I hereby give notice that an ordinary meeting of the Henderson-Massey Local Board will be held on:

 

Date:

Time:

Meeting Room:

Venue:

 

Tuesday, 6 December 2022

4.00 pm

Council Chamber
Civic Building L2
1 Smythe Road
Henderson

 

Henderson-Massey Local Board

 

OPEN ADDENDUM AGENDA

 

 

 

 

MEMBERSHIP

 

Chairperson

Chris Carter

 

Deputy Chairperson

Brooke Loader

 

Members

Brenda Brady

 

 

Peter Chan, JP

 

 

Dan Collins

 

 

Dr Will Flavell

 

 

Oscar Kightley

 

 

Ingrid Papau

 

 

(Quorum 4 members)

 

 

 

Brenda Railey

Democracy Advisor

 

6 December 2022

 

Contact Telephone: 021 820 781

Email: brenda.railey@aucklandcouncil.govt.nz

Website: www.aucklandcouncil.govt.nz

 

 


ITEM   TABLE OF CONTENTS            PAGE

 

25        Annual Budget 2023/2024 - feedback on regional topics for consultation                          5

27        Auckland Council’s Performance Report: Henderson-Massey Local Board for quarter one 2022/2023                                                     11

 


Annual Budget 2023/2024 - feedback on regional topics for consultation

File No.: CP2022/16973

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To seek input on the proposed regional consultation content for the Annual Budget 2023/2024 from the local board.

2.       To recommend an additional meeting between 7 and 9 February (to approve local consultation content and a local engagement event).

Whakarāpopototanga matua

Executive summary

3.       Auckland Council will be consulting on both local and regional content as part of the Annual Budget 2023/2024 consultation. This is planned to take place from late February – late March 2023.

4.       This report seeks the views of the local board on priority regional topics that will be included in the Annual Budget 2023/2024 consultation. This includes the four levers that can be used to mitigate council’s operating budget challenge. These four levers are: debt, general rates, operating expenditure, and assets.

5.       The Governing Body will agree regional consultation items on 15 December 2022. Local boards will be asked to approve local consultation content (that is, content relating to the proposed local board agreements) between 7 and 9 February 2023.

6.       The local consultation content will then be incorporated into the Annual Budget 2023/2024 consultation document and supporting information, which is planned to be adopted by the Governing Body in February 2023.

 

Ngā tūtohunga

Recommendation/s

That the Henderson-Massey Local Board:

a)      whakarite / provide feedback on potential regional consultation topics and policies for the Annual Budget 2023/2024.

b)      whakarite / provide feedback on proposed changes to fees and charges in Active Communities – bookable spaces including on the following:

i)    the establishment of standardised baseline fees for services in the Active Communities – Bookable Spaces portfolio across Auckland

ii)   the proposed discount framework across Auckland for:

A)     a consistent peak / off-peak discount;

B)     a consistent discount for regular hirers vs. casual hirers

C)     a standardised community outcomes discount with criteria guided by relevant local boards.

c)       whakaae / approve an additional meeting at 10am on 7 February 2023 at the Henderson-Massey Local Board office to approve local consultation content for the Annual Budget 2023/2024.

 

Horopaki

Context

7.       Auckland Council is required to adopt a 10-year budget every three years and an annual budget in the intervening years.

8.       Each year, every local board makes an agreement with the Governing Body for the delivery and funding of services in the local area. These local board agreements are included in both the 10-year budget and each annual budget.

9.       Auckland Council is required to consult the public on the annual budget (or 10-year budget every three years). The consultation content consists of regional content decided by the Governing Body and local content decided by each local board.

10.     Before the regional consultation content is decided by the Governing Body, local boards have the opportunity to provide their input.

11.     The local consultation content relating to each local board agreement must be included in the consultation document.

12.     Public consultation on the Annual Budget 2023/2024 is planned to take place from late February to late March 2023.

13.     Aucklanders will be able to provide feedback during the consultation period through a variety of channels, which include face-to-face (for spoken and New Zealand sign language interaction) and written.

Tātaritanga me ngā tohutohu

Analysis and advice

14.     The local board is asked to provide feedback on potential levers to mitigate the budget gap for the Annual Budget 2023/2024 consultation. The feedback from the local boards will be collated and provided to the Governing Body to consider when agreeing regional items for consultation on 15 December 2022.

Budget Challenge

15.     For the 2023/2024 financial year, Auckland Council is facing a $295 million operational expenditure challenge.

16.     The Governing Body is considering potential levers that can be used to balance the operating budget: debt, general rates, operating expenditure, and assets.

17.     The Mayoral Proposal will outline the proposed balance of these levers for consultation.

Financial policies for Annual Budget 2023/2024

18.     The local board is asked to provide feedback on potential annual budget-related policies for the Annual Budget 2023/2024 consultation. The feedback from local boards will be collated and provided to the Governing Body to consider when approving annual budget-related policies for consultation on 15 December 2022.

Fees and Charges

19.     A three-year cycle of fee reviews was introduced in the Annual Budget 2022/2023. The reviews will ensure that the cost recovery decisions previously made by the council continue to be met.

20.     In year two of the fee review cycle, a number of fees and charges were reviewed, and changes are proposed to the following:

·        animal management fees

·        some building and resource consenting fees

·        other regulatory fees such as food licensing registration, micro-mobility operator fees and swimming pool inspections

·        cemetery fees (stage two - to ensure an appropriate level of cost recovery is in place for cemetery services. Some further standardisation was also considered.)

·        bookable spaces in council managed pool and leisure facilities.

21.     The review of fees and charges for the Active Communities service has been split into two phases due to the number and complexity of the fees. The existing pricing and discount frameworks currently in place for Active Communities contain variations and inconsistencies for customers interacting with the service.

22.     In the first phase, fees for use of bookable spaces in council-managed pool and leisure facilities have been reviewed, with a focus on standardisation.  The second stage, planned for 2024/2025, will include a review of the remaining fees for Active Communities services, including the appropriate level of cost recovery for all fees.

23.     Active Communities – Bookable Spaces includes land and aquatic bookable spaces, such as basketball courts, squash courts, badminton courts, swimming pools, dive pools, stadiums, recreational halls, and rooms available at sites within the Active Communities business.

24.     The purpose of this review is to provide:

a)      a standardised baseline fee rate for like services

b)      a standardised discount framework with:

o   a consistent peak / off-peak discount

o   consolidation and standardisation of Casual/Regular and Standard/User Group hire rates

o   simplification of the discounts targeting specific community outcomes (e.g. youth focus, disability focus, community groups, etc).

25.     Some local boards may not have these facilities in their local board area but may still want to provide feedback on their nearest bookable spaces.

26.     As provided for in the Revenue and Financing Policy, other regulatory fees and charges will increase in line with the council’s cost inflation where necessary to maintain cost recovery.

Other rating matters

27.     The following rating issues and policies are also being presented to the Governing Body for consideration for consultation, not all these issues will be relevant to all local boards:

·        amendment to Community Occupancy Guidelines

·        targeted rate charges for non-standard refuse bins (in the former Auckland (ACC) and Manukau (MCC) city councils areas)

·        introduction of a fee for swapping bin sizes

·        rollout of food scraps service and further standardisation of waste services and targeted rates

·        changes to Waste management targeted rates

·        support for papakāinga development on general title land

·        changes to swimming/spa pool inspections targeted rate and fees

·        changes to the Rodney Drainage District Targeted Rate

·        changes to the Climate Action Targeted Rate.

Local Consultation Content

28.     Local boards will be asked to approve local consultation content between 7 and 9 February 2023. This will allow time for local boards to consider any impacts of the proposed regional consultation content on the local board area.

29.     If the local board does not have a meeting scheduled in this time, an additional meeting will be required.

Tauākī whakaaweawe āhuarangi

Climate impact statement

30.     The decision to consult is procedural in nature, meaning any climate change impacts will be negligible. These decisions are unlikely to result in any identifiable changes to greenhouse gas emissions. The effects of climate change will not impact the decisions.

31.     Some of the proposed initiatives or projects included in the consultation content may have climate change impacts. The impacts of any initiatives or projects Auckland Council chooses to progress as a result of this consultation will be assessed as part of the relevant reporting requirements. 

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

32.     The Annual Budget 2023/2024 is an Auckland Council group document and will include budgets at a consolidated group level.

33.     Consultation items and updates to budgets to reflect decisions and new information may include items from across the group. This will be reflected in the report on regional consultation items going to the Governing Body on 15 December 2022.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

34.     Local board members were invited to attend two Annual Budget 2023/2024 briefings summarising topics discussed at Governing Body workshops. Local board chairs have been invited to the Governing Body Annual Budget workshop on 7 December 2022.

35.     Local boards will have further opportunities to provide information and views as the Annual Budget 2023/2024 process progresses.

36.     Aucklanders will have the opportunity to give feedback on regional and local proposals contained in the budget. All feedback received from submitters residing in the local board area will be analysed by staff and made available for consideration by the local board, prior to the local board finalising its local board agreement.

Tauākī whakaaweawe Māori

Māori impact statement

37.     Many local board decisions are of importance to and impact on Māori. The local board agreement and Annual Budget 2023/2024 are important tools that enable and can demonstrate council’s responsiveness to Māori. The local board plan adopted in November 2020 forms the basis for local priorities.

38.     The approach to Māori engagement for Annual Budget 2023/2024 will be finalised once consultation topics are confirmed, including development of bespoke materials.

