I hereby give notice that an ordinary meeting of the Auckland City Centre Advisory Board will be held on:

 

Date:

Time:

Meeting Room:

Venue:

 

Monday, 28 February 2022

3.00pm

This meeting will be held remotely and a recording of the meeting will be available on: https://www.aucklandcouncil.govt.nz/about-auckland-council/how-auckland-council-works/meetings-council-bodies/Pages/webcasts-council-meetings.aspx

Ngā Hui a te Poari Kaitohutohu mō te Pokapū o Te Tāone Nui o Tāmaki Makaurau /

Auckland City Centre Advisory Board

OPEN AGENDA

 

MEMBERSHIP

Chairperson

Mr Andrew Gaukrodger

Corporate sector

Deputy Chairperson

Mr James Mooney

Urban design/institute of architects

Members

Ms Viv Beck

Business Improvement District

 

Ms Noelene Buckland

City Centre Residents Group

 

Cr Pippa Coom

Waitematā and Gulf Ward Councillor, Auckland Council

 

Mr George Crawford

Property Council of NZ

 

Cr Chris Darby

Auckland Council (Mayor’s alternate)

 

Mayor Hon Phil Goff, CNZM, JP

Auckland Council

 

Mr Matt Harray

Retail sector

 

Mr Jamey Holloway

Business Improvement District

 

Mr Mark Kingsford

Corporate sector

 

Ms Amy Malcolm

Tertiary sector (University of Auckland)

 

Mr Nigel Murphy

Tertiary sector (Auckland University of Technology)

 

Mr Richard Northey

Waitematā Local Board, Auckland Council

 

Mr Antony Phillips

City Centre Residents Group

 

Ms Anahera Rawiri

Ngāti Whātua Ōrākei

 

Mr Patrick Reynolds

Transport representative

 

(Quorum 8 members)

 

 

Mike Giddey

Kaitohutohu Mana Whakahaere / Governance Advisor

23 February 2022

Contact Telephone: +64 9 890 8143

Email: mike.giddey@aucklandcouncil.govt.nz

Website: www.aucklandcouncil.govt.nz

 


Terms of Reference

 

(Excerpt –full terms of reference available as a separate document)

 

1.       These terms of reference set out the roles, responsibilities and working arrangements for the Auckland City Centre Advisory Board.

2.       The board is a key advisory body, with no decision-making or autonomous budgetary authority.

3.       The board will assist the Auckland Council, specifically the Governing Body and the Waitematā Local Board and Auckland Council Controlled Organisations to oversee and be a key advisor to the Auckland Council on achieving the vision and strategic outcomes of the Auckland Plan, the City Centre Masterplan, the expenditure of the city centre targeted rate and city centre issues.

 

Membership:

Includes one councillor and one local board member.

 

The board should include members who can provide expert advice on many areas including transport, landscape, environment and youth sectors. The membership includes a position for Mana Whenua. Representatives from CCOs may be board members without voting rights. The number of the board members should be between 16 and 21 at any time.

 

The new board’s term should end one month prior to the next local government elections in 2022. The membership of the board may be rolled over for more than one electoral term of three years.

 

Purpose of City Centre Targeted Rate

(Excerpt –full information available in a separate document)

 

Background

 

The City Centre targeted rate is to help fund the development and revitalisation of the city centre. The rate applies to business and residential land in the City Centre area.

Activities to be funded

 

The City Centre redevelopment programme aims to enhance the city centre as a place to work, live, visit and do business. It achieves this by providing a high-quality urban environment, promoting the competitive advantages of the city centre as a business location, and promoting the city centre as a place for high-quality education, research and development. The programme intends to reinforce and promote the city centre as a centre for arts and culture, with a unique identity as the heart and soul of Auckland. The rate will fund expenditure within the following activities: Regional planning; Roads and footpaths; Local parks, sports and recreation.

 

The targeted rate will continue until 2024/2025 to cover capital and operating expenditure generated by the projects in the City Centre redevelopment programme. From 2016/2017, unspent funds from the targeted rate have been used to transition the depreciation and consequential operating costs of capital works to the general rate so that from 2019/2020 these costs will be entirely funded from general rates.

 

 


Auckland City Centre Advisory Board

28 February 2022

 

 

ITEM   TABLE OF CONTENTS                                                                                         PAGE

1          Apologies                                                                                                                        7

2          Declaration of Interest                                                                                                   7

3          Confirmation of Minutes                                                                                               7

4          Extraordinary Business                                                                                                7

5          Election of chairperson and deputy chairperson                                                      9

6          City Centre Targeted Rate Portfolio Annual Budget update
2022/2023                                                                                                                     
13

7          Update on the Wai Horotiu Queen Street Project                                                    29

8          Consideration of Extraordinary Items

 


1          Apologies

 

At the close of the agenda no apologies had been received.

 

 

2          Declaration of Interest

 

Members are reminded of the need to be vigilant to stand aside from decision making when a conflict arises between their role as a member and any private or other external interest they might have.

 

 

3          Confirmation of Minutes

 

That the Auckland City Centre Advisory Board:

a)         confirm the ordinary minutes of its meeting, held on Monday, 29 November 2021, as a true and correct record.

 

 

4          Extraordinary Business

 

Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (as amended) states:

 

“An item that is not on the agenda for a meeting may be dealt with at that meeting if-

 

(a)        The local authority by resolution so decides; and

 

(b)        The presiding member explains at the meeting, at a time when it is open to the public,-

 

(i)         The reason why the item is not on the agenda; and

 

(ii)        The reason why the discussion of the item cannot be delayed until a subsequent meeting.”

 

Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (as amended) states:

 

“Where an item is not on the agenda for a meeting,-

 

(a)        That item may be discussed at that meeting if-

 

(i)         That item is a minor matter relating to the general business of the local authority; and

 

(ii)        the presiding member explains at the beginning of the meeting, at a time when it is open to the public, that the item will be discussed at the meeting; but

 

(b)        no resolution, decision or recommendation may be made in respect of that item except to refer that item to a subsequent meeting of the local authority for further discussion.”

 

 


Auckland City Centre Advisory Board

28 February 2022

 

 

Election of chairperson and deputy chairperson

File No.: CP2022/01897

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To elect a chairperson and deputy chairperson for the Auckland City Centre Advisory Board (the board).

Whakarāpopototanga matua

Executive summary

2.       The Auckland City Centre Advisory Board terms of reference states that there should be an annual process of electing the chairperson and deputy chairperson.

3.       The terms of reference also states that the chairperson and deputy chairperson may be re-elected and that the three elected members on the board are ineligible to be appointed in these roles.

4.       The election will take place at this meeting.

5.       The board must decide whether the election will be conducted by open or closed ballot.

6.       The board must also choose a voting system. Staff recommend that the board adopt one of the two voting systems outlined in the Local Government Act 2002 (refer to paragraphs 12 and 13 of this report).

7.       Once the board has made these choices, the lead officer will lead the process for the election of the chairperson. The chairperson will then lead the process for the deputy chairperson.

 

Ngā tūtohunga

Recommendation/s

That the Auckland City Centre Advisory Board:

a)      decide whether the chairperson and deputy chairperson will be elected by open or closed ballot

b)      decide whether the chairperson will be elected using voting system A or voting system B (as described in Schedule 7, Clause 25 of the Local Government Act 2002)

c)      elect a chairperson

d)      elect a deputy chairperson.

 

Horopaki

Context

8.       The board is required to elect a chairperson and deputy chairperson annually.

9.       Once the chairperson has been elected the same process for the deputy chair will follow.

10.     There is no provision for proxy voting. Only members present may nominate and vote for the chairperson. Candidates can vote for themselves.

11.     The board’s terms of reference state that the three elected members are ineligible to be elected as chair or deputy chair to the board.

 

 

Open or closed ballot

12.     The board can choose to elect the chairperson by show of hands, which is an open ballot, or by or by emailing or texting their vote to the governance advisor, which is a closed ballot.

Voting system

13.     The board needs to decide what voting system it wants to use.

14.     Staff recommend to undertake the election in accordance with Schedule 7, Clause 25 of the Local Government Act 2002, and to choose one of the two systems that can be used to elect chairpersons and deputy chairpersons of regional councils and other committees. The two systems are described below.

a)   System A requires that a person is elected or appointed if he or she receives the votes of a majority of the members of the local authority or committee present and voting, and has the following characteristics:

·    there is a first round of voting for all candidates

·    if no candidate is successful in that round there is a second round of voting from which the candidate with the fewest votes in the first round is excluded

·    if no candidate is successful in the second round there is a third, and if necessary subsequent, round of voting from which, each time, the candidate with the fewest votes in the previous round is excluded

·    in any round of voting, if two or more candidates tie for the lowest number of votes, the person excluded from the next round is resolved by lot.

b)   System B requires that a person is elected or appointed if he or she receives more votes than any other candidate, and has the following characteristics:

·    there is only one round of voting

·    if two or more candidates tie for the most votes, the tie is resolved by lot.

Voting procedure at the meeting

15.     The meeting will proceed as follows:

·        the lead officer will call the meeting to order and deal with apologies and the initial procedural items

·        the first item of substantive business will be the election of chairperson and the meeting will be chaired by the lead officer, assisted by the governance advisor

·        the lead officer will call for a decision on whether the ballot will be open or closed. This will be by simple voice or show of hands vote

·        the lead officer will then call for a decision on the voting system. Once a member moves one of the systems and is seconded, it will be put to the vote. Again, a decision will be by voice or show of hands

·        the lead officer will call for nominations for chairperson. Each candidate must be nominated and seconded by a board member who is present

·        if there is only one nomination that person will be declared elected and will assume the chair

·        if there is more than one candidate, an election will take place using the voting system agreed earlier

 

 

 

 

·        if it is closed voting in an online meeting, the governance advisor will request members to email or text him with their vote.

·        once the chairperson is elected, they will assume the chair and carry out the process for electing the deputy chairperson.

·        The meeting will then continue with the next item of business.

 

Ngā tāpirihanga

Attachments

There are no attachments for this report.     

Ngā kaihaina

Signatories

Author

Victoria Wicks-Brown – Principal Advisor, Advisory Panels

Authoriser

John Dunshea - General Manager Development Programmes Office

 

 

 


Auckland City Centre Advisory Board

28 February 2022

 

 

City Centre Targeted Rate Portfolio Annual Budget update
2022/2023

File No.: CP2022/01931

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To update the board on the annual budget for the city centre targeted rate portfolio 2022/2023 to be considered by the Finance and Performance Committee as part of Auckland Council’s 2022/2023 annual plan.

Whakarāpopototanga matua

Executive summary

2.       This update of the annual budget for the city centre targeted rate portfolio budget 2022/2023 is being provided to the board as part of Auckland Council’s 2022/2023 annual plan process.

3.       The annual plan is a standard annual operational function of Auckland Council, it focuses on spend in financial year 2022/2023. The total city centre targeted rate budget for 2022/2023 is $23,782,205.

4.       The increase in construction costs due to ongoing inflationary market forces associated with COVID-19, labour and material shortages will have an ongoing impact on the city centre targeted rate portfolio. Mitigation strategies include focus on scope management, programming and planning of projects, early procurement, material substitution, increasing contingency and escalation allowances in budgets and reprioritisation of construction projects.

5.       Some project or programme budgets and cashflows have been adjusted to align with the latest cost information, current project designs, delivery dates, and anticipated increased costs of construction. The key changes are:

·     inclusion of funding for the Wai Horotiu Queen Street Project following the board’s workshop on 13 December 2021;

·     budget increase for Myers Park underpass following the tender review process;

·     budget increase for Galway Street following the latest forecasted cost information; and

·     budget increase for future projects to reflect anticipated cost inflation.

6.       The Long-term Plan process occurs every three years and allows for wider consideration of ten-year work programmes.

 

Ngā tūtohunga

Recommendation/s

That the Auckland City Centre Advisory Board:

a)      note the city centre targeted rate portfolio budget 2022/2023 (Attachment A of the agenda report)

b)      note that the city centre targeted rate portfolio budget 2022/2023 forms part of Auckland Council’s annual plan.

 

Horopaki

Context

7.       Auckland City Council established the city centre targeted rate in the 2004/2005 financial year to help fund the development and revitalisation of the city centre. The rate is applied to business and residential land in the city centre and is estimated to yield approximately $22.5 million over the financial year 2022/2023.

8.       Auckland Council’s annual plan focuses on 12-month budgets and is informed by the council’s Long-term Plan (10-year budget), Auckland Plan (30-year vision), as well as the 21 Local Board plans (adopted every three years). The annual plan will be subject to public consultation and will be adopted before the start of the 2022/2023 financial year.

9.       The city centre targeted rate portfolio budget is a component of the annual plan.  

10.     The extension of the targeted rate until financial year 2031 was approved as part of the Long-term Plan 2021-2031 (GB/2021/79).  The city centre targeted rate now includes budget lines for programmes in the outer years of the Long-term Plan. Programmes and projects included in the city centre targeted rate portfolio budget 2022/2023 reflect those presented to the board at its 30 November 2020 meeting.

11.     The budget lines in outer years (2029-2031) are indicative only and further planning and project development work will need to be undertaken.

12.     The Auckland City Centre Advisory Board has the opportunity to provide feedback on the portfolio every three years as part of the Long-term Plan process. The next opportunity for ACCAB to provide feedback on years 2024 onwards will be during the next Long-term Plan process starting in 2023.

13.     An update on the City Centre Targeted Rate portfolio and budget was provided to the board at its 27 September 2021 meeting (CEN/2021/18).

Tātaritanga me ngā tohutohu

Analysis and advice

14.     budget for 2022/2023 has been updated and is included as Attachment A to this report.

15.     The total forecast expenditure within the budget for 2022/2023 is shown below in Table 1.

TABLE 1: City centre targeted rate forecasted expenditure 2022/2023

Budget type

2022/2023 forecast

Capex

$17,151,875

Opex

$6,330,330

Total

$23,782,205

 

16.     The reserve at the end of financial year 2031 is currently just over $5 million. The reserve is the cumulative amount of forecast revenue from the targeted rate minus forecast expenditure.

17.     The city centre targeted rate portfolio budget 2020/2021 supports the same projects and programmes as presented to the board in the meeting on 30 November 2020.

18.       The increase in construction costs due to ongoing inflationary market forces associated with COVID-19, labour and material shortages will have an ongoing impact on the city centre targeted rate portfolio. Revised ways of working during COVID-19, including new health and safety compliance and impacts to productivity, will also need to be factored to increased construction budgets.

19.     Higher transport and shipping costs escalated raw material costs and labour pressures associated with manufactured products are contributing to the escalation of certain construction materials being evidenced in the region of 20 percent in the past year and in some instances as high as 40 percent.  Labour market shortages, including within both the skilled and unskilled work force, are also contributing to cost increases and price volatility.  It is expected that the current market conditions will continue to impact on the costs of construction over the short-medium term.

20.     Strategies to mitigate the above pressures include focus on scope management, programming and planning of projects, early procurement, material substitution, increasing contingency and escalation allowances in budgets and reprioritisation of construction projects.

21.     Project or programme cashflows have been adjusted to align with the latest cost information, updated designs, current delivery dates, anticipated increased costs and updated project information. This is expected as the projects develop.

22.     The most significant variances for the 2022/2023 annual budget are for the following projects:

·     Myers Park Underpass

·     Contribution to Wai Horotiu Queen Street project

·     Galway Street

·     Nelson Street Slip-lane

·     Emily Place

23.     Myers Park underpass and the Wai Horotiu Queen Street project are partially funded by the targeted rate and partially funded by general rates.

24.     The 2022/2023 budget provides a budget line called ‘Additional programme fund’ which allows funds for contingency and to respond to immediate opportunities in the city centre.  There is $500,000 allocated to this line for 2022/2023.

Tauākī whakaaweawe āhuarangi

Climate impact statement

25.     The city centre targeted rate portfolio will help ensure projects in the city centre continue to incorporate critical environmental and climate change , such as sustainable procurement, recycle-able and re-usable materials, opportunities to improve water treatment, greening the environment (for example, more trees and planters), monitoring and evaluation of environment measures, compact and low-carbon urban design.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

26.     The city centre targeted rate portfolio budget 2022/2023 will be provided to the Finance and Performance Committee as part of the annual plan process.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

27.     Auckland’s city centre falls within the Waitematā Local Board boundaries. The local board is consulted during the development of relevant city centre projects, some of which receive funding through the city centre targeted rate. Initiatives are consistent with the Waitematā Local Board Plan 2020.

28.     Staff advised the Waitematā local board that an update of the targeted rate portfolio 2022/2023 would be part of the annual plan process to the Waitematā local board workshop on 22 February 2022.

Tauākī whakaaweawe Māori

Māori impact statement

29.     The city centre targeted rate can be used to fund development projects that contribute to Māori outcomes by enabling manaakitanga (hospitality), kaitiakitanga (environmental guardianship), and highlighting our unique cultural heritage by incorporating Māori design elements.

30.     Mana whenua consultation occurs as part of the development and delivery of all city centre projects, on a project by project basis, via the monthly Infrastructure and Environmental Services Mana Whenua Hui. and other site or project specific hui.

31.     A Ngāti Whātua o Ōrākei representative is part of the Auckland City Centre Advisory Board membership

Ngā ritenga ā-pūtea

Financial implications

32.     The city centre targeted rate was approved by the Governing Body at its meeting in June 2021:  resolution (GB/2021/78)

33.     All changes to the portfolio budget have been achieved within the existing city centre targeted rate portfolio budget to 2031.

34.     The city centre targeted rate forms an important part of city centre spend, complementing general rates as set out in the Long-term Plan 2021-2031.

35.     In the event that we are unable to spend the 2022/2023 budget (for example due to Covid-19 impacts) the residual amount will be deferred to later years and remains within the ringfenced budget for the targeted rate.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

36.     The city centre targeted rate portfolio includes projects at various stages, including projects that do not yet have a defined scope or conceptual design. As such, the forecast budgets and delivery timeframes are subject to change and are subject to market cost escalation.

37.     All projects are actively managed, so substantive changes can be foreseen and managed.

38.     There is a contingency budget line within the city centre targeted rate portfolio (Additional Programme Fund) which sets aside funds to mitigate unforeseen financial issues that cannot be resolved within a project’s individual budget.

Ngā koringa ā-muri

Next steps

39.     The draft city centre targeted rate portfolio budget 2022/2023 will be incorporated as part of the council’s annual plan process.

40.     Public consultation on the annual plan will take place between 28 February and 28 March 2022. Adoption. of the final Annual Budget by the Governing Body will take place in June 2022.

 

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

The city centre targeted rate portfolio budget 2022/2023

19

b

City centre targeted rate portfolio projects update

21

     

Ngā kaihaina

Signatories

Author

Liz Nicholls – Manager Investments Programmes

Authoriser

John Dunshea - General Manager Development Programmes Office

 

 



Auckland City Centre Advisory Board

28 February 2022

 

 

Table

Description automatically generated

Table

Description automatically generated


Auckland City Centre Advisory Board

28 February 2022

 

 

Table

Description automatically generated with medium confidence

Table

Description automatically generated

A picture containing table

Description automatically generated

Table

Description automatically generated

Graphical user interface

Description automatically generated with low confidence

Graphical user interface, application

Description automatically generated

Text

Description automatically generated with medium confidence

Table

Description automatically generated


Auckland City Centre Advisory Board

28 February 2022

 

 

Update on the Wai Horotiu Queen Street Project

File No.: CP2022/01937

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To update the Auckland City Centre Advisory Board on the Wai Horotiu Queen Street project.

Whakarāpopototanga matua

Executive summary

2.       The Wai Horotiu Queen Street project is a key step towards the City Centre Masterplan vision.

3.       In June 2021, the project delivered zone 1, from Customs Street to Shortland Street, as part of the Waka Kotahi Innovating Streets for People programme. In early December 2021, zone 2, the Fort Street pocket park, was opened to the public.

4.       Construction for the project from Shortland Street to Mayoral Drive, started in January 2022 and will be completed in September 2022. The design features a substantial increase and enhancement to the public realm through footpath build-out and provision of a multi-use path on the eastern side of Queen Street.

5.       At the 13 December 2021 Auckland City Centre Advisory Board workshop, staff provided an update on the final designs, feedback from recent public consultation, and cost pressures on the project budget. Members present supported a contribution of between $2.5 million and $5 million from the city centre targeted rate to enable the project to proceed with the current proposed design, quality and scope. The budget allocation will be included in the update of the city centre targeted rate portfolio budget as part of the Annual Budget 2022/2023, and reported to the board in the separate report at its 28 February 2022 meeting.

6.       Construction is on track despite COVID-19 impacts on labour and material availability, as well as new health and safety requirements. Works are progressing on the planning for the Essential Vehicle Area, parking enforcement, Key Performance Indicator baseline monitoring, as well as responding to antisocial behaviour issues on Fort Street.

7.       Staff will continue to provide regular memorandum updates to the board as the project progresses.

 

Ngā tūtohunga

Recommendation/s

That the Auckland City Centre Advisory Board:

a)      note the update on the Wai Horotiu Queen Street project.

 

Horopaki

Context

8.       The City Centre Masterplan 2020 was adopted by the Planning Committee in March 2020 (resolution PLA/2020/17). It is a place-based document that gives effect to the expectations of the city centre in the Auckland Plan. The masterplan is shaped by targets and direction from Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan.


 

9.       At the core of the City Centre Masterplan is Access for Everyone (A4E), a concept to transform how people and freight move in the city centre. By enabling a decisive mode-shift away from private vehicles and prioritising active modes and public transport, it aims to make better use of finite city centre space to improve priority for people and the quality of the environment.

10.     The Wai Horotiu Queen Street project is a key step towards the City Centre Masterplan vision and will deliver incremental pedestrian priority and network changes while we plan for the future, in parallel with other major infrastructure works.

11.     The extent of the project is on Queen Street, from Customs Street to Mayoral Drive, including road and side street intersections.

12.     In June 2021, the project delivered zone 1, from Customs Street to Shortland Street, as part of the Waka Kotahi Innovating Streets for People programme. In early December, zone 2, the Fort Street pocket park, was opened to the public.

A group of people sitting on a bench in the new pocket park


Description automatically generated with low confidence

13.     The next phase of the project, between Shortland Street and Mayoral Drive, will deliver on the climate action to reduce greenhouse gas emissions and adapt to the impacts of climate change, funded as part of Auckland Council’s Recovery Budget 2021-2031.

14.     Feedback was received on the completed zone 1 works through the online Social Pinpoint tool from 9 July to 6 August 2021. In response to the community feedback received, the Project Steering Group has decided to progress the design from Shortland Street to Mayoral Drive all at once, rather than in stages.

15.     The Waitematā Local Board also provided feedback on 20 October 2021 (resolution WTM/2021/160).

16.     The concept design for Shortland Street to Mayoral Drive was shared with the community from 22 September to 22 October 2021. Feedback was sought on the proposed traffic interventions. We received 460 submissions from individuals and businesses during the public consultation period, the proposed transport changes were largely supported during consultation. The consultation report and decisions can be found here.

17.     The Waitematā Local Board delegated members also provided feedback on the proposal on 20 October 2021 (resolution WTM/2021/160).

18.     Construction has started for the project in January 2022 and is planned to be finished in September 2022. The works will deliver:

·        a substantial increase and enhancement to the public realm through footpath build-out and provision of a multi-use path on the eastern side of Queen Street

·        the palette of materials including paving, planters and furniture, will be of a good, robust quality that is reflective of Queen Street as the city centre’s premiere street, and contribute to a simple, uncluttered and attractive streetscape.

Tātaritanga me ngā tohutohu

Analysis and advice

19.     At its workshop on 13 December 2021, staff provided an update to the Auckland City Centre Advisory Board on the Wai Horotiu Queen Street project including final designs, feedback from recent public consultation, and cost pressures on the project budget.

20.     The cost estimate based on detailed design for the works indicated a budget shortfall of between $2.5 million to $5 million. Potential mitigation approaches include:

·        increase budget – additional funding from the city centre targeted rate

·        reduce scope and substitution of materials and methods

·        reduce extent of works – omission of works between Wakefield Street and Mayoral Drive.

21.     The cost increase is due to an escalation of the estimated direct costs of material, plant and labour following the detailed design development and through the resolution of technical detail impacting the scope, which was unknown at the time of initial costing. We are also experiencing supply chain cost increases as well as increased lead times because of global supply issues.

22.     Specific examples of these cost increases are the larger areas of new footpath buildout than those contemplated in the concept design or the inclusion of an extensive network of surface drainage necessary to manage 100-year flooding risks. Certain design decisions have also been made to minimise construction disruption, which in turn have an impact on costs. These items include the development of pre-cast concrete kerbing which is a more expensive option to site-poured concrete which gives the advantage of reducing disruption.

23.     Staff sought the Auckland City Centre Advisory Board members’ insights to inform staff decision-making on next steps for the project. Particular considerations included:

·        the impacts of any changes to design or scope on achieving outcomes for the city centre, in line with the City Centre Masterplan

·        potential funding for the project from the city centre targeted rate.

24.     The Board supported a contribution of between $2.5 million and $5 million from the city centre targeted rate to enable the project to proceed with the current proposed design, quality and scope. The feedback from the board is included in Attachment A.

25.     The city centre targeted rate budget allocation will be included in the update of the city centre targeted rate portfolio budget 2022/2023 part of Auckland Council’s 2022/2023 annual plan process, and reported to the board in the separate report at its 28 February 2022 meeting.


 

Project progress

26.     Construction work started as planned on 10 January 2022, with the removal of the built-up median island and carriageway resurfacing work to enable changing the road alignment in the block between Wellesley Street and Wakefield Street. This was completed successfully, and work has now started building-out the new footpath areas on the western side of the street between Wellesley Street and Mayoral Drive. Construction will quickly move along the section, and we expect to complete paving work on this section by April 2022.

27.     While physical works are happening on the ground, further work is taking place in developing the Essential Vehicle Area (EVA). This includes developing appropriate signage with Waka Kotahi, designing enforcement camera infrastructure, and developing a system to automate the issuing of infringement notices that draws from the national vehicle registry. The EVA is scheduled to be fully operational from late-2022.

28.     To support other enforcement initiatives, once the new road layout is implemented, 60 new parking sensors are to be installed in various Queen Street Auckland Transport parking locations. These sensors will be wirelessly linked to the Parkable application and provide user insights and enforcement opportunities.

29.     As part of the project's benefit realisation plan, new baseline data on our defined key performance indicators (KPI’s) was gathered in December 2021 and early January 2022. This data point is important in providing a pre-construction snapshot, however, in the context of the COVID-19 and with Auckland in the Red level of the COVID-19 protection framework, the information gathered may be difficult to draw definitive conclusions from.

30.     An area of significant concern is regarding antisocial behaviour surrounding the Fort Street Pocket Park. A working group comprising of Auckland Council, Auckland Transport, NZ Police, Auckland City Mission, and Heart of the City are meeting regularly to address the issues. NZ Police are leading the response, but the project team will continue to look at activation and Crime Prevention Through Environmental Design initiatives, including better lighting, iterations to the pocket park layout, and if necessary additional CCTV to help improve the situation.

Tauākī whakaaweawe āhuarangi

Climate impact statement

31.     The project delivers on the council’s Long-term Plan 2021-2031 initiative to demonstrate low-emissions, integrated and people-centric transport solutions through trials and tactical interventions for a Zero Emissions Queen Street Valley and support other tactical interventions for encouraging streets for people across the region.

32.     The project contributes to the following actions in Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan, shown in Table 1.

 

Table 1: Contributions of the project to actions in Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan

 

Action/sub-action

Project contribution

Action B9: Establish and rapidly scale low carbon, resilient precincts across Auckland

Sub-action: Deliver a zero emissions area in the City Centre and apply learnings to other urban centres.

The project will reduce discretionary vehicle travel in Queen Street, and contribute to the reduction of emissions.

Action T1: Changing the way we all travel

Sub-action: Encourage the use of public transport, walking and micro-mobility devices, rather than driving.

The project will improve pedestrian priority and amenity on Queen Street, making it safer and more attractive to walk.

Action T2: Make travelling by public transport more appealing than using personal vehicles

Sub-action: Make travel by public transport faster, more frequent and reliable over a wider network.

The project will reduce bus journey time, improve reliability and service levels on Queen Street.

Action T4: Improve safety, connectivity, and amenity of walking infrastructure

Sub-action: Prioritise improvements to walking infrastructure at major destinations including public transport hubs and educational facilities

Queen Street is a major walking route between transport hubs in the city centre. The project will improve the safety and amenity for pedestrians.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

33.     Auckland Council is the lead agency on this project and is responsible for defining the objectives and scope for the project, as well as accountable for achieving the benefits.

34.     Auckland Transport is supporting the delivery of this project by using its levers to help achieve the benefits of the project as identified by council, while acting in accordance with its duties as road controlling authority, as well as supplying resource and subject matter expertise.

35.     Auckland Council and Auckland Transport are taking a combined approach to develop the urban design and meet the traffic network requirements with a high level of public involvement.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

36.     Within the Waitematā Local Board area, Queen Street and the city centre are undergoing major transformation. The local board receives regular updates on the project and other developments in the city centre as they progress.

37.     The local board resolved to strongly support the project at its 20 July 2021 meeting (resolution WTM/2021/160).

38.     The Waitematā Local Board delegated members provided feedback on the proposal from Shortland Street to Mayoral Drive on 20 October 2021 (resolution WTM/2021/160).

39.     The local board was also updated on progress at its workshop on 22 February 2022.


 

Tauākī whakaaweawe Māori

Māori impact statement

40.     This project will progress the City Centre Masterplan vision for Wai Horotiu Queen Street Valley. The development of the City Centre Masterplan included a series of hui with the Mana Whenua Kaitiaki Forum, led by the Culture and Identity Pou. This engagement shaped one of the 10 city centre-wide outcomes (Tāmaki Makaurau – our place in the world) and a new transformational move (Māori outcomes).

41.     The project was presented at the Infrastructure and Environmental Services mana whenua hui on 14 May 2021. Expressions of interest have been sought from mana whenua to be part of the project team.

42.     The team has engaged with the following iwi authorities who have expressed interests in the project:

·    Ngāti Whātua Ōrākei

·    Ngāti Maru

·    Te Ākitai Waiohua.

Ngā ritenga ā-pūtea

Financial implications

43.     The budget for the Wai Horotiu Queen Street project is funded by the following sources:

·    city centre targeted rate: $600,000 (CEN/2020/16) contributing to the Innovating Streets for People programme

·    city centre targeted rate: up to $5,000,000 included in the update of the city centre targeted rate portfolio budget 2022/2023

·    Waka Kotahi - Innovating Streets Fund: $900,000 (completion in the 2020/2021 financial year included co-design and communications)

·    Queen Street Zero Emission Area: $6,115,000 proposed in the Long-term Plan 2021-2031

·    the balance of the project is proposed to be funded by the regional City Centre Programme budget.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

44.     The issues and risks are outlined, and a mitigation strategy has been developed to effectively manage them. The risks and mitigations are outlined in Table 2.

Table 2: Wai Horotiu Queen Street project risks and mitigations

Issue/Risk

Description

Mitigation

Stakeholder opposition

 

Stakeholder resistance to the proposed changes, including traffic changes.

Managing and responding to stakeholder concerns quickly with dedicated engagement to address concerns. Good communication plan that conveys a consistent and transparent message to stakeholders.

Enforcement and compliance

 

Insufficient traffic enforcement activities, non-compliant traffic behaviours remain widespread and undermine project objectives.

Increase the presence of traffic wardens and strategic placement of enforcement cameras to manage the enforcement of time limits and vehicle use. Issue infringement notices for non-compliant road rule behaviour with a low level of tolerance.

Maintenance

 

Insufficient levels of maintenance result in poor user experience, perception that the implementations are of low quality, cumulative effects of antisocial behaviour.

The design of implementations should enable cost-effective maintenance or care. Ensure adequate operational funding is available to maintain high service levels. Comprehensive maintenance plan developed and supported by supply partners to ensure landscaping continues to look good long after the project is completed. Develop community stewardship where people show pride in their area and care for community facilities or report issues for attention.

Construction Impacts

 

Construction negatively impacting on the community

An integrated programme of development response commencing with construction staging and pre-construction comms for each segment of work, direct engagement with impacted stakeholders, travel demand management and activations, followed up with continuous monitoring and evaluation to inform necessary changes to approach.

Impact on public transport

Street changes may result in public transport delay and poor customer experience

Changes to prioritise movement of people and public transport and discourage discretionary vehicles.

Plan and deliver Travel Demand Management programme to encourage behaviour change.

Cost Escalation

Increase in construction costs due to ongoing inflationary market forces associated with COVID-19 labour and material shortages

Ongoing monitoring of cost, continuing to look for cost efficiency and substitution of materials or methodologies as required.

 

Ngā koringa ā-muri

Next steps

45.     From here, construction will move southwards up to Mayoral Drive and work in this section of the street will be completed by the end of April 2022. We will then relocate work crews to the eastern side of the street and commence construction outside of the St James theatre site. The full block between Wellesley Street and Mayoral drive will be completed by early August 2022. 

46.     In May 2022 we will also begin works in the block of Queen Street between Shortland Street and Victoria Street working southwards.

47.     Staff will continue to provide regular memorandum updates to the board as the project progresses.


 

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

ACCAB insights 13 December 2021 workshop

37

     

Ngā kaihaina

Signatories

Author

Jenny Larking – Head of City Centre Programmes 

Authoriser

John Dunshea - General Manager Development Programmes Office

 

 


Auckland City Centre Advisory Board

28 February 2022

 

 

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated