The work programme has been developed by a collective of operational council departments.

19.     The inter-departmental connections made throughout the process will enable an integrated approach to delivery of the activities and allow for further collaboration throughout the year. These working relationships will also support an integrated approach to work programme development in future years.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

20.     The local board provided direction and feedback on the draft work programme at a series of workshops.  

21.     These workshops provided an opportunity for staff to gain an understanding of local board strategic direction and priorities. Budget allocation, activity content and scoping were discussed and refined.

22.     The activities in the final work programme support achieving local board plan outcomes and objectives.

Tauākī whakaaweawe Māori

Māori impact statement

23.     Community services and Community Facilities have developed Karanga Atu! Karanga Mai!, a relationship approach which guides staff to deliver on agreed work programme activities and support the local board to achieve outcomes in its local board plan.

24.     The approach responds to Māori aspirations and delivers on council’s statutory obligations and relationship commitments to Māori.

25.     Table three outlines the activities in the 2019/2020 work programme where Māori responsiveness is the primary outcome.

Table 3: Māori impact of proposed activities

Line number

Activity

Māori impact

955

Celebrating Te Ao Māori and strengthening responsiveness to Māori. Whakatipu i te reo Māori – Ōrākei

Celebrating te ao Māori with events and programmes including regionally coordinated and promoted programmes:

·  Te Tiriti o Waitangi, Matariki and Māori Language Week

·  engaging with Iwi and Māori organisations

·  Whakatipu i te reo Māori - champion and embed te reo Māori in our libraries and communities.

 

Ngā ritenga ā-pūtea

Financial implications

26.     Activities are funded from one or multiple budget sources which include: Asset Based Services (ABS) Opex; Locally Driven Initiatives (LDI) Capex and Opex.

27.     Each activity line has a budget allocation, which covers the delivery for the 2019/2020 period. Where activity lines show a zero-dollar budget, this reflects that the implementation costs are met through staff salary or other funding sources.

28.     The community services LDI budget for the local board for the 2019/2020 financial year is $792,280.

29.     Where activities are cancelled or no longer required, the local board can reallocate the budget to an existing work programme activity or create a new activity.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

30.     The key risks for activities that are managed through the work programme are non-delivery, time delays and budget overrun. The local board will be updated quarterly on delivery including highlighting any potential delays and budget implications.

31.     As the work programme includes ongoing activity and annually occurring events or projects, the associated risks have been identified and managed in previous years. Additional risk management for these activities is ongoing and can be reported quarterly.

32.     Risks and mitigations for new activity lines were considered during the scoping phase. There may be risks associated with trialling a new activity for the first year. These will be continually assessed and reported to the local board through quarterly reporting when required.

Ngā koringa ā-muri

Next steps

33.     Delivery of approved activities will commence at the beginning of the financial year, 1 July 2019 and progress will be reported to the local board for each quarter.

34.     The work programme identifies further decisions and milestones for each activity, these will be brought to the local board when appropriate.

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Ōrākei community services 2019/2020 work programme

13

      

Ngā kaihaina

Signatories

Authors

Graham Bodman - General Manager Arts, Community and Events

Mirla Edmundson - General Manager Libraries & Information

Mace Ward - General Manager Parks, Sports and Recreation

Lisa Tocker - Head of Service Strategy and Integration

Authorisers

Ian Maxwell - Director Community Services

Adam Milina - Relationship Manager - Albert-Eden & Orakei Local Boards

 



Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator


Ōrākei Local Board

20 June 2019

 

 

PDF Creator



Ōrākei Local Board

20 June 2019

 

 

Re-allocation of Ōrākei Local Board Locally Driven Initiative Opex June 2019

File No.: CP2019/10759

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To approve the reallocation of the 2018/2019 Locally Driven Initiative operational expenditure budget of $62,000 for the Tahuna Torea mangrove removal project and approve the reallocation of the Locally Driven Initiative operational expenditure carry forward budget of $57,000 for the Tahuna Torea mangrove removal project.

Whakarāpopototanga matua

Executive summary

2.       The Ōrākei Local Board approved the Tahuna Torea mangrove removal project as part of the 2015/2016 Local and Sports parks annual work programme, allocating $65,000 LDI opex funding.

