I hereby give notice that an ordinary meeting of the Howick Local Board will be held on:
Date: Time: Meeting Room: Venue:
|
Monday, 19 September 2022 6.00pm Howick Local
Board Meeting Room |
Howick Local Board
OPEN ADDENDUM AGENDA
|
MEMBERSHIP
Chairperson |
Adele White |
|
Deputy Chairperson |
John Spiller |
|
Members |
Katrina Bungard |
|
|
Bo Burns |
|
|
David Collings |
|
|
Bruce Kendall |
|
|
Mike Turinsky |
|
|
Bob Wichman |
|
|
Peter Young, JP |
|
(Quorum 5 members)
|
|
Matt Fletcher Democracy Advisor
15 September 2022
Contact Telephone: 027 226 0530 Email: matt.fletcher@aucklandcouncil.govt.nz Website: www.aucklandcouncil.govt.nz
|
31 Auckland Transport Update on the Local Board Transport Capital Fund – August 2022 5
32 Howick Local Board feedback on Community Bike Hubs - Te Poka Pū Paihikara i tēnei Hapori 11
File No.: CP2022/14179
Te take mō te pūrongo
Purpose of the report
1. To provide confirmation on which activities can be delivered under the reduced Local Board Transport Capital Fund for Howick Local Board following the Council’s Annual Budget on 29 June 2022.
Whakarāpopototanga matua
Executive summary
2. On 29 June 2022, Auckland Council adopted the Annual Budget. Auckland Transport (AT) is facing significant pressure on operational expenditure principally due to slower recovery of Public Transport (PT) patronage than expected.
3. To address these challenges Auckland Transport, in discussion with the Auckland Council finance team, put through a request for a moderate increase in operating funding in financial year 2022/23, whilst at the same time agreeing to defer capital expenditure by $223 million over the next three years, to help this request.
4. The impact of these reductions for the Local Board Transport Capital Fund (LBTCF) is a reduction from $20 million to $10.3 million for this financial year (2022/23).
5. For the Howick Local Board, this meant the financial year 22/23 allocation was reduced from $1,677,177 to $862,907. The 22/23 allocation was increased to $1,131,302 to cover current contractual commitments.
6. AT Board are considering providing an additional $1,035,707 which would bring budget up to $2,167,009 but the funding would be subject to there being underspend in other AT work programmes.
7. The below table outlines the status of projects resolved by the Howick Local Board:
8. Due
to budget reductions, some of these projects will need to be deferred until
budget becomes available.
Recommendation/s
That the Howick Local Board:
a) progress the following activities this financial year (2022/23):
i) Aviemore to Botany Shared Path construction
ii) The Parade traffic Calming and crossing design and construction
iii) Bucklands Beach The Parade pedestrian crossings design and construction
iv) Bus Shelters design and construction (with budget reduced to $301,614)
v) Bucklands Beach Road pedestrian crossings design only
vi) Bradbury Road traffic calming design only
vii) Picton Street / Ridge Road intersection improvements scheme design only
b) the following activities be deferred until the next financial year (financial year 2023/24) or when budget becomes available:
i) Bucklands Beach Road pedestrian crossings construction
ii) Bradbury Road traffic calming construction
iii) Picton Street / Ridge Road intersection improvements detailed design and construction
Horopaki
Context
9. The financial implications of the reduction in funding for the Local Board Transport Capital Fund (LBTCF) is a reduction from $20 million to $10.3 million for this financial year (2022/23).
10. For Howick Local Board, this means the financial year 22/23 22/23 allocation was reduced from $1,677,177 to $862,907. The 22/23 allocation was increased to $1,131,302 to cover current contractual commitments.
11. AT Board are considering providing an additional $1,035,707 which would bring budget up to $2,167,009 but the funding would be subject to there being underspend in other AT work programmes
12. It is recommended the following activities continue to be delivered this financial year (2022/23):
· Aviemore to Botany Shared Path construction. Contracts are committed and construction is about to start.
· The Parade traffic Calming and crossing design and construction. Design contract is committed, and community engagement is about to begin.
· Bucklands Beach The Parade pedestrian crossings design and construction. Design contract is committed, and community engagement is about to begin.
· Bus Shelters design and construction (with budget reduced to $301,614). Design contract committed and community engagement is about to begin.
· Bucklands Beach Road pedestrian crossings design only. Design contract is committed, and community engagement is about to begin.
· Bradbury Road traffic calming design only. Design contract is committed, and internal consultation is in progress.
· Picton Street / Ridge Road intersection improvements scheme design only. No contractual commitments in place yet but investigation is progressing.
13. It is recommended that the following activities are deferred until the following financial year (FY 2023/24) or when budget becomes available.
· Bucklands Beach Road pedestrian crossings construction
· Bradbury Road traffic calming construction
· Picton Street / Ridge Road intersection improvements detailed design and construction
Strategic alignment
14. The Auckland Transport RLTP budget allows for the LBTCF as a capital budget provided to all local boards by Auckland Council and delivered by Auckland Transport (AT).
15. Local Boards can use this fund to deliver transport infrastructure projects that they believe are important to their own Local Board Plan but are not part of Auckland Transport’s work programme.
16. Any LBTCF projects selected must be safe, must not impede network efficiency, and must be located in the road corridor or on land controlled by Auckland Transport (though projects running through parks can be considered if there is a transport outcome).
Tātaritanga me ngā tohutohu
Analysis and advice
17. The Local Board were presented with advice in regard to the impact of the reduction in budget on the LBTCF at a workshop on Wednesday 24 August 2022.
18. The Howick Local Board discussed the recommendations of Auckland Transport, noting preference to continue to progress those projects close to construction and defer construction of projects currently still in the investigation stage until the following financial year (FY2023/24) or when budget becomes available.
Tauākī whakaaweawe āhuarangi
Climate impact statement
19. Auckland Transport is committed to minimising the negative effects that transport operations have on climate change. This includes encouraging emission neutral modes (walking and cycling) and low emission modes (Public transport and ride sharing).
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
20. The impact of information in this report is mainly confined to AT.
21. Where LBTCF projects are being progressed by Auckland Council’s Community Facilities Group, engagement on progress has taken place. Any further engagement required with other parts of the Council group will be carried out on an individual basis.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
22. AT have workshopped with the Local Board the impacts of budget reductions on the LBTCF projects in the Howick Local Board area.
Tauākī whakaaweawe Māori
Māori impact statement
23. The proposed recommendations in the report have no impacts or opportunities for Māori. Any engagement with Māori, or consideration of impacts and opportunities, will be carried out on an individual project basis.
Ngā ritenga ā-pūtea
Financial implications
24. There will not be enough budget to deliver all projects this financial year as previously planned.
25. AT are seeking direction on which projects the Local Board would like to proceed with this financial year and which projects are to be deferred.
26. AT recommended that the following activities continue this financial year (2022/23):
· Aviemore to Botany Shared Path construction
· The Parade traffic Calming and crossing design and construction
· Bucklands Beach The Parade pedestrian crossings design and construction
· Bus Shelters design and construction (with budget reduced to $301,614)
· Bucklands Beach Road pedestrian crossings design only
· Bradbury Road traffic calming design only
· Picton Street / Ridge Road intersection improvements scheme design only
27. AT recommended that the following activities, be deferred till next financial year (FY 2023/24) or when budget becomes available:
· Bucklands Beach Road pedestrian crossings construction
· Bradbury Road traffic calming construction
· Picton Street / Ridge Road intersection improvements detailed design and construction
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
28. The financial impact on the construction industry and reduced AT income from the drop in PT use has had a domino effect on the delivery of all AT projects including projects within the LBTCF.
29. This report explains those projects recommended to the Local Board to progress within the reduced funding envelope.
Ngā koringa ā-muri
Next steps
30. Once the local board resolutions are finalised, AT will work to contract out the projects as soon as possible.
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Authors |
Jennifer Fraser – Elected Member Relationship Partner - South |
Authorisers |
Ione Afoa – Head of Community Engagement - South |
File No.: CP2022/14181
Te take mō te pūrongo
Purpose of the report
1. To seek formal views from the local board on the Community Bike Hubs - Te Poka Pū Paihikara i tēnei Hapori project.
Whakarāpopototanga matua
Executive summary
2. Community Bike Hubs is a project to accelerate Auckland Transport’s commitment to providing better access to bikes through the establishment of Community Bike Hubs.
3. The project is funded through Auckland Council’s Ngā Tiriti Ngangahau - The Vibrant Streets (formerly Regional Streets for People) programme.
4. In the new Community Bike Hub model, Auckland Transport owns the Bike Hubs and takes responsibility for set-up costs while the community runs and operates the Bike Hubs.
5. This report is seeking views from the local board on:
· what is the local board’s interest and preferred level of engagement in Community Bike Hubs?
· does the local board support the Community Bike Hub approach?
· are there any specific Bike Hub sites in addition to the ones proposed in Attachment A that the local board wants investigated?
· does the local board have any community groups or individuals in particular they would like Auckland Transport to be engaging as part of this project?
6. Auckland Transport will review the formal feedback from local boards. Auckland Transport will then evaluate and confirm Community Bike Hub Operators and progress landowner approvals.
Recommendation/s
That the Howick Local Board:
a) provide their formal views on the Community Bike Hubs project
b) provide their preferred level of engagement in the Community Bike Hubs project
c) provide any additional sites for consideration for Community Bike Hubs
d) provide any community groups or individuals for Auckland Transport to engage with on Community Bike Hubs.
Horopaki
Context
7. The Community Bike Hubs - Te Poka Pū Paihikara i tēnei Hapori project is developing a new model of Bike Hubs that are owned by Auckland Transport and operated by the community.
8. The project seeks to promote the successes of community Bike Hubs by funding the establishment and ongoing operation of Bike Hubs while empowering local communities to run and operate the Bike Hub.
9. Bike Hubs, Bike Kitchens, Bike Spaces and Bike Boxes have been successful community initiatives in Auckland that improve access to bikes by fixing up and redistributing bikes as well as providing events, activations, information and education. These community initiatives are variously supported by Auckland Transport, other Council-Controlled Organisations (CCO), local boards, other agencies and commercial partners and have been shown to be highly successful at the different scales they target.
10. Bike Hubs were identified as the operating model best suited to growth, with strong organisational accountability, consistent hours, wide offerings and deep roots into the community.
11. The Community Bike Hubs project has identified the following locations as being a good fit for the new model:
· Papakura · Grey Lynn · Pakuranga |
· Manukau · Northcote · Epsom |
· Onehunga · Devonport |
12. The project also will scale up existing bike spaces in Mt Roskill and Waiheke into full Bike Hubs.
13. Despite their success and their intention to grow, key barriers to growth have been identified for Bike Hubs such as set-up costs and uncertainty of ongoing funding. Auckland Transport’s Sustainable Mobility team has been leading a programme of work to address these barriers and enable growth of the Bike Hub network.
Tātaritanga me ngā tohutohu
Analysis and advice
15. Bike Hubs have historically been housed in two or three shipping containers and this is the model most appropriate to most locations. However, in some locations, CCO or other agency property, such as a town centre storefront or council facility, exists that could be used for a Bike Hub.
16. Auckland Transport will fully fund these Community Bike Hubs in their first year and will aim in subsequent years to reduce funding to a sustainable level while adding other funding sources such as koha, donated bike sales, other grants or funders and commercial partnerships. Further, Auckland Transport will fully support these Bike Hubs and other existing spaces with dedicated resources, guidance and advice, connections to other Bike Hubs and the wider network, training and upskilling and more.
17. This initiative supports Auckland Council’s strategic goals related to development of alternative modes of transport, especially cycling and its climate change goals. Most local board plans across the region prioritise responses to climate change, including the promotion of alternatives to travelling by car.
18. Auckland Transport recommends that local boards support this initiative. Auckland Transport is seeking feedback and more information on:
· Interest – Does the local board support the Community Bike Hub project?
· Engagement level - Does the board wish to engage in this project. If so, would it like to:
o Collaborate: fund or provide resources and participate as a partner with Auckland Transport (now or in the future)
o Consult: engage actively, express its views and work with Auckland Transport
o Be Informed: Auckland Transport will keep the local board informed about the project’s progress.
· Site selection – Are there Bike Hub sites beyond those proposed in Attachment A that the local board thinks would be worth investigating? Community members have helped identify possible locations in each local board area. This report is seeking local boards to provide specific sites they think would be especially appropriate or inappropriate for this project.
· Community groups – Are there any community groups or individiuals in particular the local board recommends Auckland Transport engage as part of this project?
Tauākī whakaaweawe āhuarangi
Climate impact statement
19. Auckland Transport engages closely with the council on developing strategy, actions and measures to support the outcomes sought by the Auckland Plan 2050, Auckland’s Climate Action Plan and the council’s priorities.
20. Auckland Transport’s core role is in providing attractive alternatives to private vehicle travel, reducing the carbon footprint of its own operations and, to the extent feasible, that of the contracted public transport network.
21. The primary climate change benefit of this plan is that Bike Hubs encourage more people to cycle, reducing the number of car journeys and therefore carbon emissions.
22. The Community Bike Hubs project contributes to Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan as the hubs enable reduced emissions.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
23. This project is engaging with Community Facilties, Parks Sports and Recreation, Eke Panuku and local boards in order to identify options for possible locations.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
24. Workshops were held with local boards throughout August 2022. Informal steering from boards suggest strong support for this project and additional considerations for site selection.
25. This report is seeking formal feedback from impacted local boards.
Tauākī whakaaweawe Māori
Māori impact statement
26. Auckland Transport is committed to meeting its responsibilities under Te Tiriti o Waitangi and its broader legal obligations in being more responsible or effective to Māori.
27. Auckland Transport’s Maori Responsiveness Plan outlines the commitment to 19 mana whenua tribes in delivering effective and well-designed transport policy and solutions for Auckland. We also recognise mataawaka and their representative bodies and our desire to foster a relationship with them. This plan is available on the Auckland Transport website - https://at.govt.nz/about-us/transport-plans-strategies/maori-responsiveness-plan/#about
28. The Community Bike Hubs project has te ao Māori woven throughout. The designs and marketing draw from Māori artists and designs, and the Bike Hub Operating Model explicitly calls out engaging with cultural groups and individuals.
29. There is opportunity for mana whenua to operate and be involved with these Bike Hubs.
Ngā ritenga ā-pūtea
Financial implications
30. Auckland Transport is fully funding the Bike Hubs for the first year of operation, and looking to slowly step down Auckland Transport funding to around 40 per cent of operating expenses in the long term. Auckland Transport expects the shortfall to be made up from sale of bikes, koha, other grants or funders and commercial partnerships.
31. This decision has no financial implications for Howick Local Board at this time as Auckland Transport is funding the bike hub for the first year. If the local board wishes to contribute financially in future the implications will be reported then.
32. Should the local board wish to contribute funding in the future, the project team would welcome a discussion on the matter. The outcome of that discussion would need to be recorded in a decision report, and that report would include detailed information about financial implications.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
33. The proposed decision to proceed with the Community Bike Hub project does not put the Howick Local Board at financial or legal risk. The decision authorises feedback to an Auckland Transport process and that organisation carries the decision-making risk.
Ngā koringa ā-muri
Next steps
34. Auckland Transport will review the formal feedback from local boards. Auckland Transport will then evaluate and confirm community community bike hub operators.
35. An estimate timeline of actions is provided in Table One below.
Table One – Estimated Timeline
Date |
Action |
September 2022 |
Auckland Transport will continue to work on site development and procurement of the physical assets such as containers, tools and fit-out, etc. Local boards provide their formal views on potential sites by report. |
October 2022 |
Auckland Transport evaluates and confirms Bike Hub Operators for Stage 1 Bike Hubs. There is targeted community engagement and hub operator training in the locations selected for Stage 1 Bike Hubs. |
November 2022 |
Stage 1 Community Bike Hubs open. Stage 1 include Bike Hubs already identified as quick turnaround because of strong existing community support and reduced landowner permissions and consenting requirements. |
November - March 2023 |
There is targeted community engagement and Bike Hub operator training in the locations selected for Stage 2 Community Bike Hub delivery. |
April 2023 |
Stage 2 Community Bike Hubs open. These include Bike Hubs with less active support or with consent or permission required. |
March - July 2023 |
There is targeted community engagement and Bike Hub operator training in the locations selected for Stage 3 Community Bike Hub delivery. |
August 2023 |
Stage 3 Community Bike Hubs open. These include Bike Hubs where a greater level of engagement or site permissions or consents are needed. |
July 2024 |
Project funding ends and Community Bike Hubs are supported through standard Sustainable Mobility funding and other funding sources. |
Attachments
No. |
Title |
Page |
a⇩ |
Locations and Proposed Sites |