39.     There is a need to continue to build local board relationships with iwi and the wider Māori community. Ongoing conversations will assist the local board and Māori to understand each other’s priorities and challenges.

Ngā ritenga ā-pūtea

Financial implications

40.     The local board provides input to regional plans and proposals. There will be information in the council’s consultation material for each plan or proposal with the financial implications of each option outlined for consideration.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

41.     There is a statutory requirement for content relating to each local board agreement to be included in the Annual Budget 2023/2024 consultation document. The local board must approve its local consultation content by close of business on 9 February 2023 in order for it to be formatted and reviewed in time to be incorporated into the Annual Budget 2023/2024 consultation document and supporting information.

Ngā koringa ā-muri

Next steps

42.     The Governing Body will adopt the consultation document and supporting information material and approve the consultation approach for the Annual Budget 2023/2024 in February 2023.

43.     Following consultation, the Governing Body will agree the local board agreements with the local boards and adopt the final Annual Budget 2023/2024 in June 2023.

Ngā tāpirihanga

Attachments

There are no attachments for this report.      

Ngā kaihaina

Signatories

Authors

Renee Burgers - Lead Advisor Plans and Programmes

Phoebe Peguero - Senior Advisor Operations and Policy

Authorisers

Louise Mason - General Manager Local Board Services

Adam Milina - Local Area Manager

 

 


Auckland Council’s Performance Report: Henderson-Massey Local Board for quarter one 2022/2023

File No.: CP2022/16508

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To provide the Henderson-Massey Local Board with an integrated performance report for quarter one, 1 July-30 September 2022.

Whakarāpopototanga matua

Executive summary

2.       This report includes financial performance, progress against work programmes, key challenges the board should be aware of and any risks to delivery against the 2022/2023 work programme.

3.       The key activity updates from this period are:

·    delivery of the Henderson Christmas Festival: Planning is on track and the event will be delivered on Saturday, 10 December 2022 in the Henderson Town Centre.

·    Hoani Waititi Marae Trust: Kaiwhakaawe contribution to Waitākere Ki Tua action plan. A new funding agreement has been negotiated and Hoani Waititi Marae and the kaiwhakaawe contribution to Waitakere Ki Tua has been clarified and agreed.

·    Fred Taylor Park – upgrade sports field and associated lighting to meet FIFA standards in preparation for the 2023 Women’s World Cup: Physical works have started onsite. The next steps will be to carry out the foundation drilling and install the thrusting/trenching ducts.

4.       All operating departments with agreed work programmes have provided an update against their work programme delivery. Activities are reported with a status of green (on track), amber (some risk or issues, which are being managed) or grey (cancelled, deferred or merged). There are no activities with a red status.

5.       The financial performance report compared to budget 2022/2023 is attached. There are some points for the local board to note: Net operating performance overall for Henderson-Massey local board area is 13 per cent under budget for the quarter ended September 2022. Operating expenditure of $7.92 million is nine per cent below budget and operating revenue of $1.27 million running at 22 per cent above planned budget levels. Capital expenditure is approximately 16 per cent above budget for the quarter.

6.       The Customer and Community Services capital expenditure budget has been revised to incorporate delayed delivery or earlier commencement of individual projects or other changes that are of material value.

Ngā tūtohunga

Recommendation/s

That the Henderson-Massey Local Board:

a)       receive the performance report for quarter one ending 30 September 2022.

 

Horopaki

Context

7.       The Henderson-Massey Local Board has an approved 2022/2023 work programme for the following operating departments:

·    Customer and Community Services

·    Infrastructure and Environmental Services

·    Plans and Places

·    Tātaki Auckland Unlimited.

8.       Since the work programmes were approved the Customer and Communities Services directorate has been restructured. Regional Service Planning, Investment and Partnerships was renamed Regional Services and Strategy, and two new departments were created - Parks and Community Facilities and Active Communities. Units from the previous departments Community Facilities and Parks, Sports and Recreation were incorporated into the two new departments. The table below shows the distribution:

Table 1: Changes to Departments in Customer and Communities Services directorate Previous Department - Unit

Current Department - Unit

Parks, Sports and Recreation – Active Recreation

Active Communities – Leisure

Active Communities – Sport and Recreation

Community Facilities – Operations

Parks and Community Facilities – Operations

Community Facilities – Project Delivery

Parks and Community Facilities – Project Delivery

Parks, Sports and Recreation – Park Services

Parks and Community Facilities – Specialist Operations

9.       The graph below shows how the work programme activities meet Local Board Plan outcomes. Activities that are not part of the approved work programme but contribute towards the local board outcomes, such as advocacy by the local board, are not captured in this graph.

Graph 1: Work programme activities by outcome

 

10.     The graph below shows the activity status of activities which shows the stage of the activity in each departments the work programmes. The number of activity lines differ by department as approved in the local board work programmes.

Tātaritanga me ngā tohutohu

Analysis and advice

Local Board Work Programme Snapshot

11.     The graph below identifies work programme activity by RAG status (red, amber, green and grey) which measures the performance of the activity. It shows the percentage of work programme activities that are on track (green), in progress but with issues that are being managed (amber), and activities that have significant issues (red) and activities that have been cancelled/deferred/merged (grey).

Graph 2: Work programme by RAG status


12.     The graph below shows the activity status of activities which shows the stage of the activity in each departments the work programmes. The number of activity lines differ by department as approved in the local board work programmes.

Graph 3: Work programme by activity status and department

Key activity updates

13.     Te Wai O Pareira: The first quarter involved community engagement and finalising the group’s response to the Watercare Wastewater Network Strategy revision. Te Wai O Pareira have been monitoring the quantity of high-density sewage overflows and sending updated emails to the Local Board, Watercare, Healthy Waters, Central Government politicians and Councillors around the impacts of recent heavy rainfall and housing intensification.

Tauākī whakaaweawe āhuarangi

Climate impact statement

14.     Receiving performance monitoring reports will not result in any identifiable changes to greenhouse gas emissions.

15.     Work programmes were approved in June 2022 and delivery is underway. Should significant changes to any projects be required, climate change impacts will be assessed as part of the relevant reporting requirements. Any changes to the timing of approved projects are unlikely to result in changes to emissions.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

16.     When developing the work programmes council group impacts and views are presented to the boards. As this is an information only report there are no further impacts identified.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

17.     This report informs the Henderson-Massey Local Board of the performance for ending 30 September 2022.

Tauākī whakaaweawe Māori

Māori impact statement

18.     Hoani Waititi Marae Trust: Kaiwhakaawe contribution to Waitākere Ki Tua action plan: New funding agreement negotiated and clarification over the contribution from Hoani Waititi Marae and the kaiwhakaawe contribution to Waitakere Ki Tua has been clarified and agreed.

19.     Whakatipu i te reo Māori – we grow the Māori language: Te Wiki O Te Reo Māori was celebrated across Henderson-Massey with libraries hosting a te reo story time. All three sessions were well attended by local whanau and early childhood providers, with tamariki hearing stories and learning action songs in te reo, as well as receiving take-home packs with more educational resources to further their learning.

20.     Kaitiaki Project – Harakeke: In quarter one, the harakeke (flax garden beds) installed at Te Rangi Hiroa Park in March 2022 were maintained to ensure readiness for planting the harakeke (flax) as soon as this can be arranged. Work will continue with local weavers to identify the preferred cultivars of harakeke and pīngao to be planted.

Ngā ritenga ā-pūtea

Financial implications

21.     This report is provided to enable the Henderson-Massey Local Board to monitor the organisation’s progress and performance in delivering the 2022/2023 work programmes. There are no financial implications associated with this report.

Financial Performance

22.     Operating expenditure of $7.92 million is $804,000 below budget overall. This is mainly due to lower maintenance /operating costs for community and parks assets. Locally Driven initiatives (LDI) programmes are $114,000 below budget mainly because of no community grants rounds exercised in quarter and delays in completing funding agreements for the Pest Free Te Atatū Coordinator and Whakapiki te mauri o pukearuhe.

23.     Operating revenue of $1.27 million is $230,000 above budget. This is mainly as a result of higher visitor number for learn to swim programmes and aquatics at West Wave Aquatic facility with the ending of COVID19 restrictions.

24.     Capital Expenditure of $2.5 million is above budget by $352,000. Progress on Te Whau pathway (section 5) and on the comprehensive renewal work at West Wave Aquatic being the main contributing factors

25.     The financial report for the three months ended September 2022 for the Henderson Massey local board area is in Attachment B.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

26.     While the risk of non-delivery of the entire work programme is rare, the likelihood for risk relating to individual activities does vary. Capital projects for instance, are susceptible to more risk as on-time and on-budget delivery is dependent on weather conditions, approvals (e.g., building consents) and is susceptible to market conditions.

27.     Information about any significant risks and how they are being managed and/or mitigated is addressed in the ‘Activities with significant issues’ section.

Ngā koringa ā-muri

Next steps

28.     The local board will receive the next performance update following the end of quarter two, December 2022.

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Henderson-Massey Local Board Work Programme

17

b

Financial Summary - 1 July-30 September 2022

57

     

Ngā kaihaina

Signatories

Authors

Michelle Knudsen - Lease Advisor

Authorisers

Louise Mason - General Manager Local Board Services

Adam Milina - Local Area Manager

 

 



PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator



PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator