I hereby give notice that an ordinary meeting of the Manurewa Local Board will be held on:
Date: Time: Meeting Room: Venue:
|
Thursday, 17 June 2021 6.00pm Manurewa
Local Board Office |
Manurewa Local Board
OPEN AGENDA
|
MEMBERSHIP
Chairperson |
Joseph Allan |
|
Deputy Chairperson |
Melissa Atama |
|
Members |
Anne Candy |
|
|
Tabetha Gorrie |
|
|
Rangi McLean |
|
|
Glenn Murphy |
|
|
Ken Penney |
|
|
Dave Pizzini |
|
(Quorum 4 members)
|
|
Rohin Patel Democracy Advisor
10 June 2021
Contact Telephone: 021 914 618 Email: rohin.patel@aucklandcouncil.govt.nz Website: www.aucklandcouncil.govt.nz
|
Manurewa Local Board 17 June 2021 |
|
1 Welcome 5
2 Apologies 5
3 Declaration of Interest 5
4 Confirmation of Minutes 5
5 Leave of Absence 5
6 Acknowledgements 5
7 Petitions 5
8 Deputations 5
8.1 Deputation - Auckland Southern District Chinese Association 6
9 Public Forum 6
10 Extraordinary Business 6
11 Manurewa Youth Council Quarter Two Update 9
12 Governing Body Members' Update 21
13 Members' Update 23
14 Chairperson's Update 25
15 Auckland Transport Monthly Report – June 2021 27
16 Road Name Approval for Extension of Laurelia Place, Manukau Central 31
17 Proposal to grant a new community lease for Senior Citizens Service Club of Manurewa Incorporated at Tadmor Park, 238R Great South Road, Manurewa 37
18 New community lease for Homai Bowling Club Incorporated at War Memorial Park, 16R Gibbs Road, Manurewa 47
19 New community lease for Counties Manukau Kindergarten Association Incorporated at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa 57
20 Nathan Homestead Café Licence to Occupy Agreement 71
21 Manurewa Local Grant Round Four 2020/2021 and Multiboard Grant Round Two 2020/2021 grant allocations 79
22 Adoption of the Manurewa Local Board Agreement 2021/2022 93
23 Approval of the 2021/2022 Manurewa Local Board Customer and Community Services work programme 105
24 Approval of the 2021/2022 Manurewa Local Board Infrastructure and Environmental Services Work Programme 161
25 Approval of the Manurewa Local Board Auckland Unlimited work programme 2021/2022 177
26 Approval of the Manurewa Local Board Auckland Emergency Management work programme 2021/2022 185
27 Feedback on Equity of Service Levels and Funding Proposals - Draft Report 191
28 Economic Development Action Plan: Draft for feedback 201
29 Delegation of feedback to be provided to the Establishment Unit Board of the City Centre to Māngere light rail project 227
30 Urgent Decision Memo - Light Rail Establishment Unit Board delegation to Chairs' Forum 231
31 Manurewa Local Board input approved and submitted for inclusion in Auckland Council submissions - May 2021 237
32 Eke Panuku Development Auckland - Manurewa Local Board Six-Monthly Report to 31 March 2021 243
33 Auckland Unlimited Quarter Three Performance Report 251
34 For Information: Reports referred to the Manurewa Local Board 267
35 Manurewa Local Board Governance Forward Work Calendar - June 2021 289
36 Manurewa Local Board Workshop Records 293
37 Consideration of Extraordinary Items
A board member will lead the meeting in prayer.
At the close of the agenda no apologies had been received.
Members are reminded of the need to be vigilant to stand aside from decision making when a conflict arises between their role as a member and any private or other external interest they might have.
That the Manurewa Local Board: a) confirm the ordinary minutes of its meeting, held on Thursday, 20 May 2021, as true and correct.
|
At the close of the agenda no requests for leave of absence had been received.
At the close of the agenda no requests for acknowledgements had been received.
At the close of the agenda no requests to present petitions had been received.
Standing Order 7.7 provides for deputations. Those applying for deputations are required to give seven working days notice of subject matter and applications are approved by the Chairperson of the Manurewa Local Board. This means that details relating to deputations can be included in the published agenda. Total speaking time per deputation is ten minutes or as resolved by the meeting.
A period of time (approximately 30 minutes) is set aside for members of the public to address the meeting on matters within its delegated authority. A maximum of 3 minutes per item is allowed, following which there may be questions from members.
At the close of the agenda no requests for public forum had been received.
Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (as amended) states:
“An item that is not on the agenda for a meeting may be dealt with at that meeting if-
(a) The local authority by resolution so decides; and
(b) The presiding member explains at the meeting, at a time when it is open to the public,-
(i) The reason why the item is not on the agenda; and
(ii) The reason why the discussion of the item cannot be delayed until a subsequent meeting.”
Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (as amended) states:
“Where an item is not on the agenda for a meeting,-
(a) That item may be discussed at that meeting if-
(i) That item is a minor matter relating to the general business of the local authority; and
(ii) the presiding member explains at the beginning of the meeting, at a time when it is open to the public, that the item will be discussed at the meeting; but
(b) no resolution, decision or recommendation may be made in respect of that item except to refer that item to a subsequent meeting of the local authority for further discussion.”
Manurewa Local Board 17 June 2021 |
|
Manurewa Youth Council Quarter Two Update
File No.: CP2021/07346
Te take mō te pūrongo
Purpose of the report
1. To provide the opportunity for the Manurewa Youth Council to update the Manurewa Local Board on matters they have been involved in.
Whakarāpopototanga matua
Executive summary
2. The Manurewa Youth Council will provide a written update on their actions and achievements from the past three months.
Recommendation/s That the Manurewa Local Board: a) receive the Manurewa Youth Council quarterly update.
|
Attachments
No. |
Title |
Page |
a⇩ |
Manurewa Youth Council Quarter Two Update |
11 |
b⇩ |
Manurewa Youth Council Financial Report |
15 |
Ngā kaihaina
Signatories
Author |
Rohin Patel - Democracy Advisor |
Authoriser |
Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Governing Body Members' Update
File No.: CP2021/07421
Te take mō te pūrongo
Purpose of the report
1. To provide an opportunity for the ward area Governing Body members to update the local board on Governing Body issues they have been involved with since the previous local board meeting.
Whakarāpopototanga matua
Executive summary
2. Standing Orders 5.1.1 and 5.1.2 provides for Governing Body members to update their local board counterparts on regional matters of interest to the local board.
Recommendation/s That the Manurewa Local Board: a) receive verbal updates from Councillors Angela Dalton and Daniel Newman.
|
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Author |
Rohin Patel - Democracy Advisor |
Authoriser |
Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
File No.: CP2021/07422
Te take mō te pūrongo
Purpose of the report
1. To provide an opportunity for members to update the Manurewa Local Board on matters they have been involved in over the last month.
Whakarāpopototanga matua
Executive summary
2. An opportunity for members of the Manurewa Local Board to give a written or verbal update on their activities for the month.
Recommendation/s That the Manurewa Local Board: a) receive the update from members.
|
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Author |
Rohin Patel - Democracy Advisor |
Authoriser |
Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
File No.: CP2021/07423
Te take mō te pūrongo
Purpose of the report
1. To provide an opportunity for the Manurewa Local Board Chairperson to update the local board on issues he has been involved in.
Whakarāpopototanga matua
Executive summary
2. An opportunity for the Manurewa Local Board Chairperson to update the local board on his activities over the last month.
Recommendation/s That the Manurewa Local Board: a) receive the verbal report from the Manurewa Local Board Chairperson.
|
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Author |
Rohin Patel - Democracy Advisor |
Authoriser |
Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
Auckland Transport Monthly Report – June 2021
File No.: CP2021/07386
Te take mō te pūrongo
Purpose of the report
1. To update the Manurewa Local Board about transport related matters.
Whakarāpopototanga matua
Executive summary
2. No decision is required this month. This report contains information about the following:
· Auckland Transport (AT) local and regional projects and activities
· Te Mahia Station
· AT southern hub structure and reporting.
Recommendation/s
That the Manurewa Local Board:
a) receive the Auckland Transport June 2021 report.
Horopaki
Context
3. AT is responsible for all of Auckland’s transport services, excluding state highways. AT reports on a regular basis to local boards, as set out in the Local Board Engagement Plan. This reporting commitment acknowledges the important engagement role local boards play within and on behalf of their local communities.
Tātaritanga me ngā tohutohu
Analysis and advice
4. This section of the report contains information about relevant projects, issues and initiatives. It provides summaries of the detailed advice and analysis provided to the local board during workshops and briefings.
AT Southern Hub
5. In December 2020 AT reviewed its communications and engagement team. As a consequence of this and as part of the response to recommendations in the CCO review four sub-regional hubs were established. The southern hub covers Manurewa, Papakura, Franklin, Howick, Otara-Papatoetoe and Mangere-Otahuhu.
6. Staffing for the Southern hub comprises:
· Head of Community Engagement (South)
· 2 x Elected Members Relationship Managers
· 2 x Senior Communications Partners
· Senior Engagement Partner
· Community and BID Engagement partner.
7. As part of the review AT and Local Board Services are reviewing the way AT (and other CCOs) report. As this process is taking some time, reporting in the previous format has resumed. Though the reporting will be every two months in the interim.
Te Mahia Station
8. Following a site visit by two of AT’s Executive Leadership Team, Wally Thomas and Mark Lambert, they undertook to appoint a project manager to progress the development of 288 Great South Road. This will improve the safety and access of the station from Great South Road.
9. There will be a briefing and workshop with the board on 10 June to update the board.
10. Related to this, the AT Connected Communities team are expediting their investigations of Great South Road near the site. This will be workshopped in the next two months.
School Speed Trial
11. Four Auckland primary schools will soon become a safer destination for children and parents with new safer 30km/h speeds. Auckland schools Grey Lynn Primary, Glenfield Primary, Birkdale Primary and Summerland Primary school are part of Auckland Transport’s Safe School Speeds programme.
12. The project – which is part of the wider Innovating Streets for People Programme – involves schools working with Auckland Transport to introduce new speed calming measures such as kerb extensions, speed humps, and new painted surfaces to keep children safe.
AT $20 Fare Cap
13. On 23 May AT will be introduce a $20 fare cap on public transport. Customers are be able to travel all day on trains, buses and ferries tagging on and off with their AT HOP card, and never pay more than $20. The only exclusions are mid and outer-harbour ferries, Waiheke ferry and Skybus services. Bayswater, Birkenhead, Northcote Point and Devonport Inner Harbour ferries are included.
14. With the fare cap it’s now not necessary to pay in advance for a whole day of travel. The system is automatic, so as long as customers tag on and off with their AT HOP card, they will not be charged more than $20 no matter how many train, bus and inner harbour ferries are taken on the same day (to end of service). Fare Daily Cap testing has been undertaken since 11 April and completed on 23 April after two full testing cycles.
15. All AT HOP customers were informed via electronic marketing.
Tauākī whakaaweawe āhuarangi
Climate impact statement
16. AT engages closely with Council on developing strategy, actions and measures to support the outcomes sought by the Auckland Plan 2050, the Auckland Climate Action Plan and Council’s priorities.
17. AT’s core role is in providing attractive alternatives to private vehicle travel, reducing the carbon footprint of its own operations and, to the extent feasible, that of the contracted public transport network.
18. An update on AT’s role in climate change will be reported to the July meeting.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
19. The impact of information (or decisions) in this report are confined to AT and do not impact on other parts of the council group.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
20. The purpose of this report is to inform the local board.
Tauākī whakaaweawe Māori
Māori impact statement
21. There are no impacts specific to Māori for this reporting period. AT is committed to meeting its responsibilities under Te Tiriti o Waitangi-the Treaty of Waitangi-and its broader legal obligations in being more responsible or effective to Māori.
22. Our Maori Responsiveness Plan outlines the commitment to with 19 mana whenua tribes in delivering effective and well-designed transport policy and solutions for Auckland. We also recognise mataawaka and their representative bodies and our desire to foster a relationship with them.
23. This plan in full is available on the AT’s Website - https://at.govt.nz/about-us/transport-plans-strategies/maori-responsiveness-plan/#about
Ngā ritenga ā-pūtea
Financial implications
24. The proposed decision of receiving the report has no financial implications.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
25. Risks are managed as part of each AT project.
Ngā koringa ā-muri
Next steps
26. AT will provide an information report to the July meeting and will include an update of projects funded through the recent Regional Land Transport Plan review.
27. Upcoming workshops include:
· Te Mahia Station
· Social Procurement
· Local Board Transport Capital Fund plan
· Local Board CCO Engagement plan
· Auckland Transport Connected Communities
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Author |
Bruce Thomas – Elected Member Relationship Manager |
Authorisers |
Paul Paton – Communications Manager Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
Road Name Approval for Extension of Laurelia Place, Manukau Central
File No.: CP2021/07590
Te take mō te pūrongo
Purpose of the report
1. To seek formal approval from the Manurewa Local Board to name a new section of public road as ‘Laurelia Place’, this being an extension of the existing public road ‘Laurelia Place’ in Manukau Central.
Whakarāpopototanga matua
Executive summary
2. The Auckland Council Road Naming Guidelines set out the requirements and criteria of the Council for proposed road names. These requirements and criteria have been applied in this situation to ensure consistency of road naming across the Auckland Region.
3. Formal approval from the local board is required to enable the use of the name Laurelia Place from the existing road into the new section of road.
4. As this report seeks to use the existing road name, no consultation was required.
Recommendation/s
That the Manurewa Local Board:
a) approves the name Laurelia Place for a new section of public road that connects to the existing section of Laurelia Place, providing access to the new subdivision at the end of this road, in accordance with section 319(1)(j) of the Local Government Act 1974 (resource consent references BUN60081464, LUC60290512 and SUB60299131).
Horopaki
Context
5. Resource consent BUN60081464 (subdivision reference number SUB60299131) was issued in June 2017 for Stage 2 of the overall masterplan and two qualifying developments providing a total of 382 new dwellings and associated subdivision, including the extension of the existing public road named Laurelia Place in order to provide additional access to the new subdivision.
6. In accordance with section 319(1)(j) of the Local Government Act 1974, in order to use the name ‘Laurelia Place’ for the newly created section of public road, formal approval from the local board is required.
7. Site and location plans of the development can be found in Attachment A.
Tātaritanga me ngā tohutohu
Analysis and advice
8. There is a new subdivision at the end of the existing public road named Laurelia Place in Manukau. This subdivision and associated development is currently underway and a new section of public road has been extended into the development to provide additional access to hundreds of new dwellings. This connects seamlessly with the existing section of Laurelia Place. The new extension of Laurelia Place will connect to approved Mahalo Avenue located in the new development. Access for the new development has also been provided from existing Pacific Events Centre Drive.
9. In accordance with the National Addressing Standards for road naming (the AS/NZS 4819-2011 standard), each continuous section of navigable road can have only one road name, and so, as the new section of public road will be a continuation of existing Laurelia Place, there are no other road name options available.
10. As this report seeks to extend an existing road name, no consultation was required.
Tauākī whakaaweawe āhuarangi
Climate impact statement
11. The naming of roads has no effect on climate change. Relevant environmental issues have been considered under the provisions of the Resource Management Act 1991 and the associated approved resource consent for the development.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
12. The decision sought for this report has no identified impacts on other parts of the Council group. The views of council controlled organisations were not required for the preparation of the report’s advice.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
13. The decision sought for this report does not trigger any significant policy and is not considered to have any immediate local impact beyond those outlined in this report.
Tauākī whakaaweawe Māori
Māori impact statement
14. As this report seeks to extend an existing road name, no consultation was required.
Ngā ritenga ā-pūtea
Financial implications
15. The road naming process does not raise any financial implications for the Council.
16. The applicant has responsibility for ensuring that appropriate signage will be installed as necessary, once approval is obtained for the new road name.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
17. There are no significant risks to Council as road naming is a routine part of the subdivision development process, with consultation being a key component of the process.
Ngā koringa ā-muri
Next steps
18. Approved road names are notified to LINZ which records them on its New Zealand wide land information database. LINZ provides all updated information to other users, including emergency services.
19. It has been recommended to the Applicant to install additional road signage directing traffic for Mahalo Avenue from Laurelia Place. The new extension of Laurelia Place will connect to approved Mahalo Avenue in the new development.
Attachments
No. |
Title |
Page |
a⇩ |
Site & Location Plans |
35 |
Ngā kaihaina
Signatories
Author |
Andrea Muhme - Planner |
Authorisers |
Trevor Cullen - Team Leader Subdivision Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Proposal to grant a new community lease for Senior Citizens Service Club of Manurewa Incorporated at Tadmor Park, 238R Great South Road, Manurewa
File No.: CP2021/06866
Te take mō te pūrongo
Purpose of the report
1. To grant a new community lease for Senior Citizens Service Club of Manurewa Incorporated at Tadmor Park, 238R Great South Road, Manurewa.
Whakarāpopototanga matua
Executive summary
2. Senior Citizens Service Club of Manurewa Incorporated holds an existing community lease for the council-owned buildings known as Tadmor House and Hall at 238R Great South Road, Manurewa.
3. The lease commenced on 17 August 1997 and reached final expiry on 16 August 2017. The lease is holding over on a month-to-month basis until terminated or a new lease is granted.
4. At the expiry of a lease for a council-owned building, it is good practice to review alternative uses for the premises. An expression of interest process can be undertaken to gauge community interest and alternative uses. If the activity of the incumbent group is required in the area, the Manurewa Local Board has the discretion to forgo the expression of interest process.
5. Staff received direction from Manurewa Local Board during its workshop on 2 July 2020 to forgo the expressions of interest process and engage with the senior citizens who submitted an application.
6. The senior citizens’ aim is to foster and promote a club for the senior citizens of Manurewa and its surrounding communities for the purpose of cultural, useful activities and social interaction for its members.
7. The group is dedicated to the growth, preservation and support of activities pertaining to older people in the community. The senior citizens have become a well-established community organisation, providing activities for older people in the local community for 60 years.
8. After assessing the senior citizens’ new lease application, staff are satisfied that the requirements under Auckland Council’s Community Occupancy Guidelines 2012 have been met.
9. Mana whenua engagement has been undertaken and public notification will follow subject to Manurewa Local Board’s approval of the recommendations below.
10. This report recommends that a new community lease be granted for Senior Citizens Service Club of Manurewa Incorporated, in accordance with the terms and conditions under Auckland Council’s Community Occupancy Guidelines 2012 and the provisions of the Local Government Act 2002.
Recommendation/s
That the Manurewa Local Board:
a) note public notification of Auckland Council’s intention to grant a new community lease for Senior Citizens Service Club of Manurewa Incorporated at Tadmor Park, 238R Great South Road, Manurewa.
b) delegate to the Manurewa Local Board Chairperson the authority to appoint a hearings panel to consider any objections or submissions received, following the public notification, and for the panel to reach a decision.
c) grant, subject to any objections being resolved, under section 138 of the Local Government Act 2002, a new community lease for Senior Citizens Service Club of Manurewa Incorporated for the council-owned buildings comprising 586 square metres (more or less) located at Tadmor Park, 238R Great South Road, Manurewa (outlined in red on Attachment A) on the land described as Lot 3 Deposited Plan 49948 contained in Record of Title NA2081/23 subject to the following terms:
i) term - two years commencing 17 June 2021, with one (1) two-year right of renewal commencing 17 June 2023, effecting final expiry on 16 June 2025
ii) rent - $1.00 plus GST per annum if demanded
iii) maintenance fee - $1000.00 plus GST per annum
iv) when the premises are not utilised by Senior Citizens Service Club of Manurewa Incorporated for its primary activities, it will be made available to local community groups for hireage at a reasonable community rate
v) all other terms and conditions to be in accordance with Auckland Council’s Community Occupancy Guidelines 2012 and the provisions of the Local Government Act 2002.
d) approve the Senior Citizens Service Club of Manurewa Incorporated’s Community Outcomes Plan (Attachment B) for inclusion as the third schedule of the lease agreement.
Horopaki
Context
11. This report considers the new community lease for Senior Citizens Service Club of Manurewa Incorporated for the council-owned buildings located at Tadmor Park, 238R Great South Road, Manurewa.
12. The Manurewa Local Board is the allocated authority relating to local, recreation, sport and community facilities, including community leasing matters.
Land, Buildings and Lease
13. The underlying land for the senior citizens occupation at 238R Great South Road, Manurewa is legally described as Lot 3 Deposited Plan 49948 contained in Record of Title NA2081/23, held in fee simple by Auckland Council and subject to the Local Government Act 2002 (the Act). Under section 138 of the Act, all leases longer than six months require public notification and submitters will have one month to make a submission or objection.
14. If any submission or objection to the proposed lease are received, a hearings panel of the local board will be convened to consider the matter and reach a decision.
15. The buildings known as Tadmor House and Hall are owned by council. The lessee will be responsible for the interior maintenance (including plumbing stoppages, interior graffiti and broken glass) and utilities (power and water). Structural maintenance and renovations are undertaken by council.
16. As a single lessee with exclusive use of a council-owned building, an annual subsidised maintenance fee of $1000.00 (plus GST) is charged. The fee amount is determined by the extent of the leased area and in line with Auckland Council’s Community Occupancy Guideline 2012. Furthermore, this fee covers building insurance and compliance costs associated with Building Warrant of Fitness, Health and Safety at Work Act 2015 and maintenance.
17. An asset assessment undertaken by staff in July 2020 indicated that the condition of the buildings is satisfactory given its age, design and usage.
18. The area proposed to be leased to the senior citizens consists of approximately 586 square metres (more or less) and is outlined in red on Attachment A.
The Senior Citizens
19. The senior citizens was established in 1961 and registered as an incorporated society on 31 August 1964. The group arranges social activities for its members such as trips and tours to different locations, movies, pamper days, functions and events held at the premises.
20. In addition, the premises are used for activities such as meetings, shared meals, entertainment, cultural and art groups, and morning and afternoon teas for its members and other elderly residents in the local community.
21. At present, the group are collaborating with Haumaru Housing, CLM Community Sports Counties Manukau, Ultimate Care Manurewa and Te Oranga Kaumatua Kuia Disability Support Services Trust to strengthen its programmes and activities.
22. The senior citizens are working closely with Haumaru Housing and its five villages for older people within the Manurewa local board area to draw new members and activate the premises. Moreover, the group is in the process of undertaking an initiative with Ultimate Care Manurewa and its dementia residents. The group will initiate activities to stimulate the minds of the residents such as puzzles, games, art and karaoke to name a few. These activities will also be undertaken at the premises.
23. The group assist the community by allowing local community groups to hire the premises at a reasonable community rate.
24. The senior citizens are the first occupants of Tadmor House and Hall and will celebrate its 60th diamond jubilee in October 2021. They continue to be involved in the community and aspire to create an engaging and welcoming environment, so that older people do not feel lonely and isolated and feel that they belong and are part of a wider community.
25. Senior Citizens Service Club of Manurewa Incorporated have submitted a comprehensive application for a new community lease.
Tātaritanga me ngā tohutohu
Analysis and advice
26. The senior citizens’ new lease application was assessed against the criteria contained in Auckland Council’s Community Occupancy Guidelines 2012 and the priorities set by the Manurewa Local Board Plan 2020.
27. When a lease reaches final expiry for a council-owned building an expression of interest process can be undertaken to gauge interest and best use. If the activity of the incumbent group is required in the area and continues to provide services to the community, the Manurewa Local Board has the discretion to forgo the expression of interest process and grant a new community lease. The local board has exercised this discretion.
28. The term recommended for the lease is for a period of two years with one (1) two-year right of renewal, four-year total term. The shorter-term community lease is to allow the senior citizens time to implement initiatives and strategies to increase delivery of services while maintaining a regular review.
29. The local board has discretion to vary the term of the lease if it wishes. However, the guidelines suggest that where the term is varied, it aligns to one of the recommended terms within the Community Occupancy Guidelines 2012.
30. Staff have determined that Senior Citizens Service Club of Manurewa Incorporated meets the requirements under the guidelines to qualify for a new community lease as evidenced below.
31. The senior citizens:
· are registered as a legal entity with a not-for-profit status
· have complied with the terms of the existing lease
· caters to a well-defined group in the local community and its services are utilised
· are financially viable and sustains its activities predominantly through facility hireage at a reasonable community rate, grants and membership subscriptions
· are managed appropriately, as shown by its longevity.
32. The buildings are owned by council and the senior citizens are primarily responsible for the upkeep of the interior of the premises (except fair wear and tear). In contrast, council is responsible for mainly external and structural maintenance of the premises, also for the surrounding grounds to be maintained. A site visit undertaken indicated that the leased area presents well and meets the needs of its users.
33. The senior citizens have a scheduled maintenance programme in place to address routine cleaning and general maintenance for the upkeep of the interior of the buildings.
34. A community outcomes plan has been negotiated with the senior citizens that identifies the benefits the group will provide to the community (Attachment B). This will be attached as a schedule to the lease agreement.
Tauākī whakaaweawe āhuarangi
Climate impact statement
35. There is no impact on greenhouse gas emissions as the proposal does not introduce any new source of emissions.
36. Climate change impacts will need to be considered in any future planning for the area. While the leased area does not sit directly within a flood water (river or surface flooding) zone as a result of a 1‑in-100-year rainstorm event, neighbouring areas are within the zones (as shown below):
Senior Citizens Service Club of Manurewa circled in red
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
37. Staff have obtained support from colleagues in Area Operations and Land Advisory Services (Community Facilities), Community Empowerment (Connected Communities) and Parks Services (Parks, Sports and Recreation). No concerns were raised regarding the new lease for Senior Citizens Service Club of Manurewa Incorporated.
38. The proposed new lease has no identified impact on other parts of the council group. The views of council-controlled organisations were not required for the preparation of this report’s advice.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
39. The assessment of the application was workshopped with the Manurewa Local Board portfolio leads on 13 February and 2 July 2020. The portfolio leads provided informal support regarding the proposed shorter-term new community lease for Senior Citizens Service Club of Manurewa Incorporated.
40. In addition, the assessment of the application was workshopped with the entire Manurewa Local Board on 29 April 2021. The local board requested for staff to arrange a meeting for the senior citizens to present to the board and scheduled on 20 May 2021. The local board will provide its final decision regarding the proposed shorter-term new community lease for the senior citizens once the report and recommendations from staff is tabled at its business meeting.
41. The proposed lease is an approved item on the Community Facilities Work Programme for 2020/2021 (item 2092) and adopted by the local board under resolution number MR/2020/110.
42. The recommendations in this report fall within the local board’s allocated authority to grant leases within local community facilities in line with the Community Occupancy Guidelines 2012.
43. The recommendations within this report predominantly support the Manurewa Local Board Plan 2020 outcomes of:
· Our communities are inclusive, vibrant, healthy and connected (Outcome 1)
· We are proud of our strong Māori identity and thriving Māori community (Outcome 2)
· Our people enjoy a choice of quality community spaces and use them often (Outcome 3)
44. The proposed lease will benefit the local community in enabling initiatives that promote the development, preservation and support for older people by creating environments that support resilience and connectivity.
Tauākī whakaaweawe Māori
Māori impact statement
45. Auckland Council is committed to meeting its responsibilities under Te Tiriti o Waitangi which are articulated in council’s key strategic planning documents the Auckland Plan, the 10-year budget (long-term plan), the Auckland Unitary Plan and local board plans.
46. An aim of community leasing is to increase targeted support for Māori community development. The proposal seeks to improve access to facilities for all Aucklanders, including Māori living in the Manurewa Local Board area.
47. The senior citizens encourage participation of Māori through local programmes and this forms part of their community outcomes plan commitments.
49. Mana whenua engagement was undertaken on 15 July 2020 and involved a formal written correspondence detailing information regarding the proposed new lease and forwarded to mana whenua representatives allowing 20 working days to respond. No objections to the proposal were received.
50. Mana whenua will also have an opportunity to provide feedback regarding the proposed lease during the public notification process.
Ngā ritenga ā-pūtea
Financial implications
51. All costs relating to the advertising of the intention to lease and preparation of the lease agreement are borne by Community Facilities.
52. Staff have obtained support from Financial, Strategy and Planning. No concerns were raised regarding the new lease for Senior Citizens Service Club of Manurewa Incorporated.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
53. Should the Manurewa Local Board resolve not to grant a new community lease for Senior Citizens Service Club of Manurewa Incorporated, it will inhibit the senior citizens ability to undertake its core activities in providing services for older people which will have a negative impact on the local board outcomes.
54. As there is no significant departure from the current land use or change in activities there are no identified risks in granting the lease.
Ngā koringa ā-muri
Next steps
55. Subject to Manurewa Local Board’s approval, public notification will be undertaken. On completion of the public notification, and subject to the resolution of any objections, staff will engage with Senior Citizens Service Club of Manurewa Incorporated to finalise the lease agreement.
Attachments
No. |
Title |
Page |
a⇩ |
Site Plan |
43 |
b⇩ |
Community Outcomes Plan |
45 |
Ngā kaihaina
Signatories
Author |
Tai Stirling - Community Lease Advisor |
Authorisers |
Taryn Crewe - General Manager Community Facilities Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
New community lease for Homai Bowling Club Incorporated at War Memorial Park, 16R Gibbs Road, Manurewa
File No.: CP2021/05590
Te take mō te pūrongo
Purpose of the report
1. To grant a new community lease for Homai Bowling Club Incorporated at War Memorial Park, 16R Gibbs Road, Manurewa.
Whakarāpopototanga matua
Executive summary
2. Homai Bowling Club Incorporated holds a current community lease for the group-owned assets and adjoining bowling greens located at War Memorial Park, 16R Gibbs Road, Manurewa.
3. The lease commenced on 1 May 2010 and reached final expiry on 30 April 2020. The lease is holding over on a month-by-month basis until terminated or a new lease is granted.
4. The club’s objective is to provide a facility that promotes the sport of lawn bowling and other sport pastimes, for competitive and social lawn bowls for its members and the public.
5. The group is dedicated to the growth of lawn bowling and has become a well-established community organisation, providing sport and recreation to the local community for 59 years.
6. After assessing the club’s new lease application, staff are satisfied that the requirements under Auckland Council’s Community Occupancy Guidelines 2012 have been met.
7. Mana whenua engagement has been undertaken and public notification will follow, subject to Manurewa Local Board’s approval of the recommendations below.
8. This report recommends that a new community lease be granted for Homai Bowling Club Incorporated, in accordance with the terms and conditions under Auckland Council’s Community Occupancy Guidelines 2012 and the provisions of the Reserves Act 1977.
Recommendation/s
That the Manurewa Local Board:
a) note public notification of Auckland Council’s intention to grant a new community lease for Homai Bowling Club Incorporated at War Memorial Park, 16R Gibbs Road, Manurewa.
b) delegate to the Manurewa Local Board Chairperson the authority to appoint a hearings panel to consider any objections or submissions received, following the public notification, and for the panel to reach a decision.
c) grant, subject to any objections being resolved, under Section 54(1)(b) of the Reserves Act 1977, a new community lease to Homai Bowling Club Incorporated for the group-owned assets and the adjoining bowling greens comprising 5,232 square metres (more or less) located at War Memorial Park, 16R Gibbs Road, Manurewa (outlined in red on Attachment A) on the land described as Lot 1 Deposited Plan 40551 contained in Record of Title NA1077/278 subject to the following terms:
i) term - five years commencing 17 June 2021, with one (1) five-year right of renewal commencing 17 June 2026, reaching final expiry on 16 June 2031
ii) rent - $1.00 (plus GST) per annum if demanded
iii) all other terms and conditions to be in accordance with Auckland Council’s Community Occupancy Guidelines 2012 and the provisions of the Reserves Act 1977.
d) approve the Homai Bowling Club Incorporated’s Community Outcomes Plan (Attachment B) for inclusion as the Third Schedule of the lease agreement.
Horopaki
Context
9. This report considers the new community lease for Homai Bowling Club Incorporated for its assets and the adjoining bowling greens located at War Memorial Park, 16R Gibbs Road, Manurewa.
10. The Manurewa Local Board is the allocated authority relating to local recreation, sport and community facilities, including community leasing matters.
Land, Assets and Lease
11. The club holds a current community lease over its assets and adjoining bowling greens at War Memorial Park, Manurewa. The underlying land is legally described as Lot 1 Deposited Plan 40551 contained in Record of Title NA1077/278, held in fee simple by Auckland Council as a classified recreation reserve, subject to the Reserves Act 1977.
12. The club’s activity is contemplated in the non-operative Manukau Sports Parks Management Plan 2007 relating to the park.
13. The club owns the assets on-site and is responsible for all maintenance of the leased area.
14. The area proposed to be leased to the club consists of approximately 5,232 square metres (more or less) and is outlined in red on Attachment A.
The club
15. The club was established in 1962 and registered as an incorporated society on 11 January 2000. The group is affiliated with both Bowls Counties Manukau and Bowls New Zealand with the majority of its members over 50 years of age.
16. The group has two bowling greens and dedicated members showing their skills on the green at club, regional and national events. Members have been successful winning their respective disciplines at regional events and selected to represent Counties Manukau at the national intercentre tournament.
17. During the year, the club regularly host other clubs in mid-week tournaments, and social events in the weekends that are specifically designed to encourage new bowlers to learn the fundamentals of lawn bowls. In addition, the group host a six-week business-house tournament to encourage businesses to enter teams for team building and potentially draw new members.
18. The group collaborates with Manurewa High School where students use the bowling club premises and equipment as part of their sport and recreation programme. Students can achieve and gain the required credits in their year level for National Certificate of Educational Achievement (NCEA) Physical Education by undertaking lawn bowls.
19. The club provides an initiative where the excess vegetables grown in the gardens within its leased area are donated to the local pātaka kai (food storehouse) for the community.
20. The group will celebrate its 60th Diamond Anniversary in 2022, continues to be involved in the community and aspires to create an engaging and welcoming environment that encourages participation, enjoyment and personal development for its members.
21. The club supports the notion of making its facility available for hire to help and support initiatives and activities within the local community, sport clubs and community organisations.
Tātaritanga me ngā tohutohu
Analysis and advice
22. The club’s lease application was assessed against the criteria contained in Auckland Council’s Community Occupancy Guidelines 2012 and the priorities set by the Manurewa Local Board Plan 2020.
23. Under the guidelines, groups that own their own buildings have an automatic right to re‑apply for a new lease at the end of their occupancy term, a right which the club is exercising.
24. It is recommended that a new lease be granted to Homai Bowling Club Incorporated for a term of five years, with one right of renewal for a further term of five years, 10-year total term in accordance with the guidelines, as opposed to the standard 20-year total term for group-owned buildings. The shorter-term community lease is to allow the club time to implement initiatives and strategies to increase delivery of services while maintaining a regular review.
25. The local board has discretion to vary the term of the lease if it wishes. However, the guidelines suggest that where the term is varied, it aligns to one of the recommended terms within the Community Occupancy Guidelines 2012.
26. Staff have determined that the club meet the requirements under the guidelines to qualify for a new community lease as shown beneath.
27. The club:
· is registered as a legal entity with a not-for-profit status
· has complied with the terms of the current lease
· caters to a well-defined group in the local community and its services are utilised
· has provided the latest copies of its financial statements and sustains its activities through membership subscriptions, grants, sponsorship, tournament entries and building hireage
· is managed appropriately as shown by its longevity.
28. The assets are owned by the club, which is also responsible for all maintenance within the leased area. A site visit undertaken indicates that the premises is in adequate condition and meets the needs of the club’s users.
29. The club has a maintenance plan to address general maintenance and renewals of its assets as the need arises and budget allows.
30. A community outcomes plan has been negotiated with the club that identifies the benefits the group will provide to the community. This is provided in Attachment B and will be attached as a schedule to the lease agreement.
Public Notification
31. Public notification is required under section 119 of the Reserves Act (the Act) as the Manukau Sports Parks Management Plan 2007 relating to the park is non-operative. Submitters will have one month to make a submission or objection pursuant to section 120 of the Act.
32. If any submission or objection to the proposed lease are received from the public notification process, a hearings panel of the local board will be convened to consider the matter and reach a decision.
Tauākī whakaaweawe āhuarangi
Climate impact statement
33. There is no impact on greenhouse gas emissions as the proposal does not introduce any new sources of emissions.
34. Climate change impacts will need to be considered in any future planning for the area. While the leased area does not sit directly within a flood water (river or surface flooding) zone as a result of a 1‑in-100-year rainstorm event, neighbouring areas are within the zones (as shown below).
Homai Bowling Club circled in red
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
35. Staff have obtained support from colleagues in Parks Services (Parks, Sports and Recreation), Area Operations and Project Specialisation Office (Community Facilities) and Community Empowerment (Connected Communities). No concerns were raised regarding the new lease for Homai Bowling Club Incorporated.
36. However, staff received feedback from Active Recreation (Parks, Sports and Recreation) concerning programming objectives to support participation and/or membership growth. Staff have included measures in the club’s community outcomes plan to address the above and to be reviewed annually.
37. In addition, staff advised for the club to reach out to its regional and national body, CLM Community Sport Counties Manukau and council staff for support to implement initiatives and strategies to increase delivery of services. Active Recreation support a shorter-term community lease for the club.
38. The proposed new lease has no identified impact on other parts of the council group. The views of council-controlled organisations were not required for the preparation of this report’s advice.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
39. The assessment of the application was noted on the Community Facilities local board combined monthly reports for December 2020 and January 2021 and forwarded to the local board in February 2021. In addition, the application was workshopped with the local board on 27 May 2021. The board raised queries regarding programming objectives to support participation and/or membership growth. Staff have provided advise to the club and discussions have been initiated for collaboration between the club, community organisations such as CLM Community Sports Counties Manukau and council staff with regards to capacity building.
40. Furthermore, staff informed the board the measures in the club’s community outcomes plan will be monitored on an annual basis to ensure the club meets its contractual lease obligations.
41. The proposed lease is an approved item on the Community Facilities Work Programme for 2020/2021 (item 369) and adopted by the local board under resolution number MR/2020/110.
42. The recommendations in this report fall within the local board’s allocated authority to grant community leases in line with the Community Occupancy Guidelines 2012.
43. The recommendations within this report predominantly support the Manurewa Local Board Plan 2020 outcomes of:
· Our communities are inclusive, vibrant, healthy- and connected (Outcome 1)
· Our people enjoy a choice of quality community spaces and use them often (Outcome 3).
44. The proposed lease will benefit the local community in enabling initiatives that promote the preservation and encourage the development and expansion of the sport of lawn bowling.
Tauākī whakaaweawe Māori
Māori impact statement
45. Auckland Council is committed to meeting its responsibilities under Te Tiriti o Waitangi which are articulated in council’s key strategic planning documents the Auckland Plan, the 10-year budget (Long-term plan), the Auckland Unitary Plan and local board plans.
46. An aim of community leasing is to increase targeted support for Māori community development. The proposal seeks to improve access to facilities for all Aucklanders, including Māori living in the Manurewa Local Board area.
47. Homai Bowling Club Incorporated encourage participation of Māori through local programmes and this forms part of their community outcomes plan commitments.
48. The club indicated its membership are predominantly Māori, they represent the highest single ethnic proportion of the club at 44 percent. Moreover, the use of Te Reo Māori is encouraged during club activities and events.
49. The group’s social tournaments attract a wide range of new and casual bowlers who are of Māori descent, this includes the six-week business-house tournament and team building for organisations. Furthermore, Māori students from Manurewa High School use the club facilities and equipment as part of the school’s sport and recreation programme.
50. Mana whenua engagement was undertaken on 23 April 2021 and involved a formal written correspondence detailing information regarding the proposed new lease and forwarded to mana whenua representatives allowing 20 working days to respond. No objections to the proposal were received.
51. In addition, the above meets the statutory requirements under section 4 of the Conservation Act 1987 that council engage with mana whenua representatives. Mana whenua will also have an opportunity to provide feedback regarding the proposed lease during the public notification process.
Ngā ritenga ā-pūtea
Financial implications
52. All costs relating to the advertising of the intention to lease and preparation of the lease agreement are borne by Community Facilities.
53. Staff have obtained support from Financial, Strategy and Planning. No concerns were raised regarding the financial implications for the new lease to Homai Bowling Club Incorporated.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
54. Should the Manurewa Local Board resolve not to grant a new community lease for Homai Bowling Club Incorporated, it will inhibit the club’s ability to undertake its core activities which will have a negative impact on the local board outcomes.
55. The club’s operation on War Memorial Park is identified in the non-operative Manukau Sports Parks Management Plan 2007 and is specifically suited to activate the recreational potential of the park in a sustainable manner.
56. As there is no significant departure from the land use or change in activities; there are no identified risks in granting the lease.
57. Additionally, there is risk in relation to the buildings and improvements where council may be liable for assets where budget is neither allocated nor identified in council’s key strategic planning documents.
58. The new lease affords the group’s security of tenure, enabling them to attend to the scheduled maintenance of its assets. If the lease is not granted, the group’s ability to maintain its premises will be severely impacted.
Ngā koringa ā-muri
Next steps
59. Subject to Manurewa Local Board’s approval, public notification will be undertaken. On completion of public notification, and subject to the resolution of any objections, staff will engage with Homai Bowling Club Incorporated to finalise the lease agreement.
Attachments
No. |
Title |
Page |
a⇩ |
Site plan |
53 |
b⇩ |
Community Outcomes Plan |
55 |
Ngā kaihaina
Signatories
Author |
Tai Stirling - Community Lease Advisor |
Authorisers |
Taryn Crewe - General Manager Community Facilities Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
New community lease for Counties Manukau Kindergarten Association Incorporated at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa
File No.: CP2021/06992
Te take mō te pūrongo
Purpose of the report
1. To grant a new community lease for Counties Manukau Kindergarten Association Incorporated at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa.
Whakarāpopototanga matua
Executive summary
2. Counties Manukau Kindergarten Association Incorporated holds an existing community lease for the group-owned assets and adjoining play area located at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa.
3. The lease commenced on 1 April 2001 and reached final expiry on 31 March 2021. The lease is holding over on a month-by-month basis until terminated or a new lease is granted.
4. The association’s objective is to provide accessible and affordable, not-for-profit community based early childhood services for the community in south Auckland. In addition, the group provides a community responsive service that collaborates closely with health and social care providers to support families who require assistance.
5. After assessing the association’s new lease application, staff are satisfied that the requirements under Auckland Council’s Community Occupancy Guidelines 2012 have been met.
6. Mana whenua engagement has been undertaken and public notification will follow, subject to Manurewa Local Board’s approval of the recommendations below.
7. This report recommends that a new community lease be granted for Counties Manukau Kindergarten Association Incorporated, in accordance with the terms and conditions under Auckland Council’s Community Occupancy Guidelines 2012 and the provisions of the Reserves Act 1977.
Recommendation/s
That the Manurewa Local Board:
a) note public notification of Auckland Council’s intention to grant a new community lease for Counties Manukau Kindergarten Association Incorporated for part of Leabank Park, 30R Claymore Street, Manurewa comprising 218 square metres (more or less) and outlined in yellow on Attachment A.
b) delegate to the Manurewa Local Board Chairperson the authority to appoint a hearings panel to consider any objections or submissions received, following the public notification, and for the panel to reach a decision.
c) grant, subject to any objections being resolved, under section 61(2A)(a) and section 73(3) of the Reserves Act 1977, a new community lease to Counties Manukau Kindergarten Association Incorporated for the group-owned assets and adjoining play area comprising 1035 square metres (more or less) located at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa (outlined in red on Attachment B) on the land described as Lot 435 Deposited Plan 63195 contained in Record of Title NA20A/901 and Lot 1 Deposited Plan 51364 contained in Record of Title NA1673/44 (cancelled) subject to the following terms:
i) term - 10 years commencing 17 June 2021, with one (1) 10-year right of renewal commencing 17 June 2031, reaching final expiry on 16 June 2041
ii) rent - $1.00 plus GST per annum if demanded
iii) all other terms and conditions to be in accordance with Auckland Council’s Community Occupancy Guidelines 2012 and the provisions of the Reserves Act 1977.
d) approve the Counties Manukau Kindergarten Association Incorporated’s Community Outcomes Plan (Attachment C) for inclusion as the third schedule of the lease agreement.
Horopaki
Context
8. This report considers the new community lease for Counties Manukau Kindergarten Association Incorporated for its assets and adjoining play area located at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa.
9. The Manurewa Local Board is the allocated authority relating to local recreation, sport and community facilities, including community leasing matters.
Land, Assets and Lease
10. The association holds an existing community lease over its assets and adjoining play area at 19S Solo Place, and part of Leabank Park, 30R Claymore Street, Manurewa (outlined in yellow on Attachment A). The underlying land at 19S Solo Place is legally described as Lot 435 Deposited Plan 63195 contained in Record of Title NA20A/901, held in fee simple by Auckland Council as a classified local purpose (community buildings) reserve, subject to the Reserves Act 1977 (the Act).
11. In addition, the land at 30R Claymore Street is legally described as Lot 1 Deposited Plan 51364 contained in Record of Title NA1673/44 (cancelled), held in fee simple by Auckland Council as a classified recreation reserve, subject to the Act.
12. The assets and adjoining play area are owned by the association, which is also responsible for all maintenance of the leased area.
13. The area proposed to be leased to the association consists of approximately 1035 square metres (more or less) and is outlined in red on Attachment B.
The association
14. Counties Manukau Kindergarten Association Incorporated was established in 1956 and registered under the incorporated societies register on 9 May 1952 and the charities services register on 25 May 2009. The group is affiliated with Early Childhood Leadership and provides an educational early childhood service for children from six months to five years of age.
15. The group’s first early childhood centre was established in the mid 1950’s and located in Pukekohe. At present, the association has 29 early childhood centres and kindergartens across south Auckland.
16. The premises at 19S Solo Place and part of Leabank Park, formerly known as Leabank Kindergarten has been occupied by the association for over 40 years. In 2019, a strategic decision was made by the association to diversify its services by creating a community hub called Te Whare Ngahere Community Hub and Playgroup. The facilty not only provides early childhood services funded by Ministry of Education but it also provides a facility for non-funded health and social community groups and networks to utilise.
17. The group provides additional services that supports its activity, such as:
· the play truck, a free service for families with children up to five years. It brings early childhood education to the neighbourhood. The truck has toys and activities for children to enjoy, also it provides information about some of the early childhood centres and playgroups that are available in the community, where families might like to enrol their children
· the mobile van service, where children are picked up and dropped off to kindergarten if there is difficulty with transportation.
18. The association is committed to ensure the community hub is accessible to the local community in multiple ways whether it be young children and families, teachers and non-funded social and health networks, also support groups.
19. In addition, the group has a Social Worker and Pacific Coordinator based on-site who provides additional support for whānau, also they strengthen various aspects of the programmes and activities undertaken from the community hub.
20. The group has submitted a comprehensive application in support of a new community lease.
Tātaritanga me ngā tohutohu
Analysis and advice
21. The association’s lease application was assessed against the criteria contained in Auckland Council’s Community Occupancy Guidelines 2012 and the priorities set by the Manurewa Local Board Plan 2020.
22. Under the guidelines, groups that own their own buildings have an automatic right to re‑apply for a new lease at the end of their occupancy term, a right which the association is exercising.
23. It is recommended that a new lease be granted to Counties Manukau Kindergarten Association Incorporated for a term of 10 years, with one right of renewal for a further term of 10 years, 20-year total term, the standard term for group-owned buildings in accordance with the guidelines.
24. The local board has discretion to vary the term of the lease if it wishes. However, the guidelines suggest that where the term is varied, it aligns to one of the recommended terms within the Community Occupancy Guidelines 2012.
25. Staff have determined that the association meets the requirements under the guidelines to qualify for a new community lease as evidenced below.
26. The association:
· is registered as a legal entity with a not-for-profit status
· has complied with the terms of the existing lease
· caters to a well-defined group in the local community and its services are well-utilised
· has provided the latest copies of its financial statements and sustains its services predominantly through funding streams from Ministry of Education, parent fees and fundraising
· is managed appropriately as evidenced by its longevity.
27. The assets and adjoining play area are owned by the association, which is also responsible for all maintenance within the leased area. A site visit undertaken indicates that the premises is in adequate condition and meets the needs of the association’s users.
28. The association has a scheduled property repair and maintenance programme to address general maintenance and renewals of its premises as the need arises and budget allows.
29. A community outcomes plan has been negotiated with the association that identifies the benefits the group will provide to the community. This is provided in Attachment C and will be attached as a schedule to the lease agreement.
Public Notification
30. Public notification is required for the association’s occupation on part of Leabank Park and pursuant to section 119 of the Reserves Act 1977 (the Act). Submitters will have one month to make a submission or objection in accordance with section 120 of the Act.
31. If any submission or objection to the proposed lease are received from the public notification process, a hearings panel of the local board will be convened to consider the matter and reach a decision.
32. Following public notification, the occupation of Counties Manukau Kindergarten Association Incorporated on part of Leabank Park can be validated by issuing a new community lease under section 73(3) of the Act; and referenced beneath:
· “Where any recreation reserve or any part of such a reserve is not being used for the purposes of a recreation reserve and in the opinion of the Minister is not likely to be used for that purpose, but it is inadvisable or inexpedient to revoke the reservation, leases of the whole or any part thereof may be granted by the administering body with the prior consent of the Minister in cases where the reserve is vested in such a body, or by the Minister in any other case”.
Tauākī whakaaweawe āhuarangi
Climate impact statement
33. There is no impact on greenhouse gas emissions as the proposal does not introduce any new sources of emissions.
34. The association’s leased area does not sit directly within a flood water (river or surface flooding) zone as a result of a 1‑in-100-year rainstorm event (as shown below).
Counties Manukau Kindergarten circled in red
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
35. Staff have obtained support from colleagues in Land Advisory Services and Area Operations (Community Facilities), Parks Services (Parks, Sports and Recreation) and Community Empowerment (Connected Communities). No concerns were raised regarding the new lease for Counties Manukau Kindergarten Association Incorporated.
36. The proposed new lease has no identified impact on other parts of the council group. The views of council-controlled organisations were not required for the preparation of this report’s advice.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
37. The assessment of the application was noted on the Community Facilities local board combined monthly report for December 2020 also January 2021 and forwarded to the local board in February 2021. In addition, the application was workshopped with the local board on 27 May 2021. Staff received no feedback regarding the proposed new community lease for Counties Manukau Kindergarten Association Incorporated.
38. The proposal lease is an approved item on the Community Facilities Work Programme for 2020/2021 (item 365) and adopted by the local board under resolution number MR/2020/110.
39. The recommendations in this report fall within local board’s allocated authority to grant community leases in line with the Community Occupancy Guidelines 2012.
40. The recommendations within this report predominantly support the Manurewa Local Board Plan 2020 outcomes of:
· Our communities are inclusive, vibrant, healthy and connected (Outcome 1)
· We are proud of our strong Māori identity and thriving Māori community (Outcome 2)
· Our people enjoy a choice of quality community spaces and use them often (Outcome 3).
41. The proposed lease will benefit the local community in enabling initiatives that promote the preservation and encourage the growth and spread of quality early childhood services, and a facility for non-funded health and social community groups and networks to utilise.
Tauākī whakaaweawe Māori
Māori impact statement
42. Auckland Council is committed to meeting its responsibilities under Te Tiriti o Waitangi which are articulated in council’s key strategic planning documents the Auckland Plan, the 10-year budget (long-term plan), the Auckland Unitary Plan and local board plans.
43. An aim of community leasing is to increase targeted support for Māori community development. The proposal seeks to improve access to facilities for all Aucklanders, including Māori living in the Manurewa Local Board area.
44. Counties Manukau Kindergarten Association Incorporated acknowledge the place of mana whenua within Aotearoa and value initiatives that are inclusive and enhances partnership and participation of all people including Māori. Furthermore, the group encourage participation of Māori through local programmes and this forms part of their community outcomes plan commitments.
45. The association indicated it is committed to working alongside the large Māori population that are part of the south Auckland region in conjunction with health, social development and community services in Manurewa and its surrounding communities, such as:
· Māori Women’s Welfare League
· Māori Women’s Refuge
· Manurewa and Papakura Marae and,
· Counties Manukau Health.
46. The group informed the purpose of working alongside the services above is to strengthen funded and non-funded projects designed to grow an early childhood and wider community network focused on positive educational, social and health outcomes for tamariki (children) and whānau.
47. Mana whenua engagement was undertaken on 6 May 2021 and involved a formal written correspondence detailing information concerning the proposed new lease and forwarded to mana whenua representatives allowing 20 working days to respond.
48. Staff received a response from Ngāi Tai ki Tāmaki on 7 May 2021 with no objection to the proposal. No further responses were received from mana whenua.
49. In addition, the above meets the statutory requirements under section 4 of the Conservation Act 1987 that council engage with mana whenua representatives. Mana whenua will also have an opportunity to provide feedback regarding the proposed lease on part of Leabank Park during the public notification process.
Ngā ritenga ā-pūtea
Financial implications
50. All costs relating to the advertising of the intention to lease and preparation of the lease agreement are borne by Community Facilities.
51. Staff have obtained support from Financial, Strategy and Planning. No concerns were raised regarding the new lease for Counties Manukau Kindergarten Association Incorporated.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
52. Should the Manurewa Local Board resolve not to grant a new community lease to Counties Manukau Kindergarten Association Incorporated for its premises, it will inhibit the association’s ability to undertake its core activities which will have a negative impact on the local board outcomes.
53. The association has occupied its premises on the mentioned land for over 40 years. As there is no significant departure from the land use or change in activities; there are no identified risks in granting the lease.
54. Additionally, there is risk in relation to the buildings and improvements where council may be liable for assets where budget is neither allocated nor identified in council’s key strategic planning documents.
55. The new lease affords the association’s security of tenure, enabling them to apply for funding and attend to the scheduled maintenance of its facility. If the lease is not granted, the group’s ability to seek funding opportunities and maintain its premises will be severely impacted.
Ngā koringa ā-muri
Next steps
56. Subject to Manurewa Local Board’s approval, public notification will be undertaken. On completion of public notification, and subject to the resolution of any objections, staff will engage with Counties Manukau Kindergarten Association Incorporated to finalise the lease agreement.
Attachments
No. |
Title |
Page |
a⇩ |
Site plan for Counties Manukau Kindergarten Association Incorporated’s occupation on part of Leabank Park, 30R Claymore Street, Manurewa |
65 |
b⇩ |
Site plan for Counties Manukau Kindergarten Association Incorporated at 19S Solo Place and part of Leabank Park, 30R Claymore Street, Manurewa |
67 |
c⇩ |
Community Outcomes Plan |
69 |
Ngā kaihaina
Signatories
Author |
Tai Stirling - Community Lease Advisor |
Authorisers |
Taryn Crewe - General Manager Community Facilities Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Nathan Homestead Café Licence to Occupy Agreement
File No.: CP2021/08143
Te take mō te pūrongo
Purpose of the report
1. To seek the approval of a Licence to Occupy agreement for a three-year period for the café and catering service at Nathan Homestead, 68R Hill Road, Manurewa for a high-quality community centred food business.
Whakarāpopototanga matua
Executive summary
2. The David Nathan Park and Nathan Homestead Strategic Business Plan 2016 – 2026 (Attachment A) provided a robust consultation and visioning process and highlighted the communities interest in a ‘high-quality café’ being maintained at Nathan Homestead.
3. Renovations in the homestead have improved the functionality of the service and environment of the café, and a new operator has been sought through an Expression of Interest (EOI) process.
4. As a result of the economic pressure resulting from COVID-19 shutdown, the previous operator was unable to continue to sustain the operation of Butler’s Pantry café. The operator closed the operation of the café kitchen operation on 26 March 2021.
5. Proposals were called for through an EOI in April 2021. Nathan Homestead has retained staff to continue operation of the front of house service at the café until a new operator is identified.
6. Four proposals were received and assessed by a panel of council staff and local business association member. Staff recommend that the local board approve Hill House Café Limited for a Licence to Occupy agreement for three years at an annual operating charge of $56.15 per square meter (+ GST) of exclusive space occupied with options to extend temporary seating to the front and rear verandas.
7. The new operator is offered a rent-free period of six months from 21 June to 20 December 2021 to establish a customer base and increase services and visitor satisfaction to users of Nathan Homestead.
8. Negotiations with Hill House Café Limited have been underway with management at Nathan Homestead to agree on the terms and conditions of the licence and to progress our partnership for the successful operation of the community café.
Recommendation/s
That the Manurewa Local Board:
a) approve a Licence to Occupy agreement to Hill House Café Limited for the café premisses at Nathan Homestead from 21 June 2021 – 20 June 2024, subject to the following conditions:
i) term – three years, with right for renewal for two years
ii) rent – fifty-six dollars ($56.15) plus GST, per square meter per annum for the exclusive spaces occupied (65m2) plus outgoings as follows:
· storage area (10.59 m2)
· café area (38.80m2)
· kitchen (15.61m2).
iii) access to shared spaces including the front and rear veranda and outside storage area by negotiation with management.
Horopaki
Context
9. Nathan Homestead, situated in David Nathan Park, has operated as a community and cultural centre since 1978.
10. Nathan Homestead is identified within Appendix 9 – Schedule of Significant Historic Heritage Places in the Auckland Unitary Plan as a Category A Significant Historic Heritage Place.
11. In 2016, the local board adopted the David Nathan Park and Homestead Strategic Business Plan 2016 – 2026 (MR/2016/40) (Attachment A). The local board invested in capital renewals for the Homestead annually between 2016 and 2019 (MR/2016/108, MR/2017/127, MR/2018/139, MR/2019/111) to ensure the facility was fit-for-purpose.
12. The vision of the strategic business plan is that David Nathan Park and Homestead is an iconic and treasured community place in Manurewa where people create, celebrate, and connect while surrounded by nature and history.
13. The renewals work prioritised returning the café operating area to the original heritage architecture, lifting the ceiling to expose the original corbeled ceiling, and expanding the serviceable areas and seating.
14. Auckland Council owns the land and buildings at Nathan Homestead, 68R Hill Road, Manurewa. The space available for the café service/seating area comprises 38.80m2 and is located within the community centre.
15. Butler’s Pantry operated the café since 2018 and closed in March 2021 due to the financial implications of COVID-19.
16. An EOI process opened in March 2021 to identify a new operator. Applicants were asked to provide a proposal, which was assessed against its alignment to the following criteria:
· creating an inviting, inclusive, and enjoyable place for local people of all ages
· providing fresh and healthy food options
· promoting Nathan Homestead as a place for local people and an outstanding destination in south Auckland
· promoting the buildings and grounds as an attractive venue for hire and for community use
· providing a high-quality café experience connected to the gardens and outdoor environment
· operating efficiently, effectively, and in a sustainable manner.
Tātaritanga me ngā tohutohu
Analysis and advice
17. The Licence to Occupy includes the exclusive use of a fully equipped kitchen 15.61m2 and a dedicated lockable storage area of 10.59m2. The kitchen contains basic oven, range, dishwasher, microwave, chest refrigerator and bench space including basic equipment and utensils.
18. The kitchen is available to the operator daily for food preparation from 6am to 5pm Monday to Friday and by negotiation with management.
19. Staff received four proposals from individuals to operate the café.
20. Additional information was requested by the Manager Nathan Homestead from all applicants, with specific questions designed to give the assessment panel additional information on the application that was not captured in the proposals.
21. All the proposals were considered by a panel of council staff drawn from The Southern Initiative, Community Places and a representative from the Manurewa Business Association. The proposals were scored using a weighted matrix against the Selection Criteria.
22. Following the combination of panel members’ scores, the proposals were then discussed at a Manurewa Local Board workshop on June 3, 2021.
23. A Licence to Occupy is required for Hill House Café Limited to operate the café at Nathan Homestead. The local board is the decision maker for the license approval under the Reserves Act.
24. Based on the four applications, the scoring matrix and the assessment panel, Hill House Café scored the highest score based on the criteria and is the recommended successful licensee.
25. Staff recommend approving the Licence to Occupy for the café at Nathan Homestead to Hill House Café Limited from 21 June 2021 to 20 June 2023, with right of renewal for two years and charged an annual operating charge of $56.15 (+ GST) per square meter of exclusive space occupied within the Homestead.
Hill House Café Limited (Ricardo Le Roux)
26. Ricardo is a trained chef and has worked as an Executive chef in a variety of establishments internationally and in New Zealand over the last 8 years. He is currently a resident of Mt Eden with a background in hospitality, catering and customer service.
27. He proposes Hill House Café Limited will be a warm, affordable, and inviting cafe serving fresh, highly seasonal dishes as well as daily baked cabinet treats with a focus on utilising locally sourced and sustainably grown ingredients, home grown produce with low waste principle through reduction, reuse, recycling, and rot (composting).
28. Ricardo aims to provide an all-inclusive, safe, and friendly space where all members of the community can come together regardless of their age, orientation or social identity. To achieve this, we will focus on excellent and friendly customer service, quality food and great coffee in a warm and inviting space. Hill House Café Limited will become that special place for those looking for a stunning cafe experience where the community can come together to share kai, build memories, and celebrate life in the beautiful setting that is Nathan Homestead.
29. In partnering with Nathan Homestead and Auckland Council, he is interested in the opportunity to use the cafe as an activation point to enable us to offer extra services to the community beyond our cafe footprint e.g., catering and beverage services for events and functions within the centre, creating school holiday cooking programmes for our tamariki and plant-based cooking classes for their parents, offering outdoor picnics for specific events (eg. NZ Music Month, Proud Centres, Matariki, etc), creating activities with the focus on Manurewa communities.
Licence to Occupy
30. Staff recommend that the local board approve a Licence to Occupy agreement to Hill House Café Limited for the café premisses at Nathan Homestead from 21 June 2021 – 20 June 2024, with right-of-renewal for one year over two consecutive years. This is expected to give the new operator sufficient time to establish a new offering at Nathan Homestead.
31. The recommended operator is a limited liability company and staff recommends a fee to cover their share of the outgoings of the facility including utilities (e.g. power and water) security, rubbish removal and maintenance provided by council.
32. Staff recommend that annual operational charge for the community café is ($56.15) per square meter (+ GST) for the exclusive space occupied (i.e. not including shared areas spaces including external storage and front and rear veranda to be booked by negotiation with Management) and that this be used to set the fee for the Licence to Occupy agreement.
33. The exclusive spaces to be occupied are indicated in yellow, with shared spaces indicated in green (Attachment B):
· Storage area (10.59 m2)
· Café area (38.80m2)
· Kitchen (15.61m2).
Tauākī whakaaweawe āhuarangi
Climate impact statement
34. The recommended new café operator is committed to utilising locally sourced and sustainably grown ingredients, home grown produce with low waste principle through reduction, reuse, recycling, and rot (composting).
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
35. Council’s legal team has provided advice on the conditions of the Licence to Occupy.
36. Community Facilities are responsible for ongoing maintenance and security for the café and kitchen area.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
37. The local board were informed of the decision by the Butler’s Pantry to close March 2021, and Council’s intention to seek a new café operator.
38. At a workshop on 3 June 2021, the local board discussed the proposed lease and provided feedback.
39. The continuation of the café at Nathan Homestead will provide an opportunity for people in Manurewa to come together and connect in the park and homestead and will support new innovative business opportunities for local people.
40. This will contribute to the local board achieving the following outcomes in the 2020 Manurewa Local Board Plan:
· Outcome 1: Our communities are inclusive, vibrant, healthy and connected
· Outcome 3: Our people enjoy a choice of quality community spaces and use them often
· Outcome 5: Our prosperous local economy supports local people.
Tauākī whakaaweawe Māori
Māori impact statement
41. Iwi were consulted on the recent Reserve Management Plan for David Nathan Park Reserve, which included a café in the footprint of the Homestead.
42. Mana whenua support a community café at Nathan Homestead and see food as an essential component of community connection and encourage more programming involving food, gardening, rongoa Māori and connection to the whenua.
43. Auckland Council is committed to meeting its responsibilities under Te Tiriti Waitangi and its broader legal obligations to Māori. The council recognises these responsibilities are distinct from the Crown’s Treaty obligations and fall within a local government Tāmaki Makaurau context. These combinations are articulated in the council’s key strategic planning documents the Auckland Plan, the 2015-2025 Long Term Plan, the Auckland Unitary Plan and local board plans.
44. Support for Māori initiatives and outcomes are detailed in Whiria Te Muka Tangata, Auckland Council’s Māori Responsiveness Framework. An aim of Connected Communities is to increase Māori wellbeing through support for Māori community projects. Additionally, it seeks to improve access to facilities and participation for Māori living in the Manurewa Local Board area.
Ngā ritenga ā-pūtea
Financial implications
45. There are no financial implications for council in the preparation of the hire agreement.
46. The Licence to Occupy is a community agreement valued at $3,650 per annum plus outgoings.
47. There are additional opportunities to increase revenue through catering and events.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
48. There is a risk that if the Licence is not approved then the café will need to close for operating, which would impact on the visitor numbers and customer experience of Nathan Homestead.
49. There is a risk that the café will not be commercially successful in the future. This was mitigated through a robust EOI process to find an appropriate operator with proven experience running a café service.
50. There is a risk that the café will continue to increase in customer numbers and will need to expand beyond the capacity of the current site. This can be mitigated by considering repurposing other areas of Nathan Homestead.
Ngā koringa ā-muri
Next steps
51. Following approval from the local board, staff will administer the Licence to Occupy agreement Hill House Café Limited.
Attachments
No. |
Title |
Page |
a⇨ |
David Nathan Park and Homestead Business Plan 2016-2026 (Under Separate Cover) |
|
b⇩ |
Ground Floor Plan, Nathan Homestead |
77 |
Ngā kaihaina
Signatories
Author |
Sarah Houston - Place & Partner Specialist |
Authorisers |
Mirla Edmundson - General Manager Libraries & Information Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
Manurewa Local Grant Round Four 2020/2021 and Multiboard Grant Round Two 2020/2021 grant allocations
File No.: CP2021/07485
Te take mō te pūrongo
Purpose of the report
1. To fund, part-fund or decline applications for Manurewa Local Grant Round Four 2020/2021 and Manurewa Multiboard Grant Round Two 2020/2021.
Whakarāpopototanga matua
Executive summary
2. This report presents applications received for the Manurewa Local Grant Round Four 2020/2021 (refer Attachment B) and Manurewa Multiboard Grant Round Two 2020/2021 (refer Attachment C).
3. The Manurewa Local Board adopted the Manurewa Local Board Grants Programme 2020/2021 on 21 May 2020 (MR/2020/57) (refer Attachment A). The document sets application guidelines for contestable community grants submitted to the local board.
4. The Manurewa Local Board set a total community grants budget of $194,817 for the 2020/2021 financial year.
5. In Manurewa Local Board Grant Round One 2020/2021, a total of $49,214 was allocated. In round two, $60,675.43 was allocated and in round three, $51,279 was allocated. A total of $76,744 was reallocated from the local boards Locally Driven Initiative (LDI) budget (MR/2021/38). This leaves a total of $110,392.57 to be allocated to the remaining grant rounds.
6. In Manurewa Local Board Grant Round Four 2020/2021, a total of 35 local grant applications were received, requesting a total amount of $262,928.96. In Manurewa Multiboard Local Grants Round Two 2020/2021, 17 applications were received, requesting a total of $72,335.00
Recommendation/s That the Manurewa Local Board: a) agree to fund, part-fund or decline each application in Manurewa Local Grant Round Four 2020/2021
Table One: Manurewa Local Grant Round Four 2020/2021 applications
b) agree to fund, part-fund or decline each application in Manurewa Multiboard Local Grants Round Three 2020/2021
Table Two: Manurewa Multiboard Local Grants Round Three 2020/2021 applications
|
Horopaki
Context
7. The local board allocates grants to groups and organisations delivering projects, activities and services that benefit Aucklanders and contribute to the vision of being a world class city.
8. The Auckland Council Community Grants Policy supports each local board to adopt a grants programme. The local board grants programme sets out:
· local board priorities
· lower priorities for funding
· exclusions
· grant types, the number of grant rounds and when these will open and close
· any additional accountability requirements.
9. The Manurewa Local Board adopted its grants programme for 2020/2021 on 21 May 2020 (MR/2020/57) and will operate four local grant rounds this financial year.
10. The community grant programmes have been extensively advertised through the council grants webpage, local board webpages, local board e-newsletters, Facebook pages, council publications, radio, and community networks.
11. The Manurewa Local Board set a total community grants budget of $194,817 for the 2020/2021 financial year.
Tātaritanga me ngā tohutohu
Analysis and advice
12. The aim of the local board grant programme is to deliver projects and activities which align with the outcomes identified in the local board plan. All applications have been assessed utilising the Community Grants Policy and the local board grant programme criteria. The eligibility of each application is identified in the report recommendations.
Tauākī whakaaweawe āhuarangi
Climate impact statement
13. The local board grants programme aims to respond to Auckland Council’s commitment to address climate change by providing grants to individuals and groups for projects that support and enable community climate action. Community climate action involves reducing or responding to climate change by local residents in a locally relevant way. Local board grants can contribute to expanding climate action by supporting projects that reduce carbon emissions and increase community resilience to climate impacts. Examples of projects include local food production and food waste reduction; increasing access to single-occupancy transport options, home energy efficiency and community renewable energy generation; local tree planting and streamside revegetation; and educating about sustainable lifestyle choices that reduce carbon footprints.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
14. Based on the main focus of an application, a subject matter expert from the relevant department will provide input and advice. The main focus of an application is identified as arts, community, events, sport and recreation, environment or heritage.
15. The grants programme has no identified impacts on council-controlled organisations and therefore their views are not required.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
16. Local boards are responsible for the decision-making and allocation of local board community grants. The Manurewa Local Board is required to fund, part-fund or decline these grant applications against the local board priorities identified in the local board grant programme.
17. Staff will provide feedback to unsuccessful grant applicants about why they have been declined to increase their chances of success next time.
Tauākī whakaaweawe Māori
Māori impact statement
18. The local board grants programme aims to respond to Auckland Council’s commitment to improving Māori wellbeing by providing grants to individuals and groups who deliver positive outcomes for Māori. Auckland Council’s Ngā Mātārae department has provided input and support towards the development of the community grant processes.
19. Eleven applicants indicated their projects will aim to meet Maori outcomes.
Ngā ritenga ā-pūtea
Financial implications
20. The allocation of grants to community groups is within the adopted Long-term Plan 2018-2028 and local board agreements.
21. The Manurewa Local Board has set a total community grants budget of 194,817 for the 2020/2021 financial year.
22. In Manurewa Local Board Grant Round One 2020/2021, a total of $49,214 was allocated. In round two, $60,675.43 was allocated and in round three, $51,279 was allocated. A total of $76,744 was reallocated from the local boards Locally Driven Initiative (LDI) budget (MR/2021/38). This leaves a total of $110,392.57 to be allocated to the remaining grant rounds.
23. In Manurewa Local Board Grant Round Four 2020/2021, a total of 35 local grant applications were received, requesting a total amount of $262,928.96. In Manurewa Multiboard Local Grants Round Two, 17 applications were received, requesting a total of $72,335.00.
24. Relevant staff from Auckland Council’s Finance Department have been fully involved in the development of all local board work programmes, including financial information in this report, and have not identified any additional financial implications.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
25. The allocation of grants occurs within the guidelines and criteria of the Community Grants Policy and the local board grants programme. The assessment process has identified a low risk associated with funding the applications in this round.
Ngā koringa ā-muri
Next steps
26. Following the Manurewa Local Board allocating funding for Local Grants Round Four, grants staff will notify the applicants of the local board’s decision.
Attachments
No. |
Title |
Page |
a⇩ |
Manurewa Grant Programme 2020/2021 |
91 |
b⇨ |
Manurewa Local Grant Round Four 2020/2021 grant applications (Under Separate Cover) |
|
c⇨ |
Manurewa Multiboard Round Two 2020/2021 grant applications (Under Separate Cover) |
|
Ngā kaihaina
Signatories
Author |
Marion Davies - Grants and Incentives Manager |
Authorisers |
Rhonwen Heath - Head of Rates Valuations & Data Mgmt Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Adoption of the Manurewa Local Board Agreement 2021/2022
File No.: CP2021/07417
Te take mō te pūrongo
Purpose of the report
1. To adopt the local content for the 10-year Budget, which includes the Manurewa Local Board Agreement 2021/22, the message from the chair, and local board advocacy.
2. To adopt a local fees and charges schedule for 2021/2022.
Whakarāpopototanga matua
Executive summary
3. Each financial year, Auckland Council must have a local board agreement, as agreed between the Governing Body and the local board, for each local board area.
4. From 22 February to 22 March 2021, council consulted on the proposed 10-year Budget 2021-2031. Local boards considered this feedback and then held discussions with the Finance and Performance Committee on 12 May 2021 on regional issues, community feedback, and key local board initiatives and advocacy areas.
5. Local boards are now considering local content for the 10-year Budget 2021-2031 which includes a local board agreement, a message from the chair, and local board advocacy, as well as a local fees and charges schedule for 2021/2022.
6. On 29 June 2021, the Governing Body will meet to adopt Auckland Council’s 10-year Budget 2021-2031, including 21 local board agreements.
Recommendation/s
That the Manurewa Local Board:
a) adopt the local content for the 10-year Budget, which includes the Manurewa Local Board Agreement 2021/22, the message from the chair, and local board advocacy, which will be tabled at the meeting and attached to the minutes
b) adopt a local fees and charges schedule for 2021/2022 (Attachment A)
c) delegate authority to the Chair to make any final changes to the local content for the 10-year Budget 2021-2031 (the Manurewa Local Board Agreement 2021/22, message from the chair, and local board advocacy)
d) note that the resolutions of this meeting will be reported back to the Governing Body when it meets to adopt the 10-year Budget 2021-2031, including each Local Board Agreement, on 29 June 2021.
Horopaki
Context
7. Local board plans are strategic documents that are developed every three years to set a direction for local boards. Local board plans influence and inform the 10-year Budget 2021-2031 which outlines priorities, budgets and intended levels of service over a 10-year period. For each financial year, Auckland Council must also have a local board agreement, as agreed between the Governing Body and the local board, for each local board area.
8. Throughout the development of the 10-year Budget 2021-2031, local board chairs (or delegated local board representatives) have had the opportunity to attend Finance and Performance Committee workshops on key topics and provide local board views on regional issues being considered as part of the 10-year Budget 2021-2031.
9. From 22 February to 22 March 2021, the council consulted with the public on the 10-year Budget 2018-2028. One hearing style event was held in the Manurewa Local Board area to engage with the community and seek feedback on both regional and local proposals.
10. A report analysing the feedback on local board priorities, as well as feedback from those living in the local board area related to the regional issues, was included as an attachment on the 6 May 2021 business meeting agenda.
11. Local boards considered this feedback, and then held discussions with the Finance and Performance Committee at a workshop on 12 May 2021 on regional issues, community feedback and key local board initiatives and advocacy areas.
Tātaritanga me ngā tohutohu
Analysis and advice
12. Both staff and the local board have reviewed the local feedback received as part of consultation on 10-year Budget 2021-2031 and local boards have received a report analysing the local feedback. It is now recommended that local boards adopt local content for the 10-year Budget 2021-2031 (which will be tabled at the meeting), including the Local Board Agreement 2021/2022, the message from the chair, and local board advocacy, as well as a local fees and charges schedule for 2021/2022 (Attachment A).
Tauākī whakaaweawe āhuarangi
Climate impact statement
13. The decisions recommended in this report are procedural in nature and will not have any climate impacts themselves.
14. Some of the proposed projects in the Local Board Agreement may have climate impacts. The climate impacts of any projects Auckland Council chooses to progress with will be assessed as part of the relevant reporting requirements.
15. Some of the proposed projects in the Local Board Agreement will be specifically designed to mitigate climate impact, build resilience to climate impacts, and restore the natural environment.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
16. Local boards worked with council departments to develop their local board work programmes for 2021/2022 that will be adopted at June business meetings. The local board work programmes help inform the local board agreements.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
17. This report seeks local board adoption of its content for the 10-year Budget 2021-2031 and other associated material, including the Local Board Agreement 2021/2022.
Tauākī whakaaweawe Māori
Māori impact statement
18. Many local board decisions are of importance to and impact on Māori. Local board agreements and the 10-year Budget are important tools that enable and can demonstrate council’s responsiveness to Māori.
19. Local board plans, which were developed in 2020 through engagement with the community including Māori, form the basis of local priorities. There is a need to continue to build relationships between local boards and iwi, and where relevant the wider Māori community.
20. Of those who submitted to the 10-year Budget 2021-2031 from the Manurewa Local Board area 35 identified as Māori. Six iwi entities from the Manurewa Local Board rohe also made a submission to the 10-year Budget 2021-2031. These submissions were provided to the local board for consideration at local board workshops during the development of their local board agreement.
21. Ongoing conversations will assist local boards and Māori to understand each other’s priorities and issues. This in turn can influence and encourage Māori participation in council’s decision-making processes.
Ngā ritenga ā-pūtea
Financial implications
22. The local board agreement includes the allocation of locally driven initiatives (LDI) funding and asset based services (ABS) funding to projects and services for the 2021/2022 financial year.
23. LDI funding is discretionary funding allocated to local boards based on the Local Board Funding Policy (included in the 10-year Budget), which local boards can spend on priorities for their communities. Local boards can also utilise LDI funding to increase local levels of service if they wish to do so.
24. Funding for asset based services (ABS) is allocated by the Governing Body to local boards based on current levels of service to run and maintain local assets and services including parks, pools and recreation facilities, community facilities, and libraries.
25. A local fees and charges schedule for 2021/2022 is adopted alongside of the Local Board Agreement 2021/2022. The fees and charges have been formulated based on region-wide baseline service levels and revenue targets. Where fees and charges are amended by a local board that results in lower revenue for the council, the shortfall will need to be made up by either allocating LDI funds or reducing expenditure on other services to balance overall budgets.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
26. Decisions on the local content of the 10-year Budget 2021-2031, including the Local Board Agreement 2021/2022 and a local fees and charges schedule for 2021/2022, are required by 17 June 2021 to ensure the Governing Body can adopt the final 10-year Budget 2021-2031, including each Local Board Agreement, at its 29 June 2021 meeting.
Ngā koringa ā-muri
Next steps
27. The resolutions of this meeting will be reported to the Governing Body on 29 June 2021 when it meets to adopt the 10-year Budget 2021-2031, including 21 local board agreements.
28. It is possible that minor changes may need to be made to the attachments before the 10-year Budget 2021-2031 is adopted, such as correction of any errors identified and minor wording changes. Staff therefore recommend that the local board delegates authority to the Chair to make any final changes if necessary.
29. Local board agreements set the priorities and budget envelopes for each financial year. Work programmes then detail the activities that will be delivered within those budget envelopes. Work programmes will be agreed between local boards and operational departments at business meetings in June 2021.
Attachments
No. |
Title |
Page |
a⇩ |
Local fees and charges schedule 2021/2022 |
97 |
Ngā kaihaina
Signatories
Author |
Francis Martin - Advisor Plans & Programmes |
Authorisers |
Louise Mason - GM Local Board Services Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Approval of the 2021/2022 Manurewa Local Board Customer and Community Services work programme
File No.: CP2021/07777
Te take mō te pūrongo
Purpose of the report
1. To approve the 2021/2022 Manurewa Local Board Customer and Community Services work programme and approve in principle the 2022/2023 and 2023/2024 work programmes (Attachment A).
Whakarāpopototanga matua
Executive summary
2. This report presents the 2021/2022 Manurewa Local Board Customer and Community Services work programme with associated budget for approval, as well as the subsequent two financial years, 2022/2023 and 2023/2024 work programmes for approval in principle.
3. The local board approves the work programme each financial year. Delivery of the approved work programme will support the local board to achieve the outcomes and aspirations in the Manurewa Local Board Plan 2020.
4. The work programme details the activities to be delivered by departments within the Customer and Community Services directorate.
5. The work programme has been developed through a series of workshops between December 2020 and May 2021, where the local board provided feedback to staff on project and activity prioritisation.
6. The work programme development process takes an integrated approach to scoping activity, involving collaboration between staff from across council and the local board.
7. Several projects in the 2022/2023 and 2023/2024 work programme have been identified as part of the Risk Adjusted Programme. Approval is sought for the planning and design of these projects to commence during 2021/2022, so that they are ready to be delivered early if approved projects for delivery in 2021/2022 are delayed for any unforeseen reason.
8. The work programme includes projects proposed to be funded from regional budgets subject to approval by the relevant Governing Body committee. The local board can provide formal feedback on these regional projects through resolution to this report.
9. The most significant risk to successful delivery of the 2021/2022 work programme is a change in COVID-19 alert levels that would impact delivery timeframes and budget.
10. Updates on the progress of the work programme delivery will be provided through the local board’s quarterly performance reports.
Recommendation/s
That the Manurewa Local Board:
a) approve the 2021/2022 Customer and Community Services work programme and associated budget and approve, in principle, the 2022/2023 and 2023/2024 work programmes (Attachment A to the agenda report).
b) approve the Risk Adjusted Programme projects identified in the 2021/2022 Customer and Community Services work programme (Attachment A to the agenda report).
c) note that funding for the Coastal Renewals, Landslide Prevention, Local Parks and Sports Field Development and the Natural Environment Targeted Rate budgets are subject to approval by the relevant Governing Body committee.
d) provide feedback for consideration by the relevant Governing Body committee on projects funded from the Coastal Renewals, Landslide Prevention, Local Parks and Sports Field Development and the Natural Environment Targeted Rate budgets (Attachment D to the agenda report).
Horopaki
Context
11. Customer and Community Services provide a wide range of services, facilities, open spaces and information that support communities to connect, enjoy and embrace the diversity of our people, places and natural environment. These are tailored to the unique needs of the local community in a place-based approach.
12. The 2021/2022 Customer and Community Services work programme (included as Attachment A) outlines the local board’s priorities to be delivered within the financial year.
13. The work programme aligns to council plans, policies, and strategies. Each activity in the work programme delivers to a specific objective relating to one or more of the following 2020 Local Board Plan outcomes:
· Outcome 1 - Our communities are inclusive, vibrant, healthy, and connected
· Outcome 2 - We are proud of our strong Māori identity and thriving Māori community
· Outcome 3 - Our people enjoy a choice of quality community spaces and use them often
· Outcome 5 - Our prosperous local economy supports local people
· Outcome 6 - Our natural environment is valued, protected, and enhanced
14. Development of the work programme is based on the understanding of:
· local community needs
· service and asset availability
· funding availability
· the work performed by other parties, including iwi partners, Council Controlled Organisations, community groups and commercial enterprises
· risks
· feedback received from the local board at workshops.
Tātaritanga me ngā tohutohu
Analysis and advice
15. Delivery of the work programme is the realisation of the local board’s aspirations for their community, as identified in the Manurewa Local Board Plan 2020.
16. The local board has discretion to allocate a portion of their budget to a project or activity that they identify as a priority across the three-year work programme period.
17. Out of the initiatives signalled in the local board plan, the local board has prioritised the activities to be delivered in the next three years within available budgets.
18. The work programme provides a three-year view that demonstrates the phasing of programme and project delivery for the following financial years:
· 2021/2022 (to be approved)
· 2022/2023 (to be approved in principle)
· 2023/2024 (to be approved in principle).
19. The local board can approve the work programme for the first financial year and subsequently, delivery of this activity will commence from 1 July 2021. The local board can approve the following two years in principle only.
20. This allows the work programme to be presented in a future focused way that shows how the local board plan will be responded to for the entirety of its three-year strategy, without locking down future investment before that activity is properly scoped.
21. The local board will approve the 2022/2023 work programme in June 2022 and approve the 2023/2024 work programme in June 2023. This will include opportunity to make changes to these work programmes prior to approval, including adding or removing activities and budget allocations, unless funding has already been committed.
22. However, approval of unique multi-year projects, particularly capital works, in the 2021/2022 work programme will commit the local board to the future funding associated with completing the project in 2022/2023 or 2023/2024.
23. The work programme includes a continuation of delivery from previous financial years, including annually occurring events or projects, ongoing programmes, new activities and investments, and potential carry-forward items.
24. Regular updates on the delivery of the programme will be provided to the local board through quarterly performance reports. These updates will identify progress of all projects, highlight risks, and advise if amendments to the budget or delivery timeframes are required.
COVID-19 recovery is a priority for Customer and Community Services
25. A priority of the work programme is to deliver activities that respond to the impacts of COVID-19 on the following:
· newly vulnerable communities
· council financial constraints
· building community resilience for recovery.
26. Customer and Community Services is positioned well to deliver services that are key to the economic and social recovery of communities most in need, including by providing:
· safe and welcoming spaces
· inclusive events to bring the community back together
· community supports, including grants
· stronger connections with other organisations, including Council Controlled Organisations, iwi partners, business associations, community organisations and central government agencies who also serve our communities.
Delivering outcomes for, and with, Māori
27. Council has important statutory obligations with respect to Te Tiriti o Waitangi – The Treaty of Waitangi. The strategic framework that informs council’s delivery and performance measurement of Māori outcomes is Kia Ora Tāmaki Makaurau Māori Outcomes Measurement Framework.
28. Within this strategic framework, Customer and Community Services is responsible for leading activities that deliver against the following outcomes and objectives in Table 1.
Table 1: Kia ora Tāmaki Makaurau outcomes and objectives
Mana outcome |
Outcome statement |
Mahi objective |
Kia ora te Marae |
Marae are centres of excellence for whānau Māori and have an abundant presence in communities. |
Invest in marae to be self-sustaining and thriving hubs for Māori and the wider community. |
Kia ora te Whānau |
Empowered whānau Māori across Tāmaki Makaurau. |
The council group will enable whānau Māori to experience relevant and welcoming public facilities and services. It will support Māori-led services where appropriate. |
Kia ora te Reo |
Ko te reo Māori te mauri o te mana Māori |
The council group supports te reo Māori to be seen, heard, spoken and learned throughout Tāmaki Makaurau. |
29. The work programme includes activities that have an objective to deliver moderate to high outcomes for and with Māori in one or more of the following strategic priority areas:
· Kaitiakitanga
· Māori business, tourism and employment
· Māori identity and culture
· marae development
· papakāinga and Māori housing
· realising rangatahi potential
· te reo Māori
· whānau and tamariki wellbeing.
30. Activities in the work programme that aim to achieve high Māori outcomes in one or more of the strategic priority areas are identified in Attachment B.
31. The Manurewa Local Board work programme includes 14 activities that are identified as delivering moderate to high outcomes for Māori.
32. Progress updates on delivery of Māori outcomes will be provided to the local board through quarterly performance reports.
Types of budget
33. Work programme activities are funded from budget sources dependent on the type of delivery. Some activities within the work programme have budget allocated from two or more sources, including budgets from both local and regional programmes.
34. Table 2 outlines the different budget types and their purpose that fund the work programme.
Table 2: work programme budget types and purpose
Budget type |
Description of budget purpose |
Locally Driven Initiatives (LDI) |
A development fund used to advance local operational and capital activities at the discretion of the local board |
Asset Based Services (ABS) |
Allocated by the Governing Body to deliver local activities based on decisions regarding region-wide service levels, including allocation of funds for local asset-based services |
Local renewals |
A fund dedicated to the renewal (servicing or replacement) of assets including those in local parks and community facilities |
Growth (local parks and sports field development) |
Primarily funded through development contributions, a regional fund to improve open spaces, including developing newly acquired land into parks, and existing open space to increase capacity to cater for growing population needs |
Coastal |
A regional fund for the renewal of Auckland’s significant coastal assets, such as seawalls, wharves and pontoons. |
Landslide prevention |
A regional fund to proactively develop new assets for the prevention of landslides and major slips throughout the region |
Specific purpose funding |
Funds received by the council from external sources held for specific local board areas and service agreements including compensation funding from other agencies for land acquisitions required for major projects |
One Local Initiative (OLI) |
Funds allocated by the Governing Body to a local board priority project in alignment with the Long-term Plan 2018-2028 |
Long-term Plan discrete |
Funds associated with activities specifically named and listed in previous long-term plans, including new libraries, community centres and major sports and community infrastructure |
Kauri Dieback Funding |
As part of the Natural Environment Targeted Rate (NETR) Fund, this is a regional fund from the Environment and Climate Change Committee used to implement the national kauri dieback programme standards |
External funding |
Budget from external parties, not yet received and held by Customer and Community Services |
Capital projects and budgets
35. The capital works programmes have been geo-spatially mapped to indicate the location of projects within a local board area.
36. Attachment C demonstrates the year of the three-year work programme that capital budget is proposed to be allocated to specific projects and indicates the main funding source for each project.
37. Activity budgets for capital programme delivery are estimates only, as costs are subject to change and to be refined as the activity / project progresses through the design and delivery process. Greater clarity will be determined once activity details are defined with the work programme updated accordingly.
38. Some projects are unable to be mapped as they reference multiple locations, or the work locations are yet to be determined.
Risk Adjusted Programme
39. The Risk Adjusted Programme was implemented in 2019 and is designed to mitigate risk so that the total budget is delivered.
40. Several capex projects in the 2022/2023 and 2023/2024 work programme have been identified as part of the Risk Adjusted Programme as highlighted in Attachment A.
41. Approval is sought for the commencement of these projects in the 2021/2022 financial year, so that they can replace delays in projects that may not be delivered for unforeseen reasons.
Regionally funded activities included in the local board work programme
42. There are activities, from the Coastal Renewals, Landslide Prevention and Local Parks and Sports Field Development and the Natural Environment Targeted Rate budgets, which are funded regionally and will be approved by the Governing Body after 30 June 2021.
43. These activities are included in the work programme because the local board has decision-making responsibility for that activity within the parameters set by the Governing Body, which include project location, scope and budget.
44. These activities may be conducted by a number of teams, including within the Customer and Community Services and Infrastructure and Environmental Services directorates.
45. The local board can provide feedback on the activities outlined in Attachment D. This feedback will be presented to the relevant Governing Body committee when they consider regionally funded activities.
Process for changes to the approved work programme
46. Staff will provide progress updates to and seek approval from the local board if there are any projects that require scope, budget or timing changes throughout the financial year, or if activities need to be cancelled or added to the work programme.
47. The work programme includes community leases. Straight-forward lease renewals without variations will be processed in accordance with agreed delegations through a written memo. Expired and more complex community leases will be workshopped with the local board and reported to a business meeting.
48. For a change to the work programme considered to be minor, in that it does not substantially alter the approved work programme, staff will workshop this with the local board and then implement the change. A description of the change will be included in the following round of quarterly reporting.
49. A change to the work programme that is considered substantial, will be presented to the local board at a business meeting for approval.
Tauākī whakaaweawe āhuarangi
Climate impact statement
50. In June 2019, council declared a climate emergency and in response to this, council adopted the Te Tāruke-ā-Tāwhiri: Auckland’s Climate Plan in July 2020.
51. Each activity in the work programme is assessed to identify whether it will have a positive, negative, or neutral impact on greenhouse gas emissions and impact on resilience to climate change.
52. To deliver on climate goals, Te Tāruke-ā-Tāwhiri includes eight priorities for action:
· natural environment
· built environment
· transport
· economy
· communities and coast
· food
· Te Puāwaitanga ō te Tātai
· energy and industry.
53. The work programme indicates which of these priorities each activity responds to.
54. Attachment E outlines the activities in the work programme identified to have a positive and negative climate change impact.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
55. The work programme is presented at a directorate level which reflects the integrated approach to developing the activities between the directorate’s departments of:
· Connected Communities
· Community Facilities
· Community and Social Innovation
· Parks, Sports and Recreation
· Regional Service Planning, Investment and Partnerships.
56. The Customer and Community Services work programme was developed through a collaborative approach by representatives from across council departments, directorates and Council Controlled Organisations. The integrated team developed the proposed work programme with the local board through a series of workshops.
57. Some of the activities in the work programme are delivered collaboratively between directorates, for example the Kauri Dieback programme
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
58. Delivery of the work programme is the local board’s implementation of outcomes and objectives in the Manurewa Local Board Plan 2020.
59. The feedback received from the local board through a series of workshops from December 2020 to May 2021 has informed the proposed Customer and Community Services work programme in Attachment A.
Tauākī whakaaweawe Māori
Māori impact statement
60. Consideration is given to how the provision of services, facilities and open spaces can support the aspirations of Māori, promote community relationships, connect to the natural environment, and foster holistic wellbeing of whānau, hapu and iwi Māori.
61. In the local board area, 26 per cent of the total population identify as Māori.
62. The work programme includes activities that will have an impact on a service, facility, or location of significance to Māori. In these situations, appropriate and meaningful engagement and consultation will be undertaken, including to meet our obligations under Te Tiriti o Waitangi – Treaty of Waitangi.
63. Activities identified as delivering a moderate and high level of Māori outcomes are presented as Attachment B.
Ngā ritenga ā-pūtea
Financial implications
64. The financial implications of the COVID-19 pandemic have resulted in a reduced renewals budget per local board and significantly reduced development budgets for growth.
65. Each activity line has a budget allocation for delivery in one or more of the financial years (e.g., 2021/2022, 2022/2023 and 2023/2024). Where activity lines show a zero-dollar budget, this reflects implementation costs met through staff salary or other funding sources.
66. The 2021/2022 activities recommended for local board approval can be accommodated within their draft 2021/2022 budgets.
67. The budgets allocated to activities in the financial years 2022/2023 and 2023/2024 are indicative only and are subject to change due to any increased costs, inflation or reduction to the overall available annual council budget that may occur.
68. Table 3 summarises the budget sources for each work programme financial year.
Table 3: Manurewa Local Board budget allocation
Local budgets |
2021/2022 (approve) |
2022/2023 (approve in principle) |
2023/2024 (approve in principle) |
Opex: Locally Driven Initiatives (LDI) |
$1,278,367 |
$1,377,725 |
$1,374,025 |
Opex: Asset Based Services (ABS) |
$12,068,571 |
$12,068,571 |
$12,068,571 |
Capex: Local Asset Renewals - Budget (ABS) |
$2,016,916 |
$1,496,558 |
$6,373,561 |
Capex: Local Asset Renewals - Proposed Allocation (ABS) |
$2,016,916 |
$1,496,558 |
$6,373,561 |
Capex: Local Asset Renewals - Unallocated budget (ABS) |
$0 |
$0 |
$0 |
Capex: Locally Driven Initiatives (LDI) – Budget |
$194,000 |
$194,000 |
$194,000 |
Capex: Locally Driven Initiatives (LDI) - Proposed Allocation |
$194,000 |
$194,000 |
$194,000 |
Capex: Locally Driven Initiatives (LDI) - Unallocated budget |
$0 |
$0 |
$0 |
Capex: Growth projects Allocation |
$0 |
$0 |
$0 |
Capex: Coastal projects Allocation |
$224,272 |
$0 |
$0 |
Capex: Landslide Prevention projects Allocation |
$106,895 |
$145,667 |
$0 |
Capex: Specific Purpose Funding - Allocation |
$2,173,789 |
$0 |
$0 |
Capex: External Funding Allocation |
$0 |
$0 |
$0 |
Capex: One Local Initiative |
$0 |
$0 |
$0 |
Capex: Long-term Plan discrete |
$0 |
$256,529 |
$2,901,231 |
Capex: Natural Environment Targeted Rate |
$0 |
$0 |
$0 |
69. The proposed budgets are based on the anticipated budget allocations from the Long-term Plan 2021-2031.
70. Any 2020/2021 capex budget unspent on 30 June 2021 will be assessed for carry-forward to the 2021/2022 work programme. Carry forwards will be added to the work programme as separate activity lines.
71. Where an activity is cancelled or no longer required, the local board can reallocate the budget to an existing work programme activity or create a new activity within that financial year.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
72. If approval of the Customer and Community Services work programme is not obtained, there is significant risk that the activities within it will be delayed or not delivered.
73. Table 4 outlines the key risks and mitigations associated with the work programme.
Table 4: risks and mitigations
Risk |
Mitigation |
Non-delivery, time delays and budget overspend of activities that are managed through the work programme. |
Having agreed processes to amend the work programme if activities need to be changed or cancelled. Utilising the Risk Adjusted Programme to progress those activities identified as ready to proceed under the Risk Adjusted Programme at the beginning of the financial year. |
Unknown risks associated with trialling a new activity for the first year. |
Risks and mitigations for new activity lines are considered during the scoping phase, continually assessed and reported to the local board. |
The COVID-19 pandemic could have a negative impact on the progress of the work programme as some activities cannot be delivered if there is an increase in an alert level. |
Development of the work programme has included consideration for all activities regarding potential impacts on delivery in the event of alert level changes. Some activities may be delayed but still deliverable within the agreed timeframes. Where activities need to be cancelled the local board can reallocate budget to other activities. |
74. The majority of activities in the work programme are ongoing and annually occurring. Risks associated with these activities have been identified in previous years and are managed on an ongoing basis.
75. Other risks may also exist, including with respect to the health, safety and wellbeing of council staff. Work programmes may also need to be adjusted where these risks exist and cannot be safely mitigated via control measures.
Ngā koringa ā-muri
Next steps
76. Delivery of the work programme will start following approval by the local board and continue until 30 June 2022, with progress reported to the local board on a quarterly basis.
77. Regional projects will commence after approval by the Governing Body in July 2021. The local board will receive the first quarter report in November 2021.
78. Where the work programme identifies further decisions and milestones for activities, these will be brought to the local board when appropriate.
Attachments
No. |
Title |
Page |
a⇩ |
Customer and Community Services Work Programme 2021/2022 |
115 |
b⇩ |
Manurewa Māori Outcomes |
151 |
c⇩ |
Manurewa Map |
153 |
d⇩ |
Manurewa - Regional Projects |
155 |
e⇩ |
Manurewa Climate Impacts |
157 |
Ngā kaihaina
Signatories
Authors |
Justine Haves - General Manager Service Strategy and Integration Mace Ward - General Manager Parks, Sports and Recreation Mirla Edmundson - General Manager Libraries & Information Gael Surgenor - GM - Southern Initiative Taryn Crewe - General Manager Community Facilities |
Authorisers |
Claudia Wyss - Director Customer and Community Services Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Approval of the 2021/2022 Manurewa Local Board Infrastructure and Environmental Services Work Programme
File No.: CP2021/07315
Te take mō te pūrongo
Purpose of the report
1. To approve the 2021/2022 Manurewa Local Board’s Infrastructure and Environmental Services work programme and approve in principle the 2022/2023 and 2023/2024 work programmes.
Whakarāpopototanga matua
Executive summary
2. This report presents the Manurewa Local Board’s Infrastructure and Environmental Services work programme and associated budgets for approval for the 2021/2022 financial year, and for approval in principle for the subsequent two financial years, 2022/2023 and 2023/2024 (see Attachment A).
3. The work programme responds to the outcomes and objectives identified in the Manurewa Local Board Plan 2020.
4. The work programme has been developed through a series of workshops between December 2020 and May 2021, where the local board provided feedback to staff on programme and activity prioritisation.
5. The local board indicated its support for the following activities to be delivered in 2021/2022, with budgets as listed below:
· Industrial Pollution Prevention Programme – Wiri - $32,000
· Awa restoration programme - $45,000
· Pest Free Urban South – $60,000
· Auckland Teaching Gardens – rainwater tanks and irrigation programme - $7,100
· Manurewa waste minimisation - $50,000
· Papakura Stream landowner engagement programme - $14,600
· Papakura Stream maintenance - $3,000
· Manukau Harbour Forum - $7,400.
6. The proposed work programme has a total value of $219,100, which can be funded from within the board’s draft locally driven initiatives (LDI) budget for the 2021/2022 financial year. Approval in principle is also being sought for activities in the 2022/2023 and 2023/2024 financial years.
7. The indicative programmes and budgets for 2022/2023 and 2023/2024 are subject to change and will be confirmed on an annual basis through the approval of the respective work programmes.
8. Updates on the delivery of this work programme will be provided through the board’s quarterly performance reports.
Recommendation/s
That the Manurewa Local Board:
a) approve its 2021/2022 Infrastructure and Environmental Services work programme and associated budgets, as summarised in the table below (Attachment A to the agenda report):
Activity name |
2021/2022 budget for approval |
Industrial Pollution Prevention Programme – Wiri |
$32,000 |
Awa restoration programme |
$45,000 |
Pest Free Urban South |
$60,000 |
Auckland Teaching Gardens – rainwater tanks and irrigation programme |
$7,100 |
Manurewa waste minimisation |
$50,000 |
Papakura Stream landowner engagement programme |
$14,600 |
Papakura Stream maintenance |
$3,000 |
Manukau Harbour Forum |
$7,400 |
Total |
$219,100 |
b) approve in principle the 2022/2023 and 2023/2024 Infrastructure and Environmental Services work programmes (Attachment A to the agenda report)
c) note that the indicative programmes and budgets for 2022/2023 and 2023/2024 are subject to change, and will be confirmed on an annual basis through the approval of the respective work programmes.
Horopaki
Context
9. Each year, the local board decides which activities to allocate its annual budget toward through a series of workshops. The local board feedback in these workshops has informed the development of the Infrastructure and Environmental Services work programme (Attachment A).
10. The proposed work programme responds to the outcomes and objectives identified in the Manurewa Local Board Plan 2020. The specific objectives reflected in the work programme are:
· the water quality of our harbours and waterways is steadily improving
· our natural areas are pest free and regenerating to enhance biodiversity and ecosystems
· we are a low-carbon community with zero waste.
11. The following adopted strategies and plans also guided the development of the work programme:
· Te Mahere Whakahaere me te Whakaiti Tukunga Para i Tāmaki Makaurau / Auckland Waste Management and Minimisation Plan 2018
· National Policy Statement for Freshwater Management 2020
· Mahere ā-Rohe Whakahaere Kaupapa Koiora Orotā mō Tāmaki Makaurau / Regional Pest Management Plan 2020-2030.
12. The development of the work programme has been informed by staff assessments and identification of local environmental priority areas, and feedback received from the local board at workshops.
Tātaritanga me ngā tohutohu
Analysis and advice
13. The proposed work programme is made up of activities continuing from previous financial years, including annually occurring events or ongoing programmes. It also includes new initiatives supported by the local board. These programmes contribute towards the delivery of the Manurewa Local Board Plan 2020 environmental objectives, as detailed above.
14. The work programme (Attachment A) provides a three-year view that demonstrates the phasing or continuation of programme delivery over the 2021/2022, 2022/2023 and 2023/2024 financial years.
15. This report seeks local board approval for budgets and activities in year one of the three-year work programme (2021/2022), and approval in principle for 2022/2023 and 2023/2024.
16. Approving in principle does not commit the local board to funding in future years, as the budget for years two and three will still need to be approved on an annual basis. However, approval in principle will help staff, contractors and community groups to plan activities and resourcing in the longer-term.
17. Budgets for years two and three are subject to change, as the programmes are further refined or if local board priorities shift.
18. The proposed activities for delivery as part of the board’s 2021/2022 Infrastructure and Environmental Services work programme are detailed below, alongside indicative plans and budgets for the 2022/2023 and 2023/2024 financial years:
Industrial Pollution Prevention Programme – Wiri – $32,000
19. The board has indicated it would like to invest in the Industrial Pollution Prevention Programme in the 2021/2022 financial year. The board previously funded this programme in the 2016/2017 financial year. Staff recommend that the board allocate $32,000 towards this programme in 2021/2022.
20. This programme is primarily educational and informs industry about the impacts their activities may be having on local waterways. The programme includes a site inspection and discussion with business owners about potential issues around pollution as well as waste minimisation techniques and spill training. If changes are recommended, a report is sent to the business and a follow up is conducted (depending on budget, this is either a phone call or site visit).
21. The programme involves a GIS mapping exercise to ensure that commercial businesses understand the stormwater network connections in relation to local waterways. This year the programme will focus in the Wiri industrial area, which was originally covered in October 2015 and March 2016. Due to extensive growth and business changes, a second programme is recommended to educate new businesses and follow up on existing practices.
22. Approval in principle is also sought for $32,000 towards this programme in 2022/2023.
Awa restoration programme – $45,000
23. The board has indicated it would like to continue to support community-led restoration in the stream adjacent to the Glenveagh Park Reserve in the 2021/2022 financial year. The board allocated $15,000 to this programme in the 2020/2021 financial year, with an additional $25,000 reallocated from the community-led restoration of the Mahia Road stream project. Staff recommend that the board allocate $45,000 towards the continuation and expansion of this programme in 2021/2022.
24. This programme aims to connect local residents to the waterway and raise awareness around the impacts of litter and other pollutants on the health of the stream and Manukau Harbour.
25. In the 2021/2022 financial year, water testing will be facilitated by Te Pu-a-nga Maara, with local schools invited to participate in sampling and analysis using Te Kete Waiora. Planting and weed control will commence at Glenveagh Park Drive Reserve. Restoration and water quality testing will continue in years two and three.
26. Approval in principle is also sought for $45,000 towards this programme in 2022/2023 and $50,000 in 2023/2024.
Pest Free Urban South – $60,000
27. The board has indicated it would like to support a new programme in 2021/2022 to coordinate pest free initiatives across the local board area. Staff recommend that the board allocate $60,000 towards this programme in 2021/2022.
28. A pest free coordinator will be recruited to build momentum for the Pest Free Auckland vision across the Manurewa Local Board area. The coordinator will connect with groups in the community to expand the Pest Free Urban South programme (currently underway in Māngere-Ōtāhuhu and Ōtara-Papatoetoe) to Manurewa. They will also attend local events and facilitate hui on how to expand Pest Free initiatives and support local groups undertaking pest control.
29. The programme will expand community action through education and assistance to reduce pest plants and animals in the urban south environment. In addition to the coordinator, the budget will provide funding for a moth plant competition, resources such as traps and bait, and strategic planning.
30. Approval in principle is also sought for $40,000 towards this programme in 2022/2023 and $50,000 in 2023/2024, the reduction in budget is in anticipation that the same coordinator will continue, and therefore additional budget for training will not be needed.
Auckland Teaching Gardens – rainwater tanks and irrigation programme – $7,100
31. The board has indicated it would like to support a new programme in 2021/2022 to fund the installation of two 5,000 litre rainwater tanks and irrigation systems at the 'Maich' teaching garden site in Manurewa. Staff recommend that the board allocate $7,100 towards this programme in 2021/2022.
32. Teaching gardens provide the community with access to low cost, nutritious homegrown produce in an inclusive learning environment. The tanks will capture rainwater from rooftops which will be used for food cultivation. This will result in:
· reduced loads on the stormwater network (reducing contaminants flowing into freshwater and marine environments)
· increased community water storage (reducing demand for reticulated water at peak times)
· increased community resilience and emergency preparedness.
33. The tanks will model rainwater storage and irrigation systems that could be applied at students' homes or organisations.
34. This is a one-off programme for the 2021/2022 financial year.
Manurewa waste minimisation – $50,000
35. The board has indicated it would like to continue to fund community waste minimisation in the 2021/2022 financial year. The board has supported this programme since 2017 and allocated $45,000 towards this programme in the 2020/2021 financial year.
36. The 2021/2022 programme will build on previous local board investment and fund local waste wise champions who will support Manurewa residents to sort and reduce their waste, build community pride, and develop and implement community-led strategies to prevent illegal dumping. The programme will focus on providing local jobs for local people.
37. There will be three components to the programme:
· hiring and supporting waste wise champions to take action to reduce illegal dumping and support residents to manage and minimise their waste
· designing, installing, monitoring and evaluating the effectiveness of signs in illegal dumping hotspots
· storytelling, promotion, and marketing of good news stories and waste wise champion / pride kits to catalyse behaviour change. The story-telling campaign will be refined and expanded in years two and three, and there will be a focus on expanding the impact of the waste champions.
38. Approval in principle is also sought for $50,000 towards this programme in 2022/2023 and 2023/2024.
Papakura Stream landowner engagement programme – $14,600
39. The board has indicated it would like to continue to support landowner engagement along the Papakura Stream in the 2021/2022 financial year. This will be the second year of this programme, which the board allocated $5,000 towards in the 2020/2021 financial year. Staff recommend that the board allocate $14,600 towards the continuation of this programme in 2021/2022.
40. The Papakura Stream catchment is shared between the Manurewa, Papakura, and Franklin Local Boards, and spans the Hunua Ranges to the Manukau Harbour. This programme seeks to restore five kilometres of the Papakura Stream over a three-year period. The Manurewa, Papakura, and Franklin Local Boards have each indicated that they would like to contribute equal funding for the programme (except Papakura Local Board which are contributing $5,900 extra for maintenance of existing planting in the Papakura Local Board area funded by the local board in previous years).
41. In the 2020/2021 financial year local board funding was used to conduct a landowner engagement survey. In 2021/2022 funding will be used for purchasing plants, community planting day events (two on public and four on private land), four community clean-up events, and landowner and business engagement.
42. Additional funding sources for this programme will be sought by Conservation Volunteers New Zealand which will contribute to stock exclusion in the rural portion of the Papakura Stream catchment. Trees for Survival will provide trees for landowners who expressed interest in stream restoration in surveys carried out.
43. Approval in principle is also sought from each of these local boards for $13,000 towards this programme in 2022/2023 and $14,000 in 2023/2024. In 2022/2023 and 2023/2024, planting, clean-ups, and engagement will continue.
Papakura Stream maintenance – $3,000
44. The board has indicated it would like to continue to support the Papakura Stream restoration maintenance programme in the 2021/2022 financial year.
45. The board has supported this programme since 2018/2019 and allocated $7,500 towards this initiative in the 2020/2021 financial year to undertake planting in this area. This budget will support weed control and maintenance in areas previously planted along the Papakura Stream within Frangipani and Holmes Road reserves.
46. In 2021/2022, maintenance is required for plantings undertaken by the community between 2018 and 2020. This includes a third year of maintenance for Frangipani Reserve and second year of maintenance for Holmes Road Reserve planting.
47. Approval in principle is also sought for $3,000 towards this programme in 2022/2023.
Manukau Harbour Forum - $7,400
48. The board has indicated that it would like to continue to fund the Manukau Harbour Forum in the 2021/2022 financial year. The board is one of nine local boards who make up the Manukau Harbour Forum (Franklin, Māngere-Ōtāhuhu, Manurewa, Maungakiekie-Tāmaki, Ōtara-Papatoetoe, Papakura, Puketāpapa, Waitākere Ranges, and Whau Local Boards). These local boards border the Manukau Harbour and have an interest in protecting and restoring the mauri of the harbour.
49. In 2020/2021, each of the member local boards provided $1,750 to co-fund the Manukau Harbour Forum and $43,650 was carried forward from the 2019/2020 financial year. This was allocated to several activities including a Manukau Harbour Forum coordinator, a youth sustainability wānanga, and a youth freshwater monitoring training programme.
50. Staff recommend that each of the nine member boards contribute a further $7,400 each towards the forum in the 2021/2022 financial year, allowing a total budget of $66,600. Staff recommend that this funding supports:
· a Manukau Harbour Forum coordinator to assist with the delivery of the forum’s goals ($45,000)
· funding for a youth sustainability wānanga which would involve around 50 students from all member local board areas to develop leadership skills, sustainability knowledge, and collaborative action programmes ($15,000)
· funding to develop a communications plan for the Manukau Harbour Forum ($6,600).
51. Approval in principle is also sought for $8,000 towards this programme from each member local board in both 2022/2023 and 2023/2024.
Tauākī whakaaweawe āhuarangi
Climate impact statement
52. In June 2019 Auckland Council declared a climate emergency and in response to this the council adopted the Te Tāruke-ā-Tāwhiri: Auckland’s Climate Plan in July 2020.
53. Each activity in the work programme is assessed to identify whether it will have an impact on greenhouse gas emissions and contributing towards climate change adaptation.
54. Table 1 outlines the key activities in the 2021/2022 work programme that have an impact on greenhouse gas emissions or contribute towards climate change adaptation.
Table 1: Climate impact assessment of proposed activities
Activity name |
Climate impact |
Industrial Pollution Prevention Programme – Wiri |
These programmes seek to restore freshwater ecosystems and reduce pollution into the Manukau Harbour by engaging with landowners, industry, and community members around pollution reduction and restoration. Freshwater ecosystems provide many ecosystem services such as flood mitigation, habitat for native biodiversity and carbon sequestration (riparian planting). These services are enhanced when the ecosystems are enhanced. |
Awa restoration programme |
|
Papakura Stream maintenance |
|
Papakura Stream landowner engagement programme |
|
Manukau Harbour Forum |
|
Pest Free Urban South |
Management of exotic species’ impacts is one of the main ways in which we can improve resilience of Auckland’s biodiversity to climate change. |
Auckland Teaching Gardens – rainwater tanks and irrigation programme |
Improving community resilience to the impact of climate change on increased periods of drought will be a direct outcome of this programme. Greenhouse gas reductions will be a secondary outcome (reducing demand on supplied water for the gardens reduces Auckland Teaching Gardens’ indirect emissions related to the supply of reticulated water). |
Manurewa waste minimisation |
This programme seeks to reduce waste and therefore reduce greenhouse gasses which are produced when waste is sent to landfill. |
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
55. The work programme was developed through a collaborative approach by operational council departments, with each department represented in the integrated team that presented the draft work programme to the local board at a series of workshops.
56. In particular, the attached Infrastructure and Environmental Services work programme reflects the integrated activities developed by Environmental Services, Healthy Waters and Waste Solutions.
57. Healthy Waters will coordinate with Natural Environment Strategy and Environmental Services staff on work related to the Manukau Harbour Forum, and with Parks, Sports, and Recreation on the Awa restoration programme and the Auckland Teaching Gardens rainwater tanks and irrigation programme.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
58. The programmes proposed for inclusion in the board’s Infrastructure and Environmental Services work programme will have positive environmental outcomes across the Manurewa Local Board area. Particular focus areas for the 2021/2022 work programme include Wiri, Homai, Weymouth, and along the Papakura Stream.
59. The programmes noted above align with the local board plan outcome ‘our natural environment is valued, protected, and enhanced’. The proposed work programme has been considered by the local board in a series of workshops from December 2020 to May 2021. The views expressed by local board members during the workshops have informed the recommended work programme.
Tauākī whakaaweawe Māori
Māori impact statement
60. Auckland Council is committed to meeting its responsibilities under Te Tiriti o Waitangi and its broader obligations to Māori.
61. The work programme includes activities that aim to deliver outcomes for and with Māori, in alignment with the strategic priority areas outlined in Kia ora Tāmaki Makaurau (Auckland Council’s Māori Outcome Framework). Progress on how the activities are achieving these outcomes will be reported to the local board on a quarterly basis.
62. Staff recognise that environmental management, water quality and land management have integral links with the mauri of the environment and concepts of kaitiakitanga.
63. Table 2 outlines the activities in the 2021/2022 work programme that contribute towards the delivery of specific Māori outcomes.
Table 2: Māori outcome delivery through proposed activities
Activity name |
Māori outcome |
Māori outcome description |
Industrial Pollution Prevention Programme – Wiri |
Kaitiakitanga |
This programme was designed in collaboration with mana whenua in 2013. Through encouraging businesses to protect waterways, it contributes to increasing the mauri of local awa and moana, a key issue of significance to mana whenua. |
Awa restoration programme |
Kaitiakitanga and realising rangatahi potential |
Te Pu-a-nga Maara is a collective of rangatahi from Makaurau, Papatūānuku and Manurewa Marae who have developed Te Kete Waiora – a water testing kit that can be utilised in both fresh and saline environments. Te Kura Kaupapa Māori o Manurewa will be one of the schools invited to participate in the water testing programme. |
Pest Free Urban South |
Kaitiakitanga |
The coordinator will reach out to local rangatahi Māori to be engaged in conservation activities, and will also be advised to identify key opportunities to work with mana whenua and mataawaka groups. Staff will reach out to local mana whenua for procurement of the coordinator. |
Auckland Teaching Gardens – rainwater tanks and irrigation programme |
Kaitiakitanga |
Auckland Teaching Gardens are planning to develop relationships and collaboration with mana whenua and the wider Māori community where they have teaching garden sites. This will be a part of Auckland Teaching Gardens’ long term development strategy and is not yet in place. For example, one future outcome would be to have mana whenua representation on the Auckland Teaching Gardens board. |
Manurewa waste minimisation |
Kaitiakitanga |
Consultation and collaboration with mataawaka in Manurewa will be achieved through participants and employees of the programme, many of whom are Māori. |
Papakura Stream landowner engagement programme |
Kaitiakitanga |
The contractor acknowledges iwi as kaitiaki of Auckland's natural world and the importance of their involvement in restoration and protection of our natural taonga. They strive to connect with iwi on this initiative and will actively seek opportunities to collaborate. |
Manukau Harbour Forum |
Kaitiakitanga and realising rangatahi potential |
Māori youth will be involved in the youth sustainability wānanga and are supported to develop and implement programmes relevant to them and their communities. The wānanga also engages with kaumātua from Makaurau Marae to provide advice and mātauranga Māori that informs programme delivery. During the wānanga, te reo Māori is actively promoted, as a key component of programme delivery. |
64. Where aspects of the proposed work programme are anticipated to have a significant impact on activity of importance to Māori then appropriate engagement will be undertaken.
Ngā ritenga ā-pūtea
Financial implications
65. The proposed environment work programme for 2021/2022 totals to $219,100 of the board’s locally driven initiatives (LDI) operational budget. This amount can be accommodated within the board’s total draft budget for 2021/2022.
66. Budgets for activities in the 2022/2023 and 2023/2024 financial years are indicative. While local board approval in principle is being sought for these future years through this report, formal approval will be sought on an annual basis, once budgets and programme costs are confirmed.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
67. If the proposed Infrastructure and Environmental Services work programme is not approved before the start of the financial year, there is a risk that activities may be delayed or not delivered within the financial year.
68. Risks and mitigations for new activity lines were considered during the scoping phase. There may be risks associated with trialling a new activity for the first year. These will be continually assessed and reported to the local board.
69. The COVID-19 pandemic could have a further negative impact on the delivery local board work programmes if the COVID-19 Alert Level changes (New Zealand’s 4-level Alert System specifies measures to be taken against COVID-19 at each level). The deliverability of some activities will decrease if there is an increase to the COVID-19 Alert Level. Drought conditions may also lead to delays in any programmes which involve planting.
70. Resourcing of the work programme is based on current staff capacity within departments. Therefore, changes to staff capacity may also have an impact on work programme delivery.
71. Table 3 shows the key risks associated with activities in the proposed 2021/2022 work programme, as well as proposed mitigations.
Table 3: Key risks and mitigations for activities
Activity name |
Risk |
Mitigation |
Rating after mitigation |
Industrial Pollution Prevention Programme – Wiri |
This programme is dependent on the businesses being willing to cooperate. Success is measured by the number of recommendations that have been implemented, so a risk of no implementations does exist. |
Enough businesses have been identified to ensure that there are sufficient businesses to engage with if not all are interested. There has been high uptake from businesses in previous financial years. |
Low |
Awa restoration programme |
There is a risk that the contractor may be unavailable. |
Staff will engage early to ensure that contractors are available. |
Low |
Pest Free Urban South |
Unable to obtain a suitable contractor for the pest free coordinator. |
Several options have already been identified, therefore this is considered a low risk. |
Low |
Community change in demand and values. For instance, not supporting the use of herbicide in their area. |
This can be mitigated by identifying alternative options.
|
Low
|
|
School programs too busy to include or not interested. |
To mitigate this, Natural Environment Delivery, Sustainable Schools, Healthy Waters and Parks staff will work in co-partnership to deliver the Pest Free Urban South vision. |
Low |
|
Auckland Teaching Gardens – rainwater tanks and irrigation programme |
Delivery will be dependent on rainwater tank supplier timelines (and any delays and timeframes they require for order and delivery after payment received). |
Contractors will be procured based on track record and therefore this is considered a low risk. |
Low |
Manurewa waste minimisation |
There is a risk of miscommunication between groups involved in delivery, which could impact the efficacy of the programme. |
This will be mitigated by the programme lead attending meetings and ensuring members of each team have a clear understanding of their role and are working towards a shared kaupapa. |
Low
|
There is a risk of signage being vandalised and taken down. |
This will be mitigated through close monitoring and working with the waste solutions team. |
Medium
|
|
Papakura Stream landowner engagement programme |
There is a risk of the identified contractor being unavailable. To mitigate this staff will engage early. |
Staff have already liaised with the contractor who is available and committed to doing the work on this programme. |
Low |
Papakura Stream maintenance |
There is a risk of contractor unavailability to deliver programme. |
The contractor has been engaged with in advance and is available. |
Low |
Manukau Harbour Forum |
This programme is dependent on the sourcing of a suitable contractor to coordinate the forum and mana whenua contractor to co-deliver the wānanga.
|
The mana whenua contractor has worked on the programme for the past two years and has indicated they can continue to support the wānanga, subject to the forum’s agreement to continue to fund the programme. Several options have been identified for the Manukau Harbour Forum coordinator and therefore not finding a suitable contractor is considered a low risk. |
Low
|
72. Where a work programme activity cannot be completed on time or to budget, due to unforeseen circumstances, this will be signalled to the local board at the earliest opportunity.
Ngā koringa ā-muri
Next steps
73. Delivery of the activity in the approved work programme will commence once approved and continue until 30 June 2022. Activity progress will be reported to the local board on a quarterly basis.
74. Where the work programme identifies further decisions and milestones for each activity, these will be brought to the local board when appropriate.
Attachments
No. |
Title |
Page |
a⇩ |
Infrastructure and Environmental Services work programme Manurewa 2021/2022 |
173 |
Ngā kaihaina
Signatories
Author |
Prasanthi Cottingham - Relationship Coordinator |
Authorisers |
Barry Potter - Director Infrastructure and Environmental Services Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Approval of the Manurewa Local Board Auckland Unlimited work programme 2021/2022
File No.: CP2021/07841
Te take mō te pūrongo
Purpose of the report
1. To approve the Manurewa Local Board Auckland Unlimited (AUL) work programme 2021/2022.
Whakarāpopototanga matua
Executive summary
2. This report presents the board’s AUL work programme and associated budgets for approval for delivery within the 2021/2022 financial year (see Attachment A).
3. The work programme responds to the following outcomes and objectives that the local board has identified in the Manurewa Local Board Plan 2020:
· Our local economy continues to grow
· Young people have the skills and training needed for quality, sustainable employment.
4. The board provided feedback to staff on the projects it would like to fund in a series of workshops. The board indicated its support for the following projects, with budgets as listed below:
· Town Centre Steering Group ($100,000)
· Local Small Business Mentors Programme ($11,000)
· Young Enterprise Scheme Kick Start Days Sponsorship ($2,000)
· Rebel Business School, formerly Pop-Up Business School ($12,500).
5. The proposed work programme has a total value of $125,500, which can be funded from within the board’s draft locally driven initiatives (LDI) budget for the 2021/2022 financial year.
6. Updates on the delivery of this work programme will be provided through the board’s quarterly performance reports.
Recommendation/s
That the Manurewa Local Board:
a) approve the AUL work programme 2021/2022 (Attachment A to the agenda report).
Horopaki
Context
7. Each year, the local board decides which activities to allocate its annual budget toward, through a series of workshops. The local board feedback in these workshops have informed the work programme.
8. The work programme responds to the outcomes and objectives that the local board identified in the Manurewa Local Board Plan 2020. The specific outcomes that are reflected in the work programme are:
· Our local economy continues to grow
· Young people have the skills and training needed for quality, sustainable employment.
Tātaritanga me ngā tohutohu
Analysis and advice
9. The proposed activities for delivery as part of the board’s AUL work programme 2021/2022 are detailed below. See Attachment A for further detail.
Town Centre Steering Group – $100,000
10. The Manurewa Local Board Plan (2020) identifies the local board’s wish to continue working with Manurewa Business Association and the Town Centre Steering Group on activities that create interest, promote a sense of safety and bring more people to the town centres.
11. The Town Centre Steering Group (steering group) was established in 2015. The steering group is made up of the Manurewa Local Board representatives, Auckland Council group staff, the Manurewa Business Association, and New Zealand Police. It has an independent chair and draws upon consultant support as required.
12. In recognition of the wider role of the steering group in supporting the town centre revitalisation implementation, the funding allocation will enable the continuation of the following activities to help support the delivery of local economic outcomes:
· Facilitation and support of the Manurewa Town Centre Steering Group ($25,000): Meeting the costs of continuing the steering group and associated consultant support and in addition the delivery of key projects identified by the Steering Group in the forthcoming year.
· Support for urban design work ($15,000): meeting the costs of consultant support to ensure that the urban design opportunities in the local board area being investigated and outcomes defined.
· Support Manurewa Business Improvement District to implement their strategic plan ($50,000): An implementation plan will be developed by Manurewa Business Improvement District to identify how the BID will implement their strategic plan. This funding is dependent on the completion of the implementation plan. Once completed the steering group can recommend to the local board activities that they may wish to support and provide funding support from this allocation of $50,000. To ensure the funds will be spent in the financial year, an indication of what activities could be supported will need to be made by December 2021 to enable the local board to agree any funding.
· Outcomes identified by other work in surrounding areas ($10,000): Exact projects are to be identified but the opex budget can be used to fund studies or research that will support the growth of the local board area, some of which may be identified through the current Integrated Area Plan for the Manurewa-Takanini-Papakura corridor.
13. Outside the continuation of support for the steering group the full scope of projects and initiatives will be drafted with the input of the local board and steering group to ensure they deliver local economic outcomes.
Local Business Mentors - $11,000
14. The Regional Business Partnership Programme (RBP) delivered by Auckland Unlimited has, through the COVID-19 Business Advisory Fund, provided almost $13 million of help to over 5000 businesses across the Auckland region. The COVID-19 fund has now been exhausted. Many Small to Medium Sized Enterprises (SMEs) across the region especially smaller businesses are not now able to access support via the RBP programme and subsequent research by AUL has shown that there is still significant demand for support.
15. A total of 167 businesses in Manurewa accessed the RBP over the course of 2020. In the six months, July – December 2020, 2 per cent of subscribers to the RBP were from Manurewa, an area home to 2.5 per cent of the region’s businesses. All businesses were eligible under the COVID Response package but that won’t be the case going forward and with the average business size in Manurewa having 5.3 employees, many businesses will now become ineligible.
16. There are 5,148 businesses in Manurewa. Almost 4,400 (87 per cent) of the area’s businesses have five employees or less. These smaller businesses have less access to mainstream government business support and fewer resources to put towards paying for help to grow their business.
17. The Small Business Mentoring service provides up to 12 months of confidential, one-on-one assistance for small business owners who want to grow or need help to solve specific business challenges. Business mentors have experience and empathy for small business, offering guidance, a sounding board, challenging their thinking, and providing them with an independent and fresh perspective.
18. Auckland Unlimited (AUL) will contract Business Mentor New Zealand to provide the service to businesses from the local board area. AUL Business Advisors can make referrals to businesses that contact AUL looking for support for whom the initiative is suited. Also, AUL is able to promote the opportunity to businesses, for example, via email to Manurewa businesses that we hold on our database of 20,000 businesses. In addition, AUL will seek to utilise the local board’s own channels to their community.
19. Business Mentors NZ or AUL Business Advisors will be able to assess whether a business will benefit from the support being made available. Any recruitment programme would be strengthened by local business associations’ support to reach their membership.
Rebel Business School - $12,500
20. The Rebel Business School (previously known as Pop-Up Business School) provides a free 10-day business school to provide education and support for local people interested in starting their own business. Examples elsewhere have had positive results in terms of the numbers of businesses established. By supporting local residents, through the provision of entrepreneurial training, the generation of local businesses will be increased, and local employment opportunities provided. A contribution from the Ministry of Social Development is also being made. AUL will manage the contract and provide logistical support on behalf of the Manurewa Local Board.
Young Enterprise Scheme Kick Start Days Sponsorship- $2,000
21. Auckland Business Chamber, on behalf of the Young Enterprise Trust, delivers the Young Enterprise Scheme (YES) in Auckland. YES is a practical, year-long programme for year 12 and 13 students.
22. Fostering youth entrepreneurship is a key requirement for developing an innovative economy and creating employment pathways for our young people. Through the programme, students develop creative ideas into actual businesses, complete with real products and services and real profit and loss. Students learn key work skills and business knowledge including business fundamentals, planning, interpersonal relations, financial, decision making, reporting, risk management and teamwork. YES helps create a culture of innovation and entrepreneurship amongst Auckland’s young people.
23. The funding from the local board will support through sponsorship, the delivery of the overall YES program, including the Kick Start days in February 2022 where the Auckland Business Chamber will specifically acknowledge local board support. The Kick Start days are the first day students get to meet the Young Enterprise team, and find out about their 2022 year, what YES is about, and what is in store for them. All schools in the local board area that have shown an interest in YES are invited. In addition, the invite is extended to those schools who have not shown an interest to enable them to decide as to whether to participate.
Tauākī whakaaweawe āhuarangi
Climate impact statement
24. The proposed work programme does not significantly impact on greenhouse gas emissions or contribute towards adapting to the impacts of climate change.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
25. The work programme was developed through a collaborative approach by operational council departments, with each department represented in the integrated team that presented the draft work programme to the local board at a series of workshops.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
26. The proposed AUL work programme has been considered by the local board in a series of workshops from December 2020 to May 2021. The views expressed by local board members during the workshops have informed the recommended work programme.
27. The activities in the proposed work programme align with the Manurewa Local Board Plan 2020 outcomes specifically:
· Our local economy continues to grow
· Young people have the skills and training needed for quality, sustainable employment.
Tauākī whakaaweawe Māori
Māori impact statement
28. Table 1 outlines the activities in the 2020/2021 work programme that contribute towards the delivery of specific Māori outcomes.
Table 1: Māori impact assessment of proposed activities
Activity name |
Māori impact |
Town Centre Steering Group |
In implementing projects and initiatives to support the aims and objectives of the steering group local Māori business within the town centre will be able to benefit from increased vitality in the centre and in turn greater spend. |
Local Business Mentors |
The Local Business Mentors project will ensure Māori businesses identified on our database and that are a part of the Whariki Māori Business Network are made aware of the programme available. Data on Māori business participation will be collected as part of AUL’s KPI reporting and will be shared with the local board. The current Business Mentors New Zealand Strategic Plan identifies aligning the mentoring service with te ao Māori and expanding the pool of Māori mentors through partnerships such as with Te Puni Kōkiri and Poutama Trust as one of its current strategic objectives. |
Rebel Business School |
Rebel Business School project will report on the numbers of Māori participating on the course and establishing a Māori owned business, collected as part of the reporting on the effectiveness of the project. |
Young Enterprise Scheme Kick Start Days |
Young Enterprise Scheme Kick Start Days will support YES Māori students at participating schools to benefit from the experience and learnings from the YES. |
Ngā ritenga ā-pūtea
Financial implications
29. The proposed AUL work programme budget for 2021/2022 is $125,500 of the board’s locally driven initiatives (LDI) operational budget. This amount can be accommodated within the board’s total draft budget for 2021/2022.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
30. The COVID-19 pandemic could have a further negative impact on the delivery local board work programmes if the COVID-19 Alert Level changes (New Zealand’s 4-level Alert System specifies measures to be taken against COVID-19 at each level). The deliverability of some activities will decrease if there is an increase to the COVID-19 Alert Level.
31. Table 1 shows identified significant risks associated with activities in the proposed 2021/2022 work programme.
Table 1: Significant risks and mitigations for activities
Activity name |
Risk |
Mitigation |
Rating after mitigation |
Town Centre Steering Group |
Specific projects are not identified, or the delivery partners are unable to deliver to the agreed scope |
The project delivery will be reviewed regularly at the monthly Town Centre Steering Group meeting |
Low/Medium |
Town Centre Steering Group |
Activities identified in the BID strategic Plan Implementation Plan do not require local board support or do not meet the board’s requirements in order to fund |
As a member of the steering group the BID can consult with the group on the Implementation Plan to identify possible activities the board may be willing to support. |
Low |
Town Centre Steering Group |
The BID does not complete the development of the implementation plan in time to allocate funds to activities |
As a member of the steering group the BID can consult with the group on the Implementation Plan to ensure the completion stays on track to enable access to the funds |
Low |
Pop up Business School |
Low attendance |
Concerted locally targeted social media promotion and use of local networks to reach target audience. A review of attendance patterns will be undertaken |
Medium |
Local Business Mentors |
The programme will not recruit the number of businesses envisaged |
AUL will promote the programme via social media, and AUL will also work with local business associations to promote the programme. Business Mentors New Zealand will also refer businesses in where they meet the criteria established for engagement in the local board funded programme. |
Medium |
Young Enterprise Scheme Kick Start Days |
Kick Start days do not proceed due to changes in the Covid-19 alert levels. As a result, the sponsorship provided to the Auckland Business Chamber may not be required |
Maintain contact with the Auckland Business Chamber on the running of the event to ensure that if the events are cancelled the full impact on the need for the local board support is identified. |
Medium |
32. Where a work programme activity cannot be completed on time or to budget, due to unforeseen circumstances, this will be signalled to the local board at the earliest opportunity.
Ngā koringa ā-muri
Next steps
33. Delivery of the activity in the approved work programme will commence once approved and continue until 30 June 2022. Activity progress will be reported to the local board on a quarterly basis.
Attachments
No. |
Title |
Page |
a⇩ |
Manurewa Local Board - Auckland Unlimited Work Programme 2021-2022 |
183 |
Ngā kaihaina
Signatories
Author |
Luo Lei – Local Economic Development Advisor |
Authorisers |
John Norman – Strategic Planning Manager Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Approval of the Manurewa Local Board Auckland Emergency Management work programme 2021/2022
File No.: CP2021/07173
Te take mō te pūrongo
Purpose of the report
1. To approve the Manurewa Local Board Auckland Emergency Management work programme 2021/2022.
Whakarāpopototanga matua
Executive summary
3. The work programme responds to the following outcomes and objectives that the local board identified in the Manurewa Local Board Plan 2020:
· Outcome – Our natural environment is protected, restored and enhanced.
· Objective - Our communities strengthen their resilience to disasters and the impacts of climate change.
4. The board provided feedback to staff on the project it would like to fund in a series of workshops. The board indicated its support for the following project, with budgets as listed below:
· Community emergency resilience programme – zero (budget sits with Connected Communities).
5. The proposed work programme has a total value of zero, and budget is not required from within the board’s draft locally driven initiatives (LDI) budget for the 2021/2022 financial year.
6. Updates on the delivery of this work programme will be provided through the board’s quarterly performance reports.
Recommendation/s
That the Manurewa Local Board:
a) approve the Auckland Emergency Management work programme 2021/2022 (Attachment A to the agenda report)
Horopaki
Context
7. Each year, the local board decides which activities to allocate its annual budget toward, through a series of workshops. The local board feedback in these workshops has informed the work programme.
· Our natural environment is protected, restored and enhanced.
Tātaritanga me ngā tohutohu
Analysis and advice
9. The proposed activities for delivery as part of the board’s Auckland Emergency Management work programme 2021/2022 are detailed below. See Attachment A for further detail.
Community emergency resilience programme – zero (budget sits with Connected Communities).
10. In partnership with Connected Communities, Auckland Emergency Management will support engagement with interested communities to strengthen their resilience to disaster events. This includes practical emergency preparedness workshop, scenario exercise and targeted and culturally appropriate resources that can assist with greater hazard risk understanding, reducing the impacts of these risks and improving disaster preparedness.
Tauākī whakaaweawe āhuarangi
Climate impact statement
11. Table 1 outlines the activities in the 2021/2022 work programme that have an impact on greenhouse gas emissions or contribute towards climate change adaptation.
Table 1: Climate impact assessment of proposed activities
Activity name |
Climate impact |
Community emergency resilience programme |
Positive impact on our resilience to climate change, as this works increases community resilience to emergencies and the impacts of climate change. |
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
12. The work programme was developed through a collaborative approach by operational council departments, with each department represented in the integrated team that presented the draft work programme to the local board at a series of workshops.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
13. The proposed Auckland Emergency Management work programme has been considered by the local board in a series of workshops from November 2020 to May 2021. The views expressed by local board members during the workshops have informed the recommended work programme.
14. The activities in the proposed work programme align with the Manurewa Local Board Plan 2020 outcomes.
Tauākī whakaaweawe Māori
Māori impact statement
15. Where aspects of the proposed work programme are anticipated to have a significant impact on activity of importance to Māori then appropriate engagement will be undertaken.
Ngā ritenga ā-pūtea
Financial implications
16. The proposed Auckland Emergency Management work programme budget for 2021/2022 is zero of operational budget. Budget is not requied from the Manurewa Local Board’s draft locally driven initiatives (LDI) operational budget for 2021/2022.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
17. Where a work programme activity cannot be completed on time or to budget, due to unforeseen circumstances, this will be signalled to the local board at the earliest opportunity.
Ngā koringa ā-muri
Next steps
18. Delivery of the activity in the approved work programme will commence on 1 July 2021 and continue until 30 June 2022. Activity progress will be reported to the local board on a quarterly basis.
19. Where the work programme identifies further decisions and milestones for each activity, these will be brought to the local board when appropriate.
Attachments
No. |
Title |
Page |
a⇩ |
AEM work programme |
189 |
Ngā kaihaina
Signatories
Author |
Bridget Vercoe - Principal Business Resilience |
Authorisers |
Kate Crawford - General Manager Auckland Emergency Management Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
Feedback on Equity of Service Levels and Funding Proposals - Draft Report
File No.: CP2021/07918
Te take mō te pūrongo
Purpose of the report
1. To provide local board feedback to the Joint Governance Working Party on the funding and decision-making proposals set out in the Equity of Service Levels and Funding - Draft Report.
Whakarāpopototanga matua
Executive summary
2. The local board has received and discussed the Equity of Service Levels and Funding - Draft Report at its April/May 2021 workshop.
3. The Draft Report (refer Attachment A) sets out the draft recommendations from the Joint Governance Working Party in relation to:
· improving the equity of funding allocation across local boards
· increasing the decision-making responsibility of local boards
· establishing minimum service levels
· implications of multi-board services.
4. The Joint Governance Working Party seeks local board feedback on these proposals to consider in the preparation of a final set of proposals to be reported to the Governing Body.
5. The local board’s feedback on these proposals (refer Attachment B) has been prepared on the template provided.
Recommendation/s
That the Manurewa Local Board:
a) provide feedback using the attached template (Attachment B) to the Joint Governance Working Party on the funding and decision-making proposals set out in the Equity of Service Levels and Funding Proposals – Draft Report.
Horopaki
Context
6. In October and November 2020 workshops, local boards considered and provided input on the Equity of Service Levels and Funding Discussion paper which presented options, in respect of local community services, to:
· increase local board decision making responsibility
· increase equity of funding allocation between local boards
· establish minimum service levels where required
· address funding of multi-board services and decision-making on their service levels.
7. The Joint Governance Working Party considered this local board input and provided direction to staff in the preparation of the funding and decision-making proposals of the Equity of Service Levels and Funding Draft Report (refer Attachment A).
8. Staff presented the Draft Report to local boards in workshops between 6 April and 6 May 2021.
9. The purpose of this report is to enable the local board to provide formal feedback on the draft recommendations which propose:
· changes to local board decision-making responsibilities over local community services
· implementation of an equity-based funding allocation approach for local community services.
10. These matters will be reported to the Joint Governance Working Party and then to the Governing Body later this year. If adopted, public consultation would be undertaken with the aim of implementing decisions progressively between 2022 and 2024.
Tātaritanga me ngā tohutohu
Analysis and advice
11. These proposals (refer Attachment A) are significant changes. If adopted by the Governing Body, these recommendations would:
· increase local board decision-making responsibilities over community services
· change the allocation of Asset Based Services (ABS) funding to local boards
· require collaboration between local boards on some multi-board service decisions
· have a high community interest
· not affect existing local board responsibility for Local Discretionary Initiatives (LDI) service decisions or the current LDI funding approach.
12. Feedback on these proposals is sought from the local board to assist the Joint Governance Working Party in providing direction to staff and the Governing Body on progressing these proposals.
13. The Working Party’s final report to the Governing Body will also update illustrative funding outcomes with asset values and ABS budgets updated and adopted under Long-term Plan 2021-31. Funding outcomes remain illustrative until funding model and financial inputs are adopted, planned for Long-term Plan 2024-34.
Tauākī whakaaweawe āhuarangi
Climate impact statement
14. Providing feedback on the draft report does not have a direct impact on climate change.
15. Changes made to local community services as a result of the proposed policy may have a climate impact and will be assessed on a case-by-case basis.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
16. If adopted, the proposed policy will impact on several divisions of the council including Customer and Community Services, Finance and Governance. Staff from these divisions have been involved in the development of these proposals.
17. Staff from these divisions will also be significantly involved in the implementation of Governing Body decisions on the proposals. A critical implementation workstream will ensure staff have the capacity and the knowledge required to enable sound advice to be provided to local boards under these proposals.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
18. Over time, these proposals have the potential to fundamentally change local community service delivery depending on the extent to which local boards and their communities make changes.
19. Local boards have discussed policy options in workshops in October and November 2021 and considered the proposed policy in workshops in April and May 2021. Local boards can also provide their input and views through their representatives on the Joint Governance Working Party.
20. This report provides the opportunity for local boards to provide their formal feedback on the Draft Report proposals.
21. More detailed discussion of the local implications of the policy proposal is included in the Draft Report, provided as Attachment A.
Tauākī whakaaweawe Māori
Māori impact statement
22. As part of increased decision-making for asset-based services, and under local government legislation, local boards must demonstrate how Māori are involved, and their needs are reflected, in these decisions. This means that in making service decisions, local boards should be able to:
· demonstrate effective Māori involvement in the local board planning processes
· clearly articulate Māori priorities in local board funding and delivery of asset-based services.
23. It is likely that these changes will result in more responsive services for Māori communities at the local level.
Ngā ritenga ā-pūtea
Financial implications
24. Introduction of the proposed policy would have several significant financial impacts, including:
· changes to local board funding allocations that may result in funding increases for some local boards and funding decreases for others
· broader local board decision-making responsibilities that will require greater flexibility in how local boards allocate their funding to service delivery
· local board decisions which would include service impacts on assets, such as investment, enhancement, renewal, optimisation and removal from service.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
25. Development of the proposed policy involved several workshops with each local board. Several local boards requested additional workshops on the proposals as their implications became better understood.
26. A range of risks associated with approval and implementation of these proposals were discussed during workshops and considered in the development of these proposals, including:
· whether there will be sufficient understanding of the proposals and support for their benefits to enable them to be adopted
· what alternative approaches might address the issues these proposals seek to address, should they not proceed
· developing alternative funding equity transition options including implications on local board funding and overall timing
· developing options to respond to concerns of local boards which might be adversely affected by equity funding proposals
· addressing local board concerns for the perceived downside of greater decision-making responsibility if the level of decision support does not increase
· ensuring the organisation is structured, resourced and adequately supported to provide the quality service advice needed by local boards to make well-informed decisions.
27. Plans are either in place or currently being developed to address these risks. The proposed two stage implementation timeline (see below) is designed to progressively grow the council capability, develop robust processes, and ensure effective and transparent management of necessary changes.
Ngā koringa ā-muri
Next steps
28. Staff will report local board feedback to the Joint Governance Working Party which will consider this feedback, along with further staff advice, and provide its recommendations to the Governing Body later this year.
29. The Governing Body would undertake public consultation on its draft decisions as follows:
· under the Annual Plan 2022/23, in the case of changes to the Allocation of Decision-making Responsibilities policy
· under the Long-term Plan 2024-2034, in the case of changes to the Local Board Funding policy.
30. Proposals adopted by the Governing Body would be progressively implemented from 2022 to 2024.
Attachments
No. |
Title |
Page |
a⇨ |
Equity of Service Levels and Funding Draft Report (Under Separate Cover) |
|
b⇩ |
Governance Framework Review - Service levels and funding - feedback template |
195 |
Ngā kaihaina
Signatories
Author |
Gary Pemberton - Programme Change Lead |
Authorisers |
Justine Haves - General Manager Service Strategy and Integration Louise Mason - GM Local Board Services Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Economic Development Action Plan: Draft for feedback
File No.: CP2021/08098
Te take mō te pūrongo
Purpose of the report
1. To seek local board feedback on the draft Economic Development Action Plan: Council’s role in Auckland’s recovery 2021-24.
Whakarāpopototanga matua
Executive summary
2. The council organisation and council-controlled organisations have worked collaboratively to develop the draft Economic Development Action Plan. This plan defines and agrees, for the next three years, the council family’s economic objectives and priorities and determines a coordinated course of action. The plan is limited to actions that are within the remit of council and council-controlled organisation (CCO) activities.
3. The draft plan aligns with the 10-year budget and will inform the work programmes of relevant council family departments. The work is supported by the chief executives of council and all substantive council-controlled organisations.
4. The draft plan outlines detailed actions within six areas of focus (‘workstreams’) as outlined in Attachment A. It reflects the guiding principles of transitioning towards a regenerative and low carbon economy, supporting economic opportunities for Māori, and responding to our communities of greatest need.
5. There will be targeted engagement on the draft plan, including with iwi, advisory panel members and business groups. Feedback will be sought until 14 June 2021.
Recommendation/s
That the Manurewa Local Board:
a) receive the draft Economic Development Action Plan: Council’s role in Auckland’s recovery 2021-24.
b) provide feedback by 14 June 2021 for consideration in the final draft Economic Development Action Plan: Council’s role in Auckland’s recovery 2021-24.
Horopaki
Context
6. In August 2020, the CCO Review Panel delivered its report alongside 64 recommendations which were endorsed in full by the Governing Body. The review stated that council and all substantive council-controlled organisations (CCOs) should together define the economic outcomes for Auckland and agree on how to achieve and measure them. The review also acknowledged the need for better coordination and definition of responsibilities for local economic development within the council family. The Economic Development Action Plan forms part of council’s response to that review.
7. The plan is not a long-term strategy and does not replace the Economic Development Strategy 2012. The priorities and focus over the next three years, however, consider direction from council’s existing strategies i.e., the Auckland Plan 2050, Economic Development Strategy 2012, Te Tāruke-ā-Tāwhiri: Auckland’s Climate Plan and Kia Ora Tāmaki Makaurau: Council’s Māori Outcomes Framework.
Tātaritanga me ngā tohutohu
Analysis and advice
8. Comprehensive background work to support the development of the action plan has been completed by the Chief Economist Unit (CEU), the Auckland Plan Strategy and Research Department (APSR) and Auckland Unlimited. This includes a report from the CEU providing a profile of Auckland’s economy over the last 10 years, the impact of Covid-19 on the Auckland economy, and the main roadblocks to recovery. The same report also identified areas where the council group can have a material impact on economic development. Key areas are:
· assets
· procurement
· land use and zoning
· regulatory processes
· travel network
· town centres
· pricing
· skills and investment attraction
· tourism attraction
· social support services
· coordination of responses through partnerships.
9. There has also been an extensive review of plans and strategies across the council and CCOs to identify common economic development themes. These were: innovation and technology, Māori economy, regenerative, resilient, low carbon economy, workforce transition, competitive high-value sectors, local economic development, infrastructure, and culture and creativity.
10. This background work formed the basis for six workstreams:
· Destination Tāmaki Makaurau: attracting people and investment
· Local Tāmaki Makaurau: enabling thriving local economies
· Skilled Tāmaki Makaurau: supporting quality jobs and skill development
· Future Tāmaki Makaurau: preparing businesses for the future
· Enabled Tāmaki Makaurau: infrastructure enabling economic development
· Enabled Tāmaki Makaurau: regulations that enable economic development.
11. Each workstream has both council and CCO staff representation. These workstreams have developed a set of actions with responsibilities and timeframes as detailed in this draft plan. A monitoring framework will be developed to ensure roles, responsibilities and accountabilities of council and each CCO are clearly defined as they relate to the actions in the draft plan.
Tauākī whakaaweawe āhuarangi
Climate impact statement
12. Te Tāruke-ā-Tāwhiri: Auckland’s Climate Plan has provided direction to the development of the draft plan, aspiring to a more resilient economy that is regenerative, inclusive, local and enables Aucklanders to thrive.
13. The draft action plan has embedded the guiding principle of ‘transitioning to a regenerative and low carbon economy’ into each of its six workstreams. The development of actions is underpinned by kaitiakitanga and considers how resources used give back to nature and increase value through reuse and renewal. Where applicable, actions broadly encourage a decrease in greenhouse gas emissions, low carbon products and services, climate innovation, and less dependency on natural resources.
14. The actions presented in this draft action plan will go through a further climate impact assessment using tools developed by the Chief Sustainability Office. The results of this assessment will be incorporated into the final plan.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
15. The draft plan responds to the CCO review recommendation for council and all CCOs to together define the economic outcomes for Auckland and agree on how to achieve and measure them. The actions in the draft plan will be shared and accountabilities of council and each CCO well defined. Some CCOs will have a more active role than others.
16. The scope and development of the Economic Development Action Plan has been agreed to through the council and CCO Chief Executives’ group. This group is updated with progress on the plan as appropriate. The project team includes a representative and contribution from each CCO.
17. The scope of the plan is limited to actions that are within the remit of council and CCO activities. A review and discussion document of the council group’s levers that materially contribute to economic development formed the basis for this draft plan (refer to Attachment B).
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
18. Each workstream of the plan will have a local impact, acknowledging the interdependency of local economies and the regional economy. The draft plan includes the focus area ‘Local Tāmaki Makaurau: enabling thriving local economies’ and has been informed by the recent local board plans’ local economic priorities.
19. The Local Tāmaki Makaurau workstream seeks to clarify what the Auckland Council group will do to support the local economies of Auckland. This includes setting out the roles that each part of the group plays in delivering actions, while also setting the foundations to help the group identify the economic places (sub-regional and local) of Auckland and deliver outcomes at the local level.
20. A memo was distributed on 17 February 2021 to inform local board members of the development of council’s Economic Development Action Plan 2021-24 and to outline the process for local board feedback to the plan. At the request of the local board chairpersons, the draft plan will be provided at all local board business meetings in May 2021 with written feedback by formal resolution provided to the project leads by 14 June 2021.
Tauākī whakaaweawe Māori
Māori impact statement
21. Kia Ora Tāmaki Makaurau has provided direction to the development of the draft plan, in particular, the Kia ora te Umanga mahi objective of supporting economic opportunities for Māori businesses and iwi organisations. The draft plan has also considered direction from the Auckland Plan 2050, the Kaitiaki Forum’s strategic plan and the Independent Māori Statutory Board’s Issues of Significance (2017) as they relate to Māori economic development.
22. The draft action plan has embedded the guiding principle of ‘supporting economic opportunities for Māori’ into each of its six workstreams. The development of actions will consider partnership opportunities with mana whenua and mataawaka, a focus on equity and addressing systemic barriers, and identifying new economic opportunities for Māori.
23. The project team have communicated with iwi from the commencement of the project to determine and initiate the preferred process of engagement for each iwi. This draft plan will be sent to all iwi for input and feedback through to 14 June 2021.
Ngā ritenga ā-pūtea
24. The scope of the Economic Development Action Plan states that actions will be funded within the existing 10-year Budget 2021-2031 and therefore, no additional funding is required. The draft plan identifies some actions that rely on external funding sources and partnerships.
25. At the advice of the finance division, budget alignment is demonstrated in the draft plan at both the group of activity and CCO / council directorate level.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
26. The draft plan outlines actions that require a commitment from the responsible directorate to include in their work programmes and within their existing budgets. The monitoring framework will include regular progress reporting to ensure effective implementation of the action plan.
27. This action plan is an internal document, outlining work to be done within the remit of council and its CCOs. The content of the plan builds on earlier consultation undertaken in the development of key strategies that have provided direction. Input and feedback for this action plan has therefore been targeted to key groups.
Ngā koringa ā-muri
Next steps
28. The draft plan will be distributed to the key groups that have been engaged from the commencement of the project. Feedback will be considered until 14 June 2021.
29. The final Economic Development Action Plan: Council’s role in Auckland’s recovery 2021-24 and its monitoring framework will be presented to the Parks, Arts, Community and Events committee on 8 July 2021 for adoption.
Attachments
No. |
Title |
Page |
a⇨ |
Draft Economic Development Action Plan (Under Separate Cover) |
|
b⇩ |
Auckland's economic recovery and council's role |
207 |
Ngā kaihaina
Signatories
Authors |
Janelle Breckell - Principal Strategic Advisor James Robinson, Head of Strategy and Planning, Auckland Unlimited |
Authorisers |
Louise Mason - GM Local Board Services Jacques Victor - GM Auckland Plan Strategy and Research Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Delegation of feedback to be provided to the Establishment Unit Board of the City Centre to Māngere light rail project
File No.: CP2021/07881
Te take mō te pūrongo
Purpose of the report
1. To consider whether the local board wishes to formally delegate one local board member to provide feedback to the Establishment Unit Board of the City Centre to Māngere light rail project.
Whakarāpopototanga matua
Executive summary
2. An Establishment Unit is being set up by the Cabinet to provide the public face of the City Centre to Māngere light rail project, undertake stakeholder and community engagement, and take forward work to resolve key outstanding questions in relation to project scope and delivery. A key output of the unit will be to develop a business case over approximately six months which looks at the available options.
4. Minister of Transport Hon Michael Wood wrote to local board members in May 2021 inviting local board members to select a single representative to be appointed to the Establishment Unit Board. At the May 2021 Chairs’ Forum, Margi Watson was selected for this role.
5. The Establishment Unit now has until early September 2021 to gather the views of local boards, ward councillors, and the public.
6. Staff are requesting that local boards delegate a member to provide feedback on behalf of the local board, to ensure that feedback can be provided in a short timeframe after public feedback has been collated and provided to the local board.
Recommendation/s
That the Manurewa Local Board:
a) considers if the local board wishes to delegate one local board member to provide feedback on behalf of the local board to the Establishment Unit Board of the City Centre to Māngere light rail project.
Horopaki
Context
7. In March 2021, the Cabinet met to agree how to progress the next steps for the City Centre to Māngere light rail project (CC2M).
8. To give effect to this, the Cabinet has directed that an Establishment Unit be set up to provide the public face of the project, undertake stakeholder and community engagement, and take forward work to resolve key outstanding questions in relation to project scope and delivery entity.
9. The Establishment Unit Board will be chaired by an independent chair appointed by the Minister of Transport and the Minister of Finance. Membership will comprise:
· a single representative (the chief executive or a senior delegate) from Auckland Council, Auckland Transport, Waka Kotahi, Kāinga Ora and the Ministry of Transport
· a representative from mana whenua
· a representative of Auckland Council’s local boards (Margi Watson)
· a representative of Auckland Council’s Governing Body (Chris Darby)
· Te Waihanga (the New Zealand Infrastructure Commission) and Treasury will support the work of the Establishment Unit Board as observers.
10. A key output of the unit will be to develop a business case over approximately six months which looks at the available options. This will enable quality decisions on key matters based on evidence, such as mode, route alignment and delivery.
11. The Mayor and Deputy Mayor have been invited to join Minister of Transport Hon Michael Wood and Minister of Finance Hon Grant Robertson as sponsors of this project. This sponsors group will play an important function in ensuring political alignment on the project between central and local government and setting strategic direction.
Tātaritanga me ngā tohutohu
Analysis and advice
12. The Auckland Light Rail team will be engaging with local boards first so that local board members are clear about the scope and programme of engagement.
13. This will take place as follows:
· 11 June: briefing the six local boards that are within the planned corridor for light rail - Waitematā, Albert-Eden, Puketāpapa, Maungakiekie-Tāmaki, Māngere-Ōtāhuhu and Ōtara-Papatoetoe
· 14 June: presentation to Chairs’ Forum
· 30 June: inviting local board chairs or their delegate to attend a Planning Committee briefing
· Further briefings will be organised to take place after the public consultation period in July/ August 2021.
14. Staff will focus on providing local board members with an understanding of the approach being taken by the Establishment Unit and key constraints, so that local board members can respond to any queries they received and champion the engagement process within their community.
15. Throughout the engagement period, the Establishment Unit will be seeking broad views, key themes (could be geographically based) and feedback on the outcomes the project is set to achieve. This will mirror the public engagement process that will also focus on outcomes and community experience.
16. In order to ensure that there is adequate time for local boards to review public feedback ahead of providing local board feedback, staff are recommending that local boards delegate a member to provide the local board’s feedback
Tauākī whakaaweawe āhuarangi
Climate impact statement
17. Delegating to one local board member the authority to provide feedback to the Establishment Unit Board of the City Centre to Māngere light rail project does not have any quantifiable climate impacts.
18. The Establishment Unit Board will have an opportunity to consider climate impacts as part of making recommendations on the project.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
19. The Mayor and Deputy Mayor have been invited to join the Minister of Transport Hon Michael Wood and Minister of Finance Hon Grant Robertson as sponsors of the project. The project sponsors will set the strategic direction for the project, including the project scope and engagement plans, and maintain political cooperation between central government and Auckland Council with regards to the project.
20. The Governing Body representative and the local board representative will be joined by the Chief Executive as the representatives of Auckland Council on the Establishment Unit Board.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
21. This delegation will provide the opportunity for all local boards to provide formal feedback to the Establishment Unit Board within the given timeframe of this first stage of work.
22. Margi Watson, as the local board representative on the Establishment Unit Board, will develop good lines of communication with other local board members. Having a local board representative on the Establishment Unit Board is not a proxy for local board engagement on this project and does not replace the need to obtain feedback from local boards.
Tauākī whakaaweawe Māori
Māori impact statement
23. The work of the Establishment Unit will be guided by an inclusive governance structure made up of representatives of central and local government, Treaty Partners and an independent chairperson.
24. A key function of the Establishment Unit will be to undertake high quality engagement with communities, stakeholders, mana whenua and mataawaka.
Ngā ritenga ā-pūtea
Financial implications
25. Delegating to one local board member the authority to provide feedback to the Establishment Unit Board of the City Centre to Māngere light rail project does not have any financial implications.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
26. No risks have been identified for delegating to one local board member the authority to provide feedback to the Establishment Unit Board of the City Centre to Māngere light rail project.
27. The risks of not appointing a delegate may be that formal feedback is not able to be provided by the local board within the relevant timeframe or may need to be provided via the urgent decision mechanism.
Ngā koringa ā-muri
Next steps
28. Staff will work with the Establishment Unit to make arrangements for local board briefings ahead of public consultation.
29. Public consultation will take place in July and August 2021.
30. Further briefings to provide analysis of the public feedback received will be provided towards the end of August 2021.
31. Delegated local board members will provide feedback on behalf of their local board by 2 September 2021.
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Author |
Kat Ashmead - Senior Policy Advisor, Local Board Services |
Authorisers |
Louise Mason - GM Local Board Services Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
Manurewa Local Board 17 June 2021 |
|
Urgent Decision Memo - Light Rail Establishment Unit Board delegation to Chairs' Forum
File No.: CP2021/07884
Te take mō te pūrongo
Purpose of the report
1. To notify the Manurewa Local Board of a decision made under the local board’s urgent decision-making process.
2. To endorse the use of the Chairs’ Forum as the selection panel to appoint the local board representative to the Establishment Unit Board of the City Centre to Māngere light rail project as provided in Attachment A.
Recommendation/s That the Manurewa Local Board: a) note the urgent decision to endorse the use of the Chairs’ Forum as the selection panel to appoint the local board representative to the Establishment Unit Board of the City Centre to Māngere light rail project as provided in Attachment A. |
Attachments
No. |
Title |
Page |
a⇩ |
Urgent Decision Memo |
233 |
Ngā kaihaina
Signatories
Author |
Rohin Patel - Democracy Advisor |
Authoriser |
Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Manurewa Local Board input approved and submitted for inclusion in Auckland Council submissions - May 2021
File No.: CP2021/07901
Te take mō te pūrongo
Purpose of the report
1. To note Manurewa Local Board input approved and submitted for inclusion in Auckland Council submissions by the chair under delegated authority from the board during May 2021.
Whakarāpopototanga matua
Executive summary
2. At its April 2020 business meeting, the Manurewa Local Board delegated authority to the chair to approve and submit the board’s input into Auckland Council submissions on formal consultation from government departments, parliament, select committees and other councils where the submission timeframes do not allow for local board input to be considered and approved at a local board meeting (resolution MR/2020/44).
3. The resolution requires that all local input approved and submitted for inclusion in an Auckland Council submission under this delegation is to be included on the next local board meeting agenda for the public record.
4. During May 2021, this delegation was used to approve local board input into Auckland Council’s submissions on the following:
· the Ministry of Business, Innovation and Employment’s proposed changes to support effective management of freedom camping in New Zealand (Attachment A)
· the Transport and Infrastructure Committee inquiry into congestion pricing in Auckland (Attachment B).
5. The board’s draft input into these submissions was circulated to all members for comment before being approved and submitted.
Recommendation/s That the Manurewa Local Board: a) note the Manurewa Local Board input into Auckland Council’s submissions on: i) the Ministry of Business, Innovation and Employment’s proposed changes to support effective management of freedom camping in New Zealand ii) the Transport and Infrastructure Committee inquiry into congestion pricing in Auckland.
|
Attachments
No. |
Title |
Page |
a⇩ |
Manurewa Local Board feedback on MBIE freedom camping consultation |
239 |
b⇩ |
Manurewa Local Board Congestion Charging Feedback |
241 |
Ngā kaihaina
Signatories
Author |
Robert Boswell - Local Board Advisor |
Authoriser |
Carol McKenzie-Rex - Local Area Manager Franklin, Manurewa, Papakura |
17 June 2021 |
|
Eke Panuku Development Auckland - Manurewa Local Board Six-Monthly Report to 31 March 2021
File No.: CP2021/06698
Te take mō te pūrongo
Purpose of the report
1. To update the Manurewa Local Board on Eke Panuku Development Auckland (Eke Panuku) activities within the local board area and the region, for the period from 1 September 2020 to 31 March 2021.
Whakarāpopototanga matua
Executive summary
2. This report is for information only and no decision-making is required.
3. This report covers our urban regeneration programme in relation to the local board area from 1 September 2020 to 31 March 2021.
4. It also includes information on property management, purchases and sales in relation to the local board area, which Eke Panuku undertakes on behalf of Auckland Council.
5. Please note that this report is for seven months. This is to align future reports with other Eke Panuku reporting cycles.
6. This report is a record of events for the Manurewa Local Board area during the stated period.
7. Transform Manukau: A refresh of the Manukau spatial masterplan is underway. Eke Panuku is initiating work for future use of the civic council site (white house). MIT TechPark student moved in, Barrowcliffe Bridge and Housing developments began, and planning began for Innovating streets for People projects in Manukau. Construction is also underway on the Wiri pond path and playground, and concept designs are being developed for Hayman Wetland.
8. Eke Panuku currently manages 11 leases in the Manurewa Local Board area.
Recommendation/s
That the Manurewa Local Board:
a) receive the Eke Panuku Development Auckland - Manurewa Local Board Six-Monthly Report to 31 March 2021.
Horopaki
Context
9. Eke Panuku Development Auckland is the council-controlled organisation that delivers urban regeneration in Tāmaki Makaurau (Auckland). Urban regeneration is the planning of neighbourhoods and the improvement of buildings and spaces to strengthen communities and the economy to make it an even better place to live.
10. Our city is facing rapid growth. Quality development is required to accommodate this growth and to ensure people love and can afford to live in Auckland. We imagine a city of strong neighbourhoods. We work across many neighbourhoods throughout our city from large, long-term urban regeneration plans to small projects on specific sites to meet the needs of the city’s long-term growth - including more types of homes people can afford. We work alongside the locals, other parts of the council and businesses to regenerate our city in ways that benefit both our local communities and Auckland as a whole.
11. We deliver returns for the council, and at the same time, we ensure our assets contribute positively to the neighbourhoods of Tāmaki Makaurau. We manage around $2.4 billion of land and buildings owned by the Auckland Council.
12. In the period 1 September 2020 to 31 March 2021, we continued our urban regeneration programme across the region, brought a $22.8m return to the council via property management, purchased six properties on behalf of the group, and sold nine properties as part of either our neighbourhood regeneration or as directed by Auckland Council.
Tātaritanga me ngā tohutohu
Analysis and advice
Urban regeneration – Manurewa Local Board area
Transform Manukau
13. The Transform Manukau programme aims to create a thriving heart and soul for the south. Manukau Central will be the gateway to affordable and sustainable urban living, a meeting place and a hub for learning, leisure, cultural experiences; surrounded by healthy neighbourhoods.
14. Manukau masterplanning - A refresh of the Manukau spatial masterplan was approved in March.
15. Civic council site (the white house) - Eke Panuku is initiating work with the Council’s Corporate Property team to explore options and feasibilities for future use.
16. Kotuku House - The site disposal continues to progress through necessary planning, due diligence and reporting to enable a future go-to-market process. MIT TechPark - Students are moving into the building in stages over the summer period.
17. Puhinui regeneration strategy - Final consultation took place in October and reached a milestone of a final draft strategy. The draft strategy was launched at the Botanic Gardens on 11 November with stakeholders and key contributors.
18. Barrowcliffe Bridge and Place Enhancement Project - All consents were granted, a preferred contractor identified, the contractor took possession of the site, a blessing was held, and works began on 1 December 2020.
19. Barrowcliffe Housing Development - Housing continues to be built, sold and occupied by a growing number of residents on site. Several site visits and tours have been undertaken with elected members and senior staff.
20. Wiri Playground - The Wiri playground construction started in January 2021.
21. Barrowcliffe Pond Shared Path - Works commenced in early February 2021.
Placemaking
22. Placemaking is a process that fosters the creation of vital public spaces. At Eke Panuku this is done through:
· supporting communities through ongoing change taking place
· building trust and knowledge through relationships to ensure that regeneration fits with the characteristics of a place
· develop an iterative, ‘do-learn-do’ process to inform, test, and foreshadow future design
· foster reciprocal relationships between place and people
· capacity-building towards socio-economic regeneration through sustainable procurement and regenerative economics.
Placemaking for Transform Manukau
23. The Manutahi Community – This network of community leaders meets monthly to discuss our activations and other projects. Hosted by the Eke Panuku placemaking team, at these meetings we update and socialise project information and other useful topics for the community.
· 29 October - Informed on activation dates for South and introduced Innovating Streets for People.
· 19 November – Priority Location Director, Richard Davison, updated on the Manukau programme and gave an overview of the council procurement process.
· 17 December – Updated on Manukau projects. Neil Lauagiagi from the Ministry of Social Development spoke about wage subsidies and support currently available.
· 25 March - Updated on Manukau minor works projects and Innovating Streets Manukau. Healthy Waters updated on Hayman Park.