3.       In July 2018 the board allocated an additional $62,000 of LDI opex to the project as part of the 2018/2019 Community Facilities work programme.

4.       The primary objective for the project is to preserve the fish dams, which are an archaeological feature and wāhi tapu site at the Tahuna Torea Reserve. Additionally, the removal of the mangroves is also intended to assist with the protective regrowth of grasses by reducing shade suppression.

5.       Findings from a pilot study at Tahuna Torea have provided evidence that the removal of the mangroves may not be providing the desired outcome for protecting the Fish Dams and promoting establishment of the grasses in the area.

6.       Staff recommend that the mangrove removal at Tahuna Torea is cancelled.  This will enable staff to further investigate options for improved outcomes for the Tahuna Torea Reserve.

7.       If the Board agree to cancel the project, there is a significant amount of 2018/2019 LDI opex to reallocate and staff recommend that the board consider reallocating to projects in the 2018/2019 work programme.

 

Ngā tūtohunga

Recommendation/s

That the Ōrākei Local Board:

a)      approve the reallocation of the 2018/2019 Locally Driven Initiative operational expenditure budget of $62,000 for the Tahuna Torea mangrove removal project to the Service provision for parks and recreation – Colin Maiden Precinct transportation analysis project.

b)      approve the reallocation of the Locally Driven Initiative operational expenditure carry forward budget of $57,000 for the Tahuna Torea mangrove removal project to Hobson Bay mangrove removal project.

 

Horopaki

Context

8.       The Tahuna Torea mangrove removal project has an LDI opex budget of $119,000 made up of carry forward from financial year 2015/2016 and $62,000 allocated from financial year 2018/2019.

9.       The intended outcome of the mangrove removal at Tahuna Torea is to protect the archeologically significant fish dams at the reserve, and to support the establishment of grass vegetation at the site.

10.     Following a pilot programme, staff have concluded that the mangrove removal has not resulted in the protection of the fish dams, nor supported the establishment of restored grass growth in the area. Staff will report formally to the local board with the comprehensive findings from the pilot programme in August 2019.

Tātaritanga me ngā tohutohu

Analysis and advice

Tahuna Torea Mangrove Removal

 

11.     The primary objective for mangrove removal is to preserve the fish dams, which are an archaeological feature and wāhi tapu site at Tahuna Torea Reserve.

12.     The removal of the mangroves is also intended to improve the establishment of grasses by reducing shade suppression. A pilot programme involving the removal of 50m2 of mangroves at Tahuna Torea in December 2017 indicates that coastal processes, as opposed to mangrove encroachment, are likely to be the most dynamic influence on the preservation of the fish dams. Furthermore, where mangroves were removed, the protective regrowth of grasses was not established.

13.     Staff recommend that further consideration is required to determine an appropriate long-term solution, taking into consideration the nature of the site and the factors influencing the ecology of the coastal environment.

14.     While decisions regarding the long-term solution at Tahuna Torea are pending, staff recommend that the local board reallocates the budget approved for Tahuna Torea mangrove removal (2308) and reallocate the LDI opex funding of $119,000 for project to the following two alternative projects:

·   Service provision for parks and recreation (1440) - Colin Maiden Precinct transportation analysis

·   Hobson Bay - mangrove removal (2307).

Service provision for parks and recreation (1440) - Colin Maiden Transportation Analysis

15.     On 2 April 2019, Parks, Sport and Recreation staff presented a memorandum to the Board providing an update on the delivery of the Colin Maiden Precinct Master Plan.

16.     In the memorandum staff recommend undertaking a comprehensive transportation analysis of the Colin Maiden Precinct to inform the future development and forecast capital expenditure for roads, footpaths, pathways and parking throughout the precinct.

17.     The proposed cost to deliver the transportation analysis is estimated at $85,000.

18.     Staff recommend that the Ōrākei Local Board use the remaining $30,000 from the financial year 2018/2019 Ōrākei Parks Response Fund and consider allocating additional funding from unspent LDI opex in financial year 2018/2019.

19.     There is $62,000 of unspent LDI opex in financial year 2018/2019 currently allocated to the Tahuna Torea – remove mangroves (2308). Staff recommend this budget is reallocated to Service provision for parks and recreation (1440) - Colin Maiden Precinct transportation analysis.

20.     If approved, the funding will enable the delivery of a draft Colin Maiden Precinct transportation analysis report to the local board for discussion and recommendations in September 2019.

21.     If further funding is not secured in financial year 2018/2019, the delivery of the transportation analysis will be delayed impacting on future development of the precinct.

Hobson Bay Mangrove Removal

22.     Hobson Bay mangrove removal is an approved project in the Ōrākei Local Board Community Facilities 2018/2019 work programme.

23.     Currently there is $262,000 LDI opex and $66,000 LDI capex allocated to the removal of mangroves and required plantings at Hobson Bay.

24.     The tender price received to deliver the physical works is $429,000, indicating a budget shortfall of $101,000.

25.     In the proposed Community Facilities 2019/2020 work programme staff recommend that the Ōrākei Local Board allocate additional LDI opex in the amount of $44,000 to the Hobson Bay mangrove removal project. 

26.     The Community Facilities 2019/2020 work programme is scheduled to be approved at the local board business meeting on 20 June 2019.

27.     Staff also recommends that the Ōrākei Local Board reallocate unspent LDI opex in the amount of $57,000 from Tahuna Torea mangrove removal for the remaining required funding to deliver the Hobson Bay mangrove removal.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

28.     The report recommendations have been developed as a collaborative approach involving staff from Community Facilities, Park Sport and Recreation, Local Board Services and Lead Financial Advisors.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

29.     The report recommendations have been considered by the local board in workshops from April to June 2019.  The views expressed by local board members have informed staff recommendations for reallocation of unspent LDI opex.

Tauākī whakaaweawe Māori

Māori impact statement

30.     Work within the marine environment including mangrove removal is of high interest to mana whenua. The protection of the fish dams and wāhi tapu site at Tahuna Torea is of significant importance to mana whenua and engagement will be continued with the appropriate iwi.

Ngā ritenga ā-pūtea

Financial implications

31.     Tahuna Torea mangrove removal will not be delivered in this financial year and will result in unspent LDI opex to the amount of $119,000.

32.     The 2018/2019 Ōrākei Parks Response Fund remaining budget of f$30,000 is insufficient for the total estimated cost of $85,000 to deliver a transportation analysis for Colin Maiden Precinct. The reallocation of $62,000 of the LDI opex allocated to Tahuna Torea mangrove removal project will address the budget shortfall and enable the timely progression of the transportation analysis.

33.     Without sufficient funding the removal of mangroves at Hobson Bay cannot be delivered in the 2019/2020 financial year.  The current allocation of $262,000 LDI opex for this project requires an additional $101,000 to ensure the project is delivered in its entirety.  An additional $44,000 LDI opex is proposed for allocation in the financial year 2019/2020 work programme to assist with the shortfall.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

34.     If the proposed reallocation of the LDI Opex funding is not approved at the June 2019 business meeting, there is a risk that the Colin Maiden Precinct transportation analysis and the Hobson Bay mangrove removal will not be delivered within the 2019/2020 financial year.

Ngā koringa ā-muri

Next steps

35.     Upon approval of the reallocation of the LDI opex budget from the Tahuna Torea mangrove removal project to the Colin Maiden Precinct transport analysis and the Hobson Bay mangrove removal project, the transfer of funds will apply, and Community Facilities will commence with the work required.

36.     Progress and updates on the Colin Maiden Precinct transport analysis will be reported by Parks Sport and Recreation at local board workshops and a draft analysis report will be delivered in September 2019 for review and discussion.

37.     Progress and updates on the Hobson Bay mangrove removal will be reported by Community Facilities to the local board at workshops and through quarterly reporting in financial year 2019/2020.

 

Ngā tāpirihanga

Attachments

There are no attachments for this report.    

Ngā kaihaina

Signatories

Author

Jacqui Thompson Fell - Work Programme Lead

Authorisers

Rod Sheridan - General Manager Community Facilities

Adam Milina - Relationship Manager - Albert-Eden & Orakei Local Boards

 


Ōrākei Local Board

20 June 2019

 

 

Ōrākei Local Board Community Facilities Work Programme 2019 - 2022

File No.: CP2019/10131

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To approve the 2019 – 2022 Community Facilities Work Programme for the Ōrākei local board.

Whakarāpopototanga matua

Executive summary

2.       The Community Facilities department is responsible for the building, maintaining and renewing of all open spaces and community buildings. This includes the community leasing and licensing of council-owned premises.

3.       The Ōrākei local board 2019/2020 Community Facilities Work Programme was developed through a series of iterative workshops between key staff and local boards since October 2018. The projects identified in the work programme have been prioritised for investment based on a combination of local board feedback, staff assessments of assets and key stakeholder input.

4.       The work programme provided in Attachments A and B to this report reflect the projects that were presented in the last local board workshop with modifications based on feedback from the board, and with the inclusion of projects proposed to be funded from regional programmes.

5.       This report recommends that the board approves the 2019 - 2022 Community Facilities Work Programme and associated budget in full for projects commencing in the first year of the programme and in principle for subsequent two years.

6.       The work programme includes projects proposed to be funded from regional programmes, including local and sports field development (growth), coastal and slips prevention programmes. Inclusion of these projects in the local board work programme is subject to approval by the Environment and Community Committee in July 2019.

7.       It is recommended that the local board approve the inclusion of these projects in the work programme and provide feedback for consideration by the Environment and Community Committee.

8.       Several projects have been identified in the work programme as “risk adjusted programme (RAP)” projects. These are projects that have budget allocated in the 2020/2021 financial year.

9.       Approval is sought for staff to commence work on these projects in the 2019/2020 year so that they can be delivered early if other approved projects are delayed for any reason.

10.     To expedite delivery of the work programme, and to manage changes that may be required in a timely way, staff recommend that the board delegate decision making for amendments to the approved programme to the chair.

 

 

Ngā tūtohunga

Recommendation/s

That the Ōrākei Local Board:

a)      approve the 2019/2020 Community Facilities Work Programme as detailed in Attachment A – Build, Maintain, Renew and Attachment B – Community Leases to the agenda report

b)      approve in principle the 2020 – 2022 Community Facilities Work Programme (years 2 and 3) as detailed in Attachment A – Build, Maintain, Renew and Attachment B – Community Leases to the agenda report.

c)      approve the risk adjusted programme (RAP) projects identified in Attachment A to the agenda report as projects that may be delivered in advance of the expected delivery year, if required to meet expected financial expenditure for the 2019/2020 financial year.

d)      note that approval of budget allocation in the 2019/2020 year for multi-year projects may commit the board to the allocation of subsequent years budgets.

e)      note that the inclusion in the work programme of projects that are funded from the Coastal Renewals, Slips Prevention and Local Parks and Sports Field Development budgets are subject to approval of the identified budget allocation by the Environment and Community Committee in July 2019.

f)       provide feedback for consideration by the Environment and Community Committee in relation to the projects funded from the Coastal Renewals, Slips Prevention and Local Parks and Sports Field Development budgets.

g)      note that budget allocation for all projects in the 2019 – 2022 Community Facilities Work Programme are best current estimates, and amendments may be required to the work programme to accommodate final costs as the year progresses.

h)      delegate to the chairperson authority to approve minor amendments to the 2019 – 2022 Community Facilities Work Programme, following receipt of written advice from staff.

 

Horopaki

Context

11.     Community facilities and open spaces provide important community services to the people of Auckland. They contribute to building strong, healthy, and vibrant communities by providing spaces where Aucklanders can participate in a wide range of social, cultural, art and recreational activities. These activities improve lifestyles and a sense of belonging and pride amongst residents.

12.     Work programmes are presented to local boards for approval each year. The 2019 – 2022 Community Facilities Work Programme, detailed in the attachments, contains information on all proposed projects to be delivered by Community Facilities, including capital works projects, leasing and operational maintenance.

13.     Staff have engaged with the local board in the development of the work programme through several workshops, including:

·   1 November 2018 where the board discussed their priorities for the future work programme

·   14 March 2019 where the board reviewed the first draft work programme and provided feedback

·   9 May 2019 where staff provided any further information requested in workshop 2 and reviewed the revised draft work programme.

14.     This year’s work programme is a three-year programme to clearly demonstrate the phasing of project delivery and to enable the organisation to prepare for delivery.  The work programme is subject to a rolling review and each year the local board will be asked to approve a new three-year work programme.

Tātaritanga me ngā tohutohu

Analysis and advice

Capital works programme

15.     Investment in the capital works programme will ensure that council facilities and open spaces in Ōrākei local board remain valuable and well-maintained community assets.

16.     The overall capital works programme includes projects for which the board has discretion to allocate budget, referred to as the local programme, and projects from regional programmes. 

17.     Specific projects within the work programme may have budget allocated from two or more budget sources, including budgets from both local and regional programmes.

18.     The work programme includes both new projects and existing projects that have been continued from the previous financial year where those projects require multiple years for delivery (multi-year projects).

19.     Any projects that have budget approved in the current 2018/2019 financial year, but are unable to be delivered this year, will be deferred. Deferred budgets will be added to the work programme later.

Local Programme

20.     The local programme includes those projects that the board is funding from its discretionary capex budgets, including:

·   Renewals
The local board can allocate its renewals budget towards the renewal of any council owned asset.

·   Locally Driven Initiative (LDI)
The local board has the discretion to allocate its LDI budget to any projects that deliver a council asset or as a capital grant to a third party to deliver an asset made available for public use.

21.     In preparing recommendations for the local programme several matters have been considered, including:

·   strategic documents (e.g. local board plan)

·   service assessment input from Community Services

·   asset condition assessments

·   input from operational maintenance teams and staff working within facilities

·   budget availability

22.     The Community Facilities work programme supports the achievement of the following 2017 Ōrākei Local Board Plan priorities:

·   Our local parks and open space areas are valued and enjoyed

·   Our residents are proud of their community facilities and public places

·   People can move around our area easily and safely

·   The natural environment is valued protected and enhanced by our communities

23.     Other strategic documents of relevance have included:

·   Colin Maiden Precinct Masterplan

·   Eastern Parks Masterplan

·   Hobson Bay Action Plan

24.     These have influenced recommendations in the work programme by guiding the prioritisation of the programme and defining the scope of works to ensure the sought outcome is achieved.

25.     Some of the key projects to be accommodated in the work programme include:

·   Churchill Park – develop and enhance lookout site (former golf clubhouse site)

·   Churchill Park - develop and renew pathways

·   Crossfield Reserve – implement park improvements

·   Hobson Bay – develop walkway (Stage 2) – Shore Road Reserve to Wilsons Beach

·   Ōrākei Spine Shared Path – develop feeder links

26.     The phasing of projects over various years is recommended to meet budget requirements.  In this regard careful consideration has been given to the delivery timing of several proposed projects which will be phased in later years.

27.     Of note in the work programme is the Hobson Walkway (Stage 2) and the Ōrākei Spine Shared Path feeder links.

28.     The proposed work programme in Attachment A contains:

·   Number of projects excluding leases and contract lines over the three years: 36

·   Indicative cost for proposed projects in the 2019/2020 financial year: $6,216,000

Regional Programme

29.     The Long-term Plan 2018 - 2028 includes budgets which support the delivery of regional programmes. These budgets are allocated to specific projects within a regional programme by the Governing Body.

30.     Where budget is allocated to a project in the regional programme that falls within a local board decision making allocation (e.g. a local park), that project is included in the local board work programme. The local board then has decision making responsibility for that project, within the parameters set by the Governing Body, namely location, scope and budget.

31.     Regional budgets include:

·   Local parks and sports field development (growth)

·   Coastal renewals

·   Slips prevention and remediation.

32.     Projects in these regional programmes are identified and prioritised based on consideration of several factors.

33.     For the local parks and sports field development programme, this includes:

·   Extent to which residential growth is generating demand for the project

·   Current levels of provision

·   Available budget.

34.     For coastal renewals and slips prevention and remediation this includes:

·   Asset condition

·   Relative hazard and risk

·   Available budget.

35.     The allocation of budget to specific projects will be approved by the Environment and Community Committee in July 2019.

36.     The local board has an opportunity to provide formal feedback, through resolution to this report, for consideration by the Environment and Community Committee prior to approval of the regional programmes.

Capital Programme Delivery

Cost estimates subject to change

37.     Budget allocations within the work programme are best estimates only. Project costings are subject to change and refinement as projects progress through the design and delivery process. Greater clarity will be determined around the specific work required and the cost of delivery of that work once the details are defined.

38.     The delivery of individual projects is managed within the overall work programme budget for each local board. Where significant changes to project budgets may need to be considered, or if new projects are added to the work programme, changes may be required to the programme to accommodate final project costs as the year progresses.

Risk adjusted programme

39.     Several projects have been identified in the work programme as “risk adjusted programme (RAP)” projects.

40.     These are projects that have budget allocated in the 2020/2021 financial year (i.e. year two of the three-year programme). Staff propose to commence work in the 2019/2020 year on the delivery of these risk adjusted projects.

41.     By progressing these identified projects alongside the 2019/2020 projects in the programme, it is intended that, should projects identified for delivery in year one of the work programme be delayed for any reason, staff will be able to proceed with agreed alternative projects to ensure that the full annual budget is delivered each year.

42.     Approval is sought from the local board for staff to commence work on those projects identified in the work programme as risk adjusted programme projects in the 2019/2020 year.

Delegation for approval of changes to the work programme

43.     The delivery of the proposed work programme in an efficient and timely manner may require amendments to be made to the agreed work programme during the year. Such amendments could include:

·   changes to project scope, budgets, timing

·   addition of new projects within available budget

·   cancelling or putting approved projects on hold.

44.     Any changes to the approved work programme require approval from the local board. Approval will normally be sought through resolution at a business meeting.

45.     Local boards are also able to delegate authority to approve some or all amendments to the work programme to the chair, to another member of the local board, or to staff. Such delegation would allow changes to be made without the timeframes required to provide formal reports and would support the efficient delivery of the work programme.

46.     Should the local board choose to delegate authority to approve changes to the work programme, it is anticipated that any changes would be workshopped with the local board prior to any delegated decision being taken. Any changes made under delegation would be reported back to the local board in their quarterly report.

Leasing work programme

47.     Community leases, commonly on public parks and reserves, are a valuable way in which the council provides support to community organisations across the region. These groups provide a wide range of community activities and services aligned with recognised local priorities and are a key part of the mosaic of community activity and infrastructure in Auckland.

48.     Attachment B – Community Leases provides a detailed list of the community leases and licences that will expire or are due for renewal over the 2019/2020 financial year. Following approval of the work programme staff will proceed with review and renewal of these leases and licences as appropriate during the financial year.

49.     Two additional project lines include those leases and licences proposed to be progressed in the 2020/2021 and 2021/2022 financial years respectively.

50.     Straight forward lease renewals without variations will be processed in accordance with agreed delegations with a written memo to the local board providing the opportunity for the board to request further information or a formal report. More complex community leases will be reported to the local board at a business meeting. 

Operational maintenance work programme

51.     The regular maintenance of all council-owned built and open space assets plays an important part in:

·   increasing the long-term durability of Community Facilities assets

·   improving the safety of Community Facilities assets

·   ensuring the enjoyment of Community Facilities assets by the users.

52.     In the 2019 - 2022 Community Facilities Work Programme, there are three line items dedicated to all maintenance in the local board area:

·   Full Facilities Maintenance Contracts – these contracts include all buildings, parks and open space assets, sports fields, coastal management and storm damage response. From 1 July 2019 council is responsible for streetscapes maintenance from Auckland Transport

·   Arboriculture Maintenance Contracts – these contracts include all tree management and maintenance

·   Ecological Restoration Maintenance Contracts – these contracts include pest plant management within ecologically significant areas and animal pest management across all parks and reserves.

53.     Staff will be able to provide regular reporting on maintenance through monthly updates to the local boards and through the quarterly report. Community Facilities is also providing additional weekly updates to all elected members on contractor performance.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

54.     The 2019 - 2022 work programme has been developed in consultation with other council departments as part of the council’s integrated local board work programme approach. This approach aimed to improve the quality of advice for the local board through collaboration and understanding across departments.

55.     The council’s Parks Services and Recreation department were involved in the development of the Churchill Park lookout site and Liston Park renewals and improvements for park assets.  Service Strategy and Integration are involved in the project scope for renewal of the St Heliers Library.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

56.     The Community Facilities Work Programme has been created through a combination of local board feedback, asset condition assessments and agreed levels of service.

57.     The 2019 - 2022 Community Facilities Work Programme has been considered by the local board in a series of workshops from October 2018 to May 2019. The views expressed by local board members during the workshops have informed the recommended work programmes.

Tauākī whakaaweawe Māori

Māori impact statement

58.     The 2019 - 2022 Community Facilities Work Programme ensures that all facilities and open space assets continue to be well-maintained assets that benefit the local community, including Māori. When developing and delivering work programmes consideration is given to how the activities can contribute to Māori well-being, values, culture and traditions.

59.     Where any aspects of the proposed work programme are anticipated to have a significant impact on sites of importance to mana whenua then appropriate engagement will be undertaken.

60.     Staff are also attending monthly Parks and Recreation Mana Whenua forums to receive feedback on specific projects within the 2019 - 2022 Community Facilities Work Programme.

61.     Activities in the work programmes that are specific to Māori outcomes include:

·   Hobson Bay Walkway (Stage 2)

·   Ōrākei - Auckland Urban Forest (Ngahere) Strategy - Growing Phase

Ngā ritenga ā-pūtea

Financial implications

62.     Table 1 below summarises the relevant budgets, proposed allocation and the balance of unallocated budget available.

Local Budgets

2019/2020

2020/2021

2021/2022

Renewals - Budget

$4,415,000

$1,114,621

$2,409,075

Renewals - Proposed Allocation

$4,370,000

$1,105,000

$2,375,000

Renewals - Unallocated budget

$45,000

$9,261

$34,075

 

 

 

 

Growth and Development - Allocation

$1,094,000

$2,750,000

$1,449,000

Coastal Renewals - Allocation

$425,000

$0

$0

Slips Prevention - Allocation

$0

$0

$0

 

 

 

 

LDI Capex - Proposed Allocation

$180,000

$0

$0

 

 

 

 

LDI Opex - Proposed Allocation

$147,000

 

 

 

63.     The proposed work programme can be accommodated within the available local board budgets. Approval of the work programme does not have significant financial implications, unless projects experience a significant overspend or underspend.

64.     Regular updates on the delivery of the programme will be provided to the local board. These updates will identify progress of all projects and potential amendments to the approved programme including changes to budget allocation and timing.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

65.     Where a work programme activity cannot be completed on time, due to unforeseen circumstances, this will be signalled to the local board at the earliest opportunity.  The risk adjusted programme (RAP) will be used to progress those projects identified as ready to proceed under the RAP.

66.     If the proposed Community Facilities work programme is not approved at the business meeting, there is a risk that the proposed projects may not be delivered within the 2019/2020 financial year.

Ngā koringa ā-muri

Next steps

67.     Once approved, delivery of activities identified in the Community Facilities work programme will commence from 1 July 2019.

68.     The work programmes identify if further decisions are required for each activity. These will be brought to the local board when appropriate.

69.     Progress and updates on work programmes will be reported to the local board for each quarter of the financial year.

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Ōrākei  Local Board Community Facilities 2019 – 2022 Work Programme – Build, Maintain, Renew

35

b

Ōrākei  Local Board Community Facilities 2019 – 2022 Work Programme – Leases

45

     

Ngā kaihaina

Signatories

Author

Jacqui Thompson Fell - Work Programme Lead

Authorisers

Rod Sheridan - General Manager Community Facilities

Adam Milina - Relationship Manager - Albert-Eden & Orakei Local Boards

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019

 

 


Ōrākei Local Board

20 June 2019