I hereby give notice that an ordinary meeting of the Maungakiekie-Tāmaki Local Board will be held on:
Date: Time: Meeting Room: Venue:
|
Tuesday, 28 February 2023 1.00pm Local Board
Office |
Maungakiekie-Tāmaki Local Board
OPEN AGENDA
|
MEMBERSHIP
Chairperson |
Maria Meredith |
Deputy Chairperson |
Debbie Burrows |
Members |
Don Allan |
|
Nerissa Henry |
|
Chris Makoare |
|
Peter McGlashan |
|
Tony Woodcock |
(Quorum 4 members)
|
|
Jessica Prasad Democracy Advisor
23 February 2023
Contact Telephone: 027 228 0253 Email: Jessica.prasad@aucklandcouncil.govt.nz Website: www.aucklandcouncil.govt.nz
|
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
1 Nau mai | Welcome 5
2 Ngā Tamōtanga | Apologies 5
3 Te Whakapuaki i te Whai Pānga | Declaration of Interest 5
4 Te Whakaū i ngā Āmiki | Confirmation of Minutes 5
5 He Tamōtanga Motuhake | Leave of Absence 5
6 Te Mihi | Acknowledgements 5
7 Ngā Petihana | Petitions 5
8 Ngā Tono Whakaaturanga | Deputations 5
8.1 Deputation - George Gerrard, Mount Wellington Rugby Football Club 5
9 Te Matapaki Tūmatanui | Public Forum 6
10 Ngā Pakihi Autaia | Extraordinary Business 6
11 Governing Body Member's Update 9
12 Chairperson's Report 29
13 Board Member's Reports 35
14 Auckland Council's Performance Report: Maungakiekie-Tāmaki Local Board for quarter two 2022/2023 39
15 Draft Contributions Policy 2022, Variation A 81
16 Annual Auckland Council Group Māori Outcomes Report: Te Pūrongo a Te Kaunihera o Tāmaki Makaurau Ngā Huanga Māori 2021-2022. 91
17 Urgent Decision - Local Board Feedback on the Resource management reform: Natural and Built Enviroment Bill and Spatial Planning Bill 93
18 Urgent Decision - Local Board Feedback on the Draft Future for Local Government report 123
19 Urgent Decision - Local Board Feedback on the Justice Committee inquiry into the 2022 Local Government elections 133
20 Urgent Decision - Local Board Feedback on the Sale and Supply of Alcohol (Community Participation) Amendment Bill 145
21 Urgent Decision - Local Board Feedback on the Water Services Entities Bill 2 155
22 Hōtaka Kaupapa / Governance Forward Work Calendar 163
23 Record of Maungakiekie-Tāmaki Local Board Workshops 169
24 Te Whakaaro ki ngā Take Pūtea e Autaia ana | Consideration of Extraordinary Items
PUBLIC EXCLUDED
25 Te Mōtini ā-Tukanga hei Kaupare i te Marea | Procedural Motion to Exclude the Public 177
14 Auckland Council's Performance Report: Maungakiekie-Tāmaki Local Board for quarter two 2022/2023
b. Maungakiekie-Tāmaki Operating Performance Financial Summary 177
1 Nau mai | Welcome
At the close of the agenda no apologies had been received.
3 Te Whakapuaki i te Whai Pānga | Declaration of Interest
Members are reminded of the need to be vigilant to stand aside from decision making when a conflict arises between their role as a member and any private or other external interest they might have.
4 Te Whakaū i ngā Āmiki | Confirmation of Minutes
That the Maungakiekie-Tāmaki Local Board: a) confirm the ordinary minutes of its meeting, held on Tuesday, 6 December 2022 and the ordinary minutes of its meeting, held on Tuesday, 7 February 2023, including the confidential section, as a true and correct record.
|
5 He Tamōtanga Motuhake | Leave of Absence
At the close of the agenda no requests for leave of absence had been received.
6 Te Mihi | Acknowledgements
At the close of the agenda no requests for acknowledgements had been received.
7 Ngā Petihana | Petitions
At the close of the agenda no requests to present petitions had been received.
8 Ngā Tono Whakaaturanga | Deputations
Standing Order 7.7 provides for deputations. Those applying for deputations are required to give seven working days notice of subject matter and applications are approved by the Chairperson of the Maungakiekie-Tāmaki Local Board. This means that details relating to deputations can be included in the published agenda. Total speaking time per deputation is ten minutes or as resolved by the meeting.
9 Te Matapaki Tūmatanui | Public Forum
A period of time (approximately 30 minutes) is set aside for members of the public to address the meeting on matters within its delegated authority. A maximum of 3 minutes per item is allowed, following which there may be questions from members.
At the close of the agenda no requests for public forum had been received.
10 Ngā Pakihi Autaia | Extraordinary Business
Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (as amended) states:
“An item that is not on the agenda for a meeting may be dealt with at that meeting if-
(a) The local authority by resolution so decides; and
(b) The presiding member explains at the meeting, at a time when it is open to the public,-
(i) The reason why the item is not on the agenda; and
(ii) The reason why the discussion of the item cannot be delayed until a subsequent meeting.”
Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (as amended) states:
“Where an item is not on the agenda for a meeting,-
(a) That item may be discussed at that meeting if-
(i) That item is a minor matter relating to the general business of the local authority; and
(ii) the presiding member explains at the beginning of the meeting, at a time when it is open to the public, that the item will be discussed at the meeting; but
(b) no resolution, decision or recommendation may be made in respect of that item except to refer that item to a subsequent meeting of the local authority for further discussion.”
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Governing Body Member's Update
File No.: CP2023/00804
Te take mō te pūrongo
Purpose of the report
1. To update the Maungakiekie-Tāmaki Local Board on local activities that the Governing Body representative is involved with.
Whakarāpopototanga matua
Executive summary
2. To provide the Governing Body Member an opportunity to update the Maungakiekie-Tāmaki Local Board on regional matters.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) receive the Governing Body Member’s update.
Attachments
No. |
Title |
Page |
a⇩ |
Tuesday 28 February 2023, Maungakiekie-Tāmaki Local Board Business Meeting: Item 11 - Governing Body Member's Update report, document |
11 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authoriser |
Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
File No.: CP2023/00805
Te take mō te pūrongo
Purpose of the report
1. To keep the Maungakiekie-Tāmaki Local Board informed on the local activities that the Chairperson is involved with.
Whakarāpopototanga matua
Executive summary
2. Providing the Chairperson with an opportunity to update the local board on the projects and issues they have been involved with since the last meeting.
Recommendation/s That the Maungakiekie-Tāmaki Local Board: a) receive the Chairperson’s written report for February 2023.
|
Attachments
No. |
Title |
Page |
a⇩ |
Tuesday 7 February 2023, Maungakiekie-Tāmaki Local Board Business Meeting: Item 12 - Chairperson's report,document |
31 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authoriser |
Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
File No.: CP2023/00806
Te take mō te pūrongo
Purpose of the report
1. To keep the Maungakiekie-Tāmaki Local Board informed on the local activities that the local board members are involved with.
Whakarāpopototanga matua
Executive summary
2. Providing board members with an opportunity to update the local board on the projects and issues they have been involved with since the last meeting.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) receive Deputy Chairperson D Burrows written report
Attachments
No. |
Title |
Page |
a⇩ |
Tuesday 28 February 2023, Maungakiekie-Tāmaki Local Board Business Meeting: Item 13 - Deputy Chair Debbie Burrows board member report, document |
37 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authoriser |
Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Auckland Council's Performance Report: Maungakiekie-Tāmaki Local Board for quarter two 2022/2023
File No.: CP2023/01564
Te take mō te pūrongo
Purpose of the report
1. To provide the Maungakiekie-Tāmaki Local Board with an integrated performance report for quarter two, 1 October – 31 December 2022.
Whakarāpopototanga matua
Executive summary
2. This report includes financial performance, progress against work programmes, key challenges the board should be aware of and any risks to delivery against the 2022/2023 work programme.
3. The key activity updates from this period include:
· The Oranga Community Decides participatory budgeting pilot has identified that the community want to prioritise initiatives that will create ‘safer spaces’ and support ‘tamariki under the age of 14 years’ for community delivery in 2023.
· Onehunga and Glen Innes libraries are providing innovative digital support initiatives for students and community members.
· East View Reserve neighbourhood park upgrade is being prepared for physical works to commence in February 2023.
· Wai-o-Taiki Nature Reserve nature trail is almost finished.
· Glen Innes Bike hub was busy through quarter two.
· Maungakiekie Songbird continues to increase membership, with 593 households supporting pest control, native planting and bird life in the area.
4. All operating departments with agreed work programmes have provided an update against their work programme delivery. Activities are reported with a status of green (on track), amber (some risk or issues, which are being managed) or grey (cancelled, deferred, or merged). The following activities are reported with a status of red (behind delivery, significant risk):
· ID26478: Onehunga Bay Reserve
· ID1281: Service Improvement Panmure Community Hall Activation
· ID2833: Te Kete Rukuruku (Māori naming of parks and places) Tranche One
5. Auckland Council (Council) currently has a number of bonds quoted on the NZ Stock Exchange (NZX). As a result, the Council is subject to obligations under the NZX Main Board & Debt Market Listing Rules and the Financial Markets Conduct Act 2013 sections 97 and 461H. These obligations restrict the release of half-year financial reports and results until the Auckland Council Group results are released to the NZX on or about 28 February 2023.
Due to these obligations the financial performance attached to the quarterly report is excluded from the public.
6. The Customer and Community Services capex budget has been revised to incorporate delayed delivery or earlier commencement of individual projects or other changes that are of material value.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) receive the performance report for quarter two ending 31 December 2022.
b) note the financial performance report in Attachment B of the agenda report will remain confidential until after the Auckland Council Group half-year results for 2022/2023 are released to the New Zealand Exchange (NZX), which are expected to be made public on 28 February 2023.
Horopaki
Context
7. The Maungakiekie-Tāmaki Local Board has an approved 2022/2023 work programme for the following operating departments:
· Customer and Community Services
· Infrastructure and Environmental Services
· Tātaki Auckland Unlimited
8. The graph below shows how the work programme activities meet Local Board Plan outcomes. Activities that are not part of the approved work programme but contribute towards the local board outcomes, such as advocacy by the local board, are not captured in this graph. [standard paragraph]
Graph 1: Work programme activities by outcome
Tātaritanga me ngā tohutohu
Analysis and advice
Local Board Work Programme Snapshot
9. The graph below identifies work programme activity by RAG status (red, amber, green and grey) which measures the performance of the activity. It shows the percentage of work programme activities that are on track (green), in progress but with issues that are being managed (amber), and activities that have significant issues (red) and activities that have been cancelled/deferred/merged (grey).
Graph 2: Work programme by RAG status
10. The graph below shows the activity status of activities which shows the stage of the activity in each departments the work programmes. The number of activity lines differ by department as approved in the local board work programmes.
Graph 3: Work programme by activity status and department
Key activity updates
11. Oranga Community Centre worked with a key local leader who supports less fortunate families in Oranga through her community kitchen and food parcel voluntary work. The Kitchen Projects team are exploring options to support this as an entrepreneurial opportunity.
12. The Oranga Community Decides participatory budgeting pilot went live and has been essential in giving the Oranga community a voice to share what they want to see funded in their community. Staff have approval in principle to a match funding proposal sitting with Foundation North to double the grant pool for 'Oranga Decides'. Initiatives that will create ‘safer spaces’ and support ‘tamariki under the age of 14 years’ were selected by communities as the top two priority for 2023. The second round of consultation calling for proposals that will enable these two priorities will open in February 2023.
13. Libraries, digital support - An initiative between Tamaki College and Glen Innes Library began, providing digital support for selected students in the library. Onehunga and Glen Innes library partnered with Kiakaha Digital offering classes in the libraries to help build digital confidence in a friendly and supportive way.
14. East View Reserve - Consents for the neighbourhood park upgrade have been approved and preparation is taking place for construction procurement. Engagement is underway with Mana Whenua on implementation of cultural design elements. Physical works are scheduled to start by February 2023 and expected to be complete by March 2024. Planting and vegetation maintenance in the creek will continue for the next 4 years to allow for a self sustaining ecosystem to be created.
15. Wai-o-Taiki
Nature Reserve nature trail is almost finished. The 10m bridge is in place.
A handrail will be added following engagement with the local community.
16. Panmure Basin play space - Renewal for the existing skatepark surface is currently underway by Eke Panuku. Additional upgrade features for the skatepark will be constructed in summer 2023.
17. Glen Innes Bike Hub was busy through quarter two, despite some unpleasant weather and minor disruptions due to bike lane installation on nearby Taniwha Street. During this quarter, there were 50 operating days, 602 visitors, 339 bikes repaired, 56 bikes gifted or sold at low cost to the community, and operations were supported by the equivalent of 46 days of volunteer time. The Glen Innes Bike Hub also supported the opening of Taniwha Reserve with novelty bikes for event attendees to ride.
18. Maungakiekie Songbird continues to increase membership within the defined halo area surrounding Maungakiekie and Cornwall Park. The current membership base is sitting at 593 households, 319 of which fall within the Maungakiekie-Tamaki local board area. These households are provided with free resources ranging from native trees to pest traps (wasp, rodent, and possum), to weta motels and bird feeders. The group held a native plant collection day with the support of the Cornwall Park nursery, giving native plants to more than 75 residents, along with 30 traps.
Activities with significant issues
19. ID26478: Onehunga Bay Reserve – develop dog agility area – After consultation with the local board, direction was given to put the project delivery on hold and carry out further conversations with iwi in conjunction with the local board.
20. ID1281: Service Improvement Panmure Community Hall Activation – Service agreement partners are delivering programmes for the community from Panmure Community Hall and will be able to continue deliver without utilising the funds from this activity line. This underspend can be reallocated toward other local activities.
21. ID2833: Te Kete Rukuruku (Māori naming of parks and places) Tranche One – There are ongoing discussions to resolve shared interests.
22. Additional advice regarding options to absorb any underspent funds will be presented to the board in workshop. Reallocations will be recommended through a future report.
Activities on hold
23. The following work programme activities have been identified by operating departments as on hold:
· ID24239: Taurima Reserve - redevelop park playspace - This project will commence in financial year 2023/2024 and expected to be completed by June 2025
· ID30645: Fergusson Hall - renew full facility – project on hold for investigation and design in future years.
Changes to the local board work programme
Activities with changes
24. The following work programmes activities have changes which been formally approved by the board.
Table 1: Work programmes change formally approved by the board
ID/ Ref |
Work Programme Name |
Activity Name |
Summary of Change |
Resolution number |
295 |
Customer and Community Services: Regional Services and Strategy - Events |
Onehunga Christmas Lights 2022 |
Increase budget by $2906 to cover funding shortfall |
MT/2022/178 |
N/A |
N/A |
Local film revenue |
Reallocate $1,696 from local film revenue to Onehunga Christmas Lights |
MT/2022/178 |
297 |
Customer and Community Services: Grants |
Local Community Grants |
Reallocate $1,696 from local community grants to Onehunga Christmas Lights |
MT/2022/178 |
25. The following work programmes activities have been amended to reflect minor change, the implications of which are reported in the table below. The local board was informed of these minor changes, and they were made by staff under delegation.
Table 2: Minor change to the local board work programmes
Work Programme Name |
Activity Name |
Change |
Reason for change |
|
26068 |
Customer and Community Services: Parks & Community Facilities |
Glen Innes Pool and Leisure Centre – develop carpark extension |
Budget increase of $591,000 ABS CAPEX Renewals
Breakdown as follows: $231,000 in FY23 $160,000 in FY24 $200,000 in FY25 |
The price of the works have come back as a higher cost than the engineers estimates. The project manager has considered the works to be phased over 2 stages. Stage 1 – complete the extension, Stage 2 – renew the existing carpark. Due to the condition of the current carpark being very poor, it does not make sense to stage the works, and rather complete it all at once. By staging we also run the risk of seeking further budget on top of what is being currently asked for. |
24089 |
Customer and Community Services: Parks & Community Facilities |
Manukau Foreshore East – renew cycleway |
Budget decrease $360,000 ABS CAPEX Renewals Breakdown as follows: -$160,000 FY24 -$200,000 FY25 |
The project manager has considered what the best return of value for cost of works is required for this project. The scope that is now going to be proceeded with is less than the original project budget due to a decrease in scope that allows the cycleway to be safe and utilised easily by members of the public. The additional scope would have added an extra level of service to the cycleway which is not required for the desired outcome, and does not provide value for money.
|
24242 |
Customer and Community Services: Parks & Community Facilities |
Maungakiekie-Tamaki – renew park furniture and fixture |
Budget decrease of $220,000 ABS CAPEX Renewals
Breakdown as follows: -$220,000 in FY23 |
The project manager is unable to deliver the full budget this financial year due to delays in design and consenting for the works as well as contractor availability. This budget is able to be reallocated to another project this financial year, but will be reinstated in future years in order for the physical works to be completed.
|
18013
|
Customer and Community Services: Parks & Community Facilities |
Dunkirk Activity Centre – renew facility |
Budget decrease of $11,000 ABS CAPEX Renewals
Breakdown as follows: -$11,000 in FY23 |
The project manager is unable to deliver the full budget this financial year due to the scope not being confirmed on the project at this current stage. This budget can be reallocated to another project this financial year. |
Tauākī whakaaweawe āhuarangi
Climate impact statement
26. Receiving performance monitoring reports will not result in any identifiable changes to greenhouse gas emissions.
27. Work programmes were approved in June 2022 and delivery is underway. Should significant changes to any projects be required, climate change impacts will be assessed as part of the relevant reporting requirements. Any changes to the timing of approved projects are unlikely to result in changes to emissions.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
28. When developing the work programmes council group impacts and views are presented to the boards. As this is an information only report there are no further impacts identified.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
29. This report informs the Maungakiekie-Tāmaki Local Board of the performance for ending 31 December 2022.
Tauākī whakaaweawe Māori
Māori impact statement
30. The local board remains committed to integrating and supporting work that contributes to outcomes for Māori. This includes enhancing partnerships and collaborative ways of working with mana whenua and mataawaka.
31. The Maungakiekie-Tāmaki Local Board Plan 2020 has the lens of Te Ao Māori woven throughout, as well as an outcome that focuses on: Te ao Māori is thriving and visible. The local board plan guides local board decision making, including through the development and delivery of the 2022/2023 work programme.
32. Some of the activities in the local board’s 2022/2023 work programme (Attachment A) have specific impact on the wider Māori community, updates on these activities include:
· ID289: Māori Responsiveness: Ruapōtaka Marae support -- During Quarter 2, staff and contractor continued to support progression of the marae redevelopment project through the Land Owner Approval, reserve re-classification and statutory planning processes. The marae continued their engagement with mana whenua and progressed their resource consent application. Staff and the contractor assisted the marae with their aspirations to develop marae-based services for the local community. The business plan for the Ruapataka social supermarket is near completion following a successful pilot phase in 2022. The marae secured a commercial lease at Colin Maiden Park for a community hauora hub to support whānau wellbeing.
· ID291: Strategic Partnerships Programme – One to one capacity and capability support continued for the rōpū of 13 community groups and organisations with six-month video reporting underway to capture the impact on the organisations and the communities that they serve. 'Oranga Decides', a Participatory Budgeting Pilot enabling the Oranga community to decide on priority areas of need, and put forward new initiatives that address them and have input into distribution of funds is progressing well.
· ID298: Youth empowerment – five community groups have been funded to continue their work with rangatahi to increase their wellbeing, and create pathways for learning and work, including supporting pastoral care, growth of personal passions, entrepreneurial skills and educational/employment pathways.
· ID1482: Māori Participation and partnership in local board decision-making – planning and development of engagement activities is progressing. The local board are reengaging with iwi and Māori to establish relationships for the new term. Upcoming local board planning is a key opportunity for partnership.
Ngā ritenga ā-pūtea
Financial implications
33. This report is provided to enable the Maungakiekie-Tāmaki Local Board to monitor the organisation’s progress and performance in delivering the 2022/2023 work programmes. There are no financial implications associated with this report.
Financial Performance
34. Auckland Council (Council) currently has a number of bonds quoted on the NZ Stock Exchange (NZX). As a result, the Council is subject to obligations under the NZX Main Board & Debt Market Listing Rules and the Financial Markets Conduct Act 2013 sections 97 and 461H. These obligations restrict the release of half-year financial reports and results until the Auckland Council Group results are released to the NZX on 28 February 2023.
Due to these obligations the financial performance attached to the quarterly report is excluded from the public.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
35. While the risk of non-delivery of the entire work programme is rare, the likelihood for risk relating to individual activities does vary. Capital projects for instance, are susceptible to more risk as on-time and on-budget delivery is dependent on weather conditions, approvals (e.g., building consents) and is susceptible to market conditions.
36. Information about any significant risks and how they are being managed and/or mitigated is addressed in the ‘Activities with significant issues’ section.
Ngā koringa ā-muri
Next steps
37. The local board will receive the next performance update following the end of quarter three, 31 March 2023.
Attachments
No. |
Title |
Page |
a⇩ |
Maungakiekie-Tāmaki Local Board Work Programme 2022/2023 Q2 Report |
47 |
b⇩ |
Maungakiekie-Tāmaki Operating Performance Financial Summary - Confidential |
|
Ngā kaihaina
Signatories
Author |
Samantha Tan Rodrigo - Local Board Advisor |
Authorisers |
Louise Mason - General Manager Local Board Services Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Draft Contributions Policy 2022, Variation A
File No.: CP2023/00794
Te take mō te pūrongo
Purpose of the report
1. To seek feedback from local boards on the proposal (draft Contributions Policy 2022, Variation A) to add to the Contributions Policy 2022 projects planned to be delivered beyond 2031 to support growth in Drury.
Whakarāpopototanga matua
Executive summary
2. Development contributions (DCs) are charges that recover from new developments a fair share of the cost of the council’s investment in infrastructure. To date our contributions policy has only recovered a share of cost of our infrastructure investment planned in the next ten years.
3. The council has agreed to add projects beyond 2031 to the Contributions Policy for the Investment Priority Areas identified in the 10-year Budget 2021-2031 in stages starting with Drury. This will ensure early developers pay a fair share of the cost of the cumulative impact of growth on the council’s need to invest in infrastructure.
4. The Contributions Policy 2022 was adopted in December 2021 and provides for the recovery of $399 million of the investment planned to be delivered in Drury in the period to 2031. The contributions price in Drury under this policy, including regional and sub-regional charges, is $22,564 per household equivalent unit (HUE – a house between 100m2 and 249m2). We are now proposing to vary this policy to add investments we plan to deliver beyond 2031 to support development in Drury.
5. The original proposal was consulted on in late 2021 as part of the consultation on the region-wide Contributions Policy 2022. At that time, the majority of local boards were in support of the changes proposed in the draft Contributions Policy 2021
6. The Finance and Performance Committee considered the report on the proposal, which included local board views, at its meeting on 9 December 2021. The committee agreed to defer a decision on adding investment beyond 2031 to the Drury area to allow for the provision of further information requested by developers and additional time to make submissions once that information was provided.
7. The original proposal consulted on was revised accordingly and more information produced. The updated proposal included $2,470 billion of investment in Drury beyond 2031 of which $1.142 billion was to be funded by DCs. This would raise the average DC price in Drury by $60,687 to $83,25. Public consultation opened on 13 September 2022 for eight weeks, instead of the usual four weeks, and closed on 8 November 2022.
8. Sixty submissions were received, 33 of which were from those in the development community. The proposal was supported by 35 per cent of all submitters with 50 percent not in support. A further 15 per cent did not clearly state their views on the proposal.
9. This report summarises the key points made in submissions and notes officers’ initial analysis of the issues raised.
10. Local board feedback is sought to inform the Governing Body’s consideration of the adoption of the proposal planned for April 2023. The report to the Governing Body will also be updated reflecting officers' final analysis of the responses to submissions, updates reflecting additional work that has been undertaken since consultation and in particular to incorporate the latest economic forecasts and recent government decisions on their investment in Drury.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) whakaae / approve feedback from local boards on the draft Contributions Policy 2022, Variation A.
Horopaki
Context
Development contributions and infrastructure investment
11. Development contributions allow for an equitable and proportionate share of the total cost of growth-related capital expenditure to be recovered from the development community. The Contributions Policy sets out how the council will recover from new development an appropriate and fair share of the cost of infrastructure investment attributable to growth.
Growth and infrastructure investment
12. Auckland’s population is expected to continue to grow in the next ten years on top of the rapid population growth we have experienced in the last decade, bringing the projected population to 1.8 million early next decade. We are forecasting the construction of 145,800 new dwellings in the next ten years. To support the development enabled by the Auckland Unitary Plan, we are facing both immediate and longer-term demands for infrastructure in growth areas. If we do not adequately plan for the delivery and funding of this infrastructure, the cumulative effects of this development could lead to an unfair rates burden on future ratepayers or a risk of infrastructure shortfalls for future residents.
Drury
13. Drury-Opāheke is projected to grow by 22,000 new houses over the next thirty years. The proposal identified that an infrastructure investment of $2,869 billion will be required to support this growth. This investment will include a public and active transport led approach to transport infrastructure, parks and open spaces, and a new community facility that will include a local pool, leisure centre and library.
14. Investment in Drury will take around 30 years to deliver. The Contributions Policy 2022 only requires developers to contribute to the $399 million of investment we plan to make over the next 10 years. Without DC funding for a share of the $2.470 billion investment planned beyond 2031, there is a risk that those undertaking development will not contribute a fair, equitable, and proportionate portion of the capital expenditure necessary to service long-term growth. This risk could lead to shortfalls in the provision of infrastructure for the future residents of Drury and additional and/or additional demands on the city’s ratepayers.
Consultation 2021 and decisions
15. In 2021 the council consulted on a proposal to add investments planned to be delivered in Drury beyond 2031 to the 2022 policy and over the next year to the other Investment Priority Areas (IPAs) identified in the 10-year Budget 2021-2031. The IPAs are Inner Northwest, City Rail Link stations and Auckland Housing Programme (AHP) areas (Tāmaki, Mangere, Northcote, Oranga, and Mt Roskill). This would avoid an unfair rates burden on future ratepayers or the risk of infrastructure shortfalls for the future residents of new developments. The majority of local boards supported the original proposal.
a) The Finance and Performance Committee considered a report on the proposal at its meeting on 9 December 2021 (FIN/2021/119). The committee agreed in principle to add investments beyond 2031 to the Investment Priority Areas but deferred a decision on adding investment beyond 2031 to the Drury area. This was intended to allow the provision of more information to developers and other interested parties and allow more time for them to make further submissions with the benefit of this information.
Tātaritanga me ngā tohutohu
Analysis and advice
Updated proposal for consultation in 2022
16. In response to the council’s direction (resolution FIN/2021/119 b), staff undertook substantial additional work internally, commissioned five external expert reviews of our methodology and key economic issues, and sought expert transport planning and engineering advice on the proposed investments.
17. The original proposal consulted on was revised by updating our forecasts for the timing and location of growth within Drury and of construction costs, land price inflation, and interest rates.
18. External reviews were sought on our growth forecasting, cost estimation, and approach to calculating the share of costs to be recovered from developers. Recommendations from these reviews were applied to our calculations of the contributions charges for projects to be delivered beyond 2031 in Drury for inclusion in the proposal consulted on. These changes will also be considered for incorporation into the wider contributions policy as part of our future policy reviews.
19. Additional analysis of the distribution of the benefits of the proposed transport projects within Drury was also undertaken. The proposal consulted on allocated the transport costs to be recovered from development contributions to four new funding areas within Drury and to the relevant neighbouring areas. Adjustments were also made to neighbouring funding areas to reflect the benefits from community facilities investments, the regional transport funding area for wider transport benefits, and to the regional community facilities funding area for the library accordingly and more information produced.
20. Following completion of the work above the investments planned for beyond 2031 included in the consultation were:
b) $403 million for 43 new parks, with a total land requirement of 32.4 hectares (in addition to the $156 million council has already committed to invest before 2031)
c) $185 million for a single multi-purpose facility including a community facility, leisure centre, library, and local pool.
22. Of the $2.470 billion of projects, the proposal identified for delivery beyond 2031, $1.142 billion was proposed to be funded by developers through our contributions policy. This additional revenue requirement would raise the contributions price for Drury by an average of an additional $60,687, per household equivalent unit (HUE) to a total of on average $83,251 per HUE. Different charges would apply to different geographical areas based on the benefits accruing to each area.
Consultation
23. Public consultation opened on 13 September 2022 for eight weeks and closed on 8 November 2022. Additional information provided included 13 documents and two spreadsheets to allow submitters to better understand the proposal. These can be found on the council’s Have Your Say page.
24. During the consultation period, those from the development industry requested further information and in response the following additional materials were provided:
· Transport cost estimates for Drury. Further details on individual construction cost elements for transport projects
· Growth and HUE forecast. Spreadsheet outlining data used to forecast growth
25. Around 336 stakeholders were directly approached to advise them of the consultation. A media release was issued, and an article appeared in Our Auckland at the start of the consultation period. The consultation was also promoted through the council’s Engagement and People’s Panel newsletters. Forty-four people participated in the Have Your Say events held to support the consultation.
26. Two online and two face-to-face Have Your Say (HYS) events were held. Staff also attended a drop-in session in Drury organised by Waka Kotahi, two meetings organised by Drury developers, and a session organised by the Property Council of New Zealand. There were 44 attendees across all events representing 39 organisations. Officers also provided briefings to Waka Kotahi and the Ministry of Housing and Urban Development.
Feedback and Analysis
28. Sixty submissions were received. Overall, the proposal was supported by 35 per cent of submitters with 50 percent opposing it. A further 15 per cent did not clearly state their support or otherwise to the proposal. Key themes raised in the submissions are identified below. The submissions received in the consultation are available to elected members on the council’s meeting management system Nexus.
29. 26 individuals and one Māori organisation provided feedback. Of these, 69 per cent were in support of this proposal, 15 per cent did not support the proposal while the views of 15 per cent of submitters were not clearly stated.
30. Eleven of the individuals who supported the proposal commented that it was fair that developers should pay their fair share towards infrastructure. Those who did not state their support or otherwise thought that the council should support infrastructure development.
31. 33 responses were from those in the development industry. Responses from the industry show that 79 per cent opposed the proposal, six per cent supported it and 15 per cent did not state a clear view. Key themes from the developers’ feedback are outlined below.
Impact of higher development contributions
Feedback
32. Developers’ submissions noted the following concerns that higher DCs will:
· lead to higher house prices as developers seek to recover the increased costs. Developers who had already purchased land commented that they will be particularly disadvantaged as the increased DCs have not been included in the costs of their development
· lead to Drury being treated unfairly in relation to the rest of the city with much higher DCs
· discourage the construction of affordable housing as developers seek to recover higher costs with more expensive developments
· redirect development from Drury to other areas of the city with lower DC prices. Lower DCs are charged in wealthy established central parts of the city where infrastructure is already in place whereas incoming residents to Drury, where affordable housing can be built, are less able to afford higher DCs
· encourage land banking in Drury until house prices rise further or the policy changes.
Analysis
33. For developers who have purchased land recently higher DCs will put pressure on their margins. While staff acknowledge the impact a substantial increase in contributions charges is required if developers are to meet a fair share of cost of the investments required to support Drury’s development. The DCs charged in Drury will be higher than those in other parts of the city but this will reflect the council’s commitment to invest in infrastructure in Drury.
34. In feedback received from the original consultation, developers expressed concern about the equity of charging them now for investments that wouldn’t be delivered until the next decade. Our independent expert advice confirms the council’s previously presented analysis: that while the physical infrastructure wouldn’t be delivered until later, current landowners still benefit from the commitment to deliver in terms of higher land values. Furthermore, development occurring during the early years of this policy still contributes to the need for planned capital expenditure that will be incurred beyond 10 years’ time.
35. The independent economic consultants were asked for their views on the equity of our proposal to consider the likely impact of the proposal on house prices, and the viability of development in Drury. The consultants concluded that while the DC price will lower the price developers are willing to pay for land, this reduction is much lower than the increase in land value arising from the planning changes that enable housing development. There may be an indirect effect on the sequence of sites getting taken up for new housing across the city in the short term as development adjusts around a new equilibrium. However, this will be small relative to other market factors. Higher DCs may be an additional cost to development and could be argued to increase the return to holding land undeveloped however, earlier delivery of infrastructure funded by DCs is likely to accelerate development. The full report was included in the supporting documents pack released as part of the consultation process.
Complexity with a 30-year time frame
Feedback
36. Comments were provided on the accuracy of information on infrastructure requirements planned over a 30-year timeframe, including the assurance that revenue collected today will be used for future investment in infrastructure. Other comments from submitters include:
· possibility that infrastructure will not be needed resulting in over collection of DCs
· impact of inflation on delivery of projects over time adds complexity
· complexities arise around the accuracy of the price of infrastructure over a 30-year timeframe creating uncertainty. For example, when trying to estimate things such as inflation, delivery risks, costs of infrastructure, and future infrastructure demand over a 30-year period
· doubt that benefits will be received by early developers
· actions the council will have to take to ensure money collected today will be spent on delivery of the projects over 30-year period
· it is not clear what happens to the initially unspent portions of development contributions paid, but intended to fund works that are 1, 2 or 3 decades in the future.
Analysis
37. Forecasting capital expenditure over a 30-year horizon inevitably involves a higher degree of uncertainty than capex over the horizon of the 10-year Budget 2021-2031. However, the Local Government Act 2002 allows for development contributions to be recovered to fund capital expenditure to be incurred beyond the LTP period (10 years). The council may also vary the mix of projects for which development contributions will be used if there is a relevant change of circumstances relating to those projects, and the overall level of contribution does not increase.
38. Our contributions policy is reviewed every three years to ensure that our planned infrastructure investment continues to meet the need of the developing community and is appropriately costed using the latest available information. This enables us to respond to changing circumstances, while ensuring that our charges remain fair for developers.
Consideration of other sources of funding
Feedback
39. Several submitters considered the council should have given more consideration to alternative funding mechanisms before deciding to impose DCs. Submitters noted the council:
· has not demonstrated sufficient consideration of alternative funding methods such as Infrastructure Funding and Financing through the Crown Infrastructure Partners
· should consider the use of other funding and financing tools – such as targeted rates, congestion charging, Special Purpose Vehicles through the Funding and Financing Act and Specified Development Areas through the Urban Development Act – alongside DCs.
· should consider using targeted rates to cover the costs of infrastructure that cannot easily be identified with sufficient certainty, subject to these rates being ringfenced for sole use on infrastructure to facilitate growth in the specific area in which the targeted rate applies.
Analysis
40. The council’s Revenue and Financing Policy notes that at present DCs will be used to fund growth infrastructure. However, the Revenue and Financing Policy also makes provision for the use of other tools such as targeted rates and would also allow the use of levies under the Infrastructure Funding and Finance Act. All these tools have the same effective revenue for the council and cost for developers and landowners (the net present value is the same) but are triggered at different times.
41. These options remain open to the council and can be used in combination with development contributions. The first step under any of these options is to establish the investments required to support growth in the IPAs and the appropriate share to be recovered from developers or landowners. All tools need to be applied early in the process to ensure early developments pay their share. The potential application of these funding tools will be considered in the advice to council in April.
Accuracy and assumptions used in the model
Feedback
42. Comments were provided on the accuracy of information on infrastructure requirements planned over a 30-year timeframe, including the assurance that revenue collected today will be used for future investment in infrastructure. Submitters also noted:
· concern that the costings for the various projects incorporate excessive assumptions in respect of construction cost, contingency funding cost, and general inflation.
· the recent plan changes which have not been considered
· the model includes invalid assumptions concerning developer funded mitigation works and DC funded works, likely to lead to double dipping and over-recovery.
43. Comments on projects were also provided:
· the new policy encourages the council to design projects that are “gold plated” and have higher initial capital expenditure
· changes in transport patterns (e.g., mode share, e-bike subscriptions and sharing platforms) will influence future transport requirements.
· the full list of transportation projects arrived at by Supporting Growth Alliance has never been justified as being required to mitigate the effects of development in Drury East
· an independent audit of the proposed projects and their intended scale is requested to help ascertain how much of the increased cost relates to local rather than general factors
· the policy projects listed assumes that the council will purchase land from developers when in practice it is likely to require the land and infrastructure on it to be vested without charge or at a discount rate pursuant to the consent process will not incur these costs.
Analysis
44. A formal review was undertaken of the methodology the council uses to set DC charges. To do this, three external advisors were contracted to review our methods for growth forecasting, cost estimation, and how we assess the beneficiaries that underpin the DC charge calculations.
45. The feedback from our earlier consultation, the recommendations of these reviews, and our updated data models have allowed the DC calculation methodology to be refined to better suit the specific circumstances of Drury. The financial models were updated following a review conducted in November 2021. No errors in logic or in the functionality were identified in a review conducted in November 2022.
Updates to proposal
46. Further analysis of the feedback raised by developers will be presented to the Governing Body for decision making, planned for April 2023 and will include potential changes to the proposed amendment. Officers are in the process of updating the proposal to incorporate further work we have undertaken since consultation concluded to:
· respond as appropriate to issues raised in submissions including in the key areas noted below
· refine the projects and project costings in the proposal including
o estimates of developer mitigation - roading investments that developers will be required to provide as a condition of consent
o property costing
o investment decisions by the government
o community facilities funding areas
o transport funding areas
· update the forecasts of the following factors to reflect the latest economic conditions and predictions:
o growth in the Drury area – reflecting recent plan change decisions
o interest rates
o construction cost inflation
o land price inflation.
Compliance
47. Some submitters expressed a view that the proposal is not legally compliant and that there may be a case for a judicial review. Staff advice on the Contributions Policy is given in the context of highly prescriptive provisions of the Local Government Act 2002 (LGA) which cover the content of a contributions policy and the assessment of contributions. These provisions are the only source of the council’s power to require development contributions and must be strictly complied with.
48. Staff have reviewed the proposal and will consider the matters raised in submissions giving consideration to the legislative requirements in the LGA, including specific content requirements for development contributions policies, and the council’s Revenue and Financing Policy.
Tauākī whakaaweawe āhuarangi
Climate impact statement
49. Recommendations in this report have a neutral climate impact as they relate to the funding of capital investment rather than decisions on the activities to be undertaken.
Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera
Council group impacts and views
50. The information presented on the projects included in the draft Contributions Policy 2022 Variation A was developed in conjunction with the following council-controlled organisations and council units:
· Auckland Transport
· Community Facilities
· Community and Social Policy
51. The Chief Economist Unit and Research Investigations and Monitoring Unit worked with us on growth and economic forecasts, the impact of higher development contributions on the pace of development, and on land and house prices.
Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe
Local impacts and local board views
52. The Drury funding area in the proposal is within the Franklin and Papakura local board areas. The recommendations in this report support a higher level of infrastructure investment in the Drury area and sets a higher DC price in this area.
53. Local board feedback is sought to inform the Governing Body’s consideration of the adoption of the Contribution Policy 2022, Variation A in April 2023.
Tauākī whakaaweawe Māori
Māori impact statement
54. Development contributions are assessed against the demand that different types of development generate on council infrastructure. Māori developments are assessed under broader development types based on the demand they generate. For example, kaumātua housing is treated the same as retirement villages, and marae are considered under community facilities. As more Māori developments occur, evidence of demand generation can be used to reclassify developments or create new development types.
55. Eleven iwi authorities (with mana whenua interests) in the Drury area were contacted prior to the start of consultation to seek expressions of interest in discussing and providing feedback on the proposed changes. All iwi authorities were also notified when consultation opened, further advising of how they could have their say. Opportunities to present to the Mana Whenua forum, the Independent Māori Statutory Board and other council forums were explored, however, this topic was not seen as a priority area at the time. One response supporting this proposal was received from mana whenua who considered this was a fairer way to fund the required infrastructure.
Ngā ritenga ā-pūtea
Financial implications
56. There are no financial implications from requesting local boards views.
57. The proposal provides for additional investment by the council beyond 2031 to support growth in Drury of $2.470 billion. The draft Contributions Policy, Variation A provides for $1.142 billion of this investment to be funded by DCs.
Ngā raru tūpono me ngā whakamaurutanga
Risks and mitigations
58. The recommendation requesting local boards views does not present any risk. The risks associated with amending the contributions policy will be set out in the report to the Governing Body planned for April 2023.
Ngā koringa ā-muri
Next steps
59. Feedback from the public consultation will be reported to the Governing Body in February 2023.
60. Staff will provide advice, options and responses to the issues raised in the feedback to the Governing Body to assist in their decision making.
61. A decision-making report to the Governing Body is planned for April 2023 and will include potential changes to the draft policy and local board feedback.
62. All local board feedback is due on 3 March 2023.
Attachments
There are no attachments for this report.
Ngā kaihaina
Signatories
Author |
Andrew Duncan - Manager Financial Policy |
Authorisers |
Carol Hayward - Team Leader Operations and Policy Louise Mason - General Manager Local Board Services Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Annual Auckland Council Group Māori Outcomes Report: Te Pūrongo a Te Kaunihera o Tāmaki Makaurau Ngā Huanga Māori 2021-2022.
File No.: CP2023/00792
Te take mō te pūrongo
Purpose of the report
1. To present the annual Auckland Council Group Māori Outcomes Report: Te Pūrongo a Te Kaunihera o Tāmaki Makaurau Ngā Huanga Māori 2021-2022.
Whakarāpopototanga matua
Executive summary
2. The Auckland Council Group Māori Outcomes Report for 2021-2022 shows how the council group is contributing to the 10 mana outcomes of Kia Ora Tāmaki Makaurau – Māori Outcomes Performance Measurement Framework, and the LTP 10-year budget priorities.
3. The council group published its first Māori Outcomes Report in 2019. This fourth edition flows on from earlier reports and provides information on performance, including how the council group has been supporting a Māori response and recovery from COVID-19. Each report aims to provide a comprehensive picture of annual progress to decision makers across the council group, Māori partners, elected members, leaders in governance, and whānau Māori.
4. Highlights for the 2021-2022 year include:
· Elevation of the council’s most senior Māori leadership role, Director Ngā Mātārae and Māori Outcomes, to the Executive Leadership team.
· Manaaki Fund 2021 contributed to Māori partners’ Covid-19 initiatives, which supported whanau wellbeing during Auckland’s longest Covid-19 lockdown. A total of $297,570.00 was granted.
· Continued success of Toi Tū Toi Ora through a year long programme of work in support of the previous year’s hugely successful Toi Tū Toi Ora exhibition.
· Marae Infrastructure Programme continues to progress major infrastructure upgrades for six marae, and another nine marae formally engaged at various stages.
· Amotai continues to support Māori businesses into procurement opportunities. In financial year 22, funding from the Māori Outcomes Fund enabled Amotai to work across 126 procurement opportunities worth a total of $150 million.
5. Delivery challenges faced by some of our partners led to underspend of the Māori Outcomes Fund, with $14.3 million of its $18.7 million budget spent.
6. Separate to the annual Māori outcomes report are 6-monthly measures reports for Kia Ora Tāmaki Makaurau – Māori Outcomes Performance Measurement Framework. The inaugural measures report for the July 2021 – Dec 2021 period was presented to the Parks, Arts Community and Events committee at the September 2022 meeting.
7. The Auckland Council Group Māori Outcomes Report: Te Pūrongo a Te Kaunihera o Tāmaki Makaurau Ngā Huanga Māori 2021-2022 will be publicly published with copies distributed to key partners including mana whenua iwi and mataawaka entities.
Recommendation/s
That Maungakiekie-Tāmaki Local Board:
a) receive the annual Auckland Council Group Māori Outcomes Report: Te Pūrongo a Te Kaunihera o Tāmaki Makaurau Ngā Huanga Māori 2021-2022.
Attachments
No. |
Title |
Page |
Te Pūrongo a Te Kaunihera o Tāmaki Makaurau Ngā Huanga Māori 2021/2022 - Auckland Council Group Māori Outcomes Report 2021-2022 (Under Separate Cover) |
|
Ngā kaihaina
Signatories
Author |
Ashley Walker - Principal Advisor - Maori Outcomes |
Authorisers |
Lou-Ann Ballantyne - Head of Māori Strategic Outcomes Herewini Te Koha - Director Māori Outcomes Victoria Villaraza - Local Area Manager Louise Mason - General Manager Local Board Services |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Urgent Decision - Local Board Feedback on the Resource management reform: Natural and Built Enviroment Bill and Spatial Planning Bill
File No.: CP2023/00348
Te take mō te pūrongo
Purpose of the report
1. To inform the Maungakiekie-Tāmaki Local Board of an urgent decision made under delegation by the Chair and Deputy Chair to provide input on the Natural and Built Environment Bill and Spatial Planning Bill to inform the council’s draft submission.
Whakarāpopototanga matua
Executive summary
2. At the Maungakiekie-Tāmaki Local Boards 22 November 2022 business meeting, the local board considered the urgent decision-making process and passed resolution MT/2022/162:
a) delegate authority to the chairperson and deputy chairperson, or any person acting in these roles, to make urgent decisions on behalf of the local board, if the local board is unable to meet
b) confirm that the Local Area Manager, chairperson, and deputy chairperson (or any person/s acting in these roles) will authorise the use of the local board’s urgent decision mechanism by approving the request for an urgent decision in writing
c) note that all urgent decisions made, including written advice which supported these decisions, will be included on the agenda of the next ordinary meeting of the local board. CARRIED
3. Local boards have a role in representing the views of their communities on issues of local importance, such as inputting local impacts of Central Government proposals into Auckland Council submissions.
4. As a result of local board feedback being due prior to the next business meeting an urgent decision was required.
5. A copy of the urgent decision and the local board’s feedback is Attachment A of this report.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) note the urgent decision made on 23 January 2023, providing local board feedback on the Natural and Built Environment Bill and Spatial Planning Bill to inform the council’s draft submission.
Attachments
No. |
Title |
Page |
a⇩ |
Urgent Decision - Local Board Feedback on the Resource management reform: Natural and Built Enviroment Bill and Spatial Planning Bill |
95 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Victoria Villaraza - Local Area Manager Louise Mason - General Manager Local Board Services |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Urgent Decision - Local Board Feedback on the Draft Future for Local Government report
File No.: CP2023/00350
Te take mō te pūrongo
Purpose of the report
1. To inform the Maungakiekie-Tāmaki Local Board of an urgent decision made under delegation by the Chair and Deputy Chair to provide input on the Draft Future for Local Government report to form the council’s submission.
Whakarāpopototanga matua
Executive summary
2. At the Maungakiekie-Tāmaki Local Boards 22 November 2022 business meeting, the local board considered the urgent decision-making process and passed resolution MT/2022/162:
a) delegate authority to the chairperson and deputy chairperson, or any person acting in these roles, to make urgent decisions on behalf of the local board, if the local board is unable to meet
b) confirm that the Local Area Manager, chairperson, and deputy chairperson (or any person/s acting in these roles) will authorise the use of the local board’s urgent decision mechanism by approving the request for an urgent decision in writing
c) note that all urgent decisions made, including written advice which supported these decisions, will be included on the agenda of the next ordinary meeting of the local board. CARRIED
3. Local boards have a role in representing the views of their communities on issues of local importance, such as inputting local impacts of Central Government proposals into Auckland Council submissions.
4. As a result of local board feedback being due prior to the next business meeting an urgent decision was required.
5. A copy of the urgent decision and the local board’s feedback is Attachment A of this report.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) note the urgent decision made on 2 February 2023, providing local board feedback on the Draft Future for Local Government report to inform the council’s submission.
Attachments
No. |
Title |
Page |
a⇩ |
Urgent Decision - Local BoardFeedback on the Draft Future for Local Government report |
125 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Victoria Villaraza - Local Area Manager Louise Mason - General Manager Local Board Services |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Urgent Decision - Local Board Feedback on the Justice Committee inquiry into the 2022 Local Government elections
File No.: CP2023/01453
Te take mō te pūrongo
Purpose of the report
a) To note that an urgent decision was made to provide Maungakiekie-Tāmaki Local Board: feedback on the Justice Committee inquiry into the 2022 Local Government elections.
Whakarāpopototanga matua
Executive summary
1. At the Maungakiekie-Tāmaki Local Boards 22 November 2022 business meeting, the local board considered the urgent decision-making process and passed resolution MT/2022/162:
a) delegate authority to the chairperson and deputy chairperson, or any person acting in these roles, to make urgent decisions on behalf of the local board, if the local board is unable to meet
b) confirm that the Local Area Manager, chairperson, and deputy chairperson (or any person/s acting in these roles) will authorise the use of the local board’s urgent decision mechanism by approving the request for an urgent decision in writing
c) note that all urgent decisions made, including written advice which supported these decisions, will be included on the agenda of the next ordinary meeting of the local board. CARRIED
2. An urgent decision was required in this instance because the feedback needed to be provided by 31 January to be incorporated into the council’s submission. The Board’s next scheduled is on 7 February 2023.
3. Local Boards have the opportunity to provide feedback on the Justice Committee’s inquiry into the 2022 local elections.
4. A copy of the urgent decision and the local board’s feedback is Attachment A of this report.
b)
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) note the urgent decision made on 31 January 2023, providing local board feedback on the Justice Committee’s inquiry into the 2022 local elections report.
Attachments
No. |
Title |
Page |
a⇩ |
Urgent Decision - Local Board Feedback on the Justice Committeee's inquiry into the 2022 local elections report |
135 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Louise Mason - General Manager Local Board Services Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Urgent Decision - Local Board Feedback on the Sale and Supply of Alcohol (Community Participation) Amendment Bill
File No.: CP2023/00801
Te take mō te pūrongo
Purpose of the report
c) To note the Maungakiekie-Tāmaki Local Board use of an urgent decision to provide feedback on Auckland Council’s submission to the Sale and Supply of Alcohol (Community Participation) Amendment Bill before the Justice Select Committee.
Whakarāpopototanga matua
Executive summary
1. At the Maungakiekie-Tāmaki Local Boards 22 November 2022 business meeting, the local board considered the urgent decision-making process and passed resolution MT/2022/162:
a) delegate authority to the chairperson and deputy chairperson, or any person acting in these roles, to make urgent decisions on behalf of the local board, if the local board is unable to meet
b) confirm that the Local Area Manager, chairperson, and deputy chairperson (or any person/s acting in these roles) will authorise the use of the local board’s urgent decision mechanism by approving the request for an urgent decision in writing
c) note that all urgent decisions made, including written advice which supported these decisions, will be included on the agenda of the next ordinary meeting of the local board. CARRIED
2. The Sale and Supply of Alcohol (Community Participation) Amendment Bill was introduced to parliament in December 2022 and is before the Justice Select Committee. This Bill provides an opportunity to amend the Sale and Supply of Alcohol Act 2012, to strengthen local councils and communities’ ability to have a real and fair say in the regulation of and accessibility to alcohol in their own communities. The proposed reforms would:
· remove the appeals process for local alcohol policies,
· remove cross-examinations from licensing hearings, and
· remove the limits around who can object to an alcohol license.
3. Auckland Council will be making a submission to the Justice Select Committee on this Bill. A draft submission has already been circulated to local board members for feedback by the Community and Social Policy Unit.
4. An urgent decision is required as the deadline for feedback to be incorporated into the council’s submission is 1 February 2023. Maungakiekie-Tāmaki Local Boards next scheduled business meeting is on 7 February 2023.
5. A copy of the urgent decision and the local board’s feedback is Attachment A of this report.
d)
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) note the urgent decision made on 31 January 2023, providing feedback on the Sale and Supply of Alcohol (Community Participation) Amendment Bill.
Attachments
No. |
Title |
Page |
a⇩ |
Urgent Decision - Local Board Feedback on the Sale and Supply of Alcohol (Community Participation) Ammendment Bill |
147 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Victoria Villaraza - Local Area Manager Louise Mason - General Manager Local Board Services |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Urgent Decision - Local Board Feedback on the Water Services Entities Bill 2
File No.: CP2023/01651
Te take mō te pūrongo
Purpose of the report
1. To inform the Maungakiekie-Tāmaki Local Board of an urgent decision made under delegation by the Chair and Deputy Chair to provide feedback on the Water Services Entities Bill 2 to form the council’s submission.
Whakarāpopototanga matua
Executive summary
2. At the Maungakiekie-Tāmaki Local Boards 22 November 2022 business meeting, the local board considered the urgent decision-making process and passed resolution MT/2022/162:
a) delegate authority to the chairperson and deputy chairperson, or any person acting in these roles, to make urgent decisions on behalf of the local board, if the local board is unable to meet
b) confirm that the Local Area Manager, chairperson, and deputy chairperson (or any person/s acting in these roles) will authorise the use of the local board’s urgent decision mechanism by approving the request for an urgent decision in writing
c) note that all urgent decisions made, including written advice which supported these decisions, will be included on the agenda of the next ordinary meeting of the local board. CARRIED
3. Local boards have a role in representing the views of their communities on issues of local importance, such as inputting local impacts of Central Government proposals into Auckland Council submissions.
4. There is an opportunity for Auckland Council to make a submission on the Water Services Entities Bill 2. Submissions close on 24 February 2023.
5. The case for an urgent decision is made by this deadline for feedback to be incorporated into the council’s submission, being prior to the Maungakiekie-Tāmaki Local Board’s next scheduled business meeting, 28 February 2023.
6. A copy of the urgent decision and the local board’s feedback is Attachment A of this report.
Recommendation/s
That the Maungakiekie-Tāmaki Local Board:
a) note the urgent decision made on 21 February 2023, providing local board feedback on the Water Services Bill 2 to inform the council’s submission.
Attachments
No. |
Title |
Page |
a⇩ |
Attachment A |
157 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Victoria Villaraza - Local Area Manager Louise Mason - General Manager Local Board Services |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Hōtaka Kaupapa / Governance Forward Work Calendar
File No.: CP2023/00808
Te take mō te pūrongo
Purpose of the report
1. To present the board with the governance forward work calendar.
Whakarāpopototanga matua
Executive summary
2. The Hōtaka Kaupapa/ governance forward work calendar for the Maungakiekie-Tāmaki Local Board is in Attachment A.
3. The calendar aims to support local boards’ governance role by:
· ensuring advice on meeting agendas is driven by local board priorities
· clarifying what advice is required and when
· clarifying the rationale for reports.
4. The calendar is updated every month. Each update is reported to business meetings. It is recognised that at times items will arise that are not programmed. Board members are welcome to discuss changes to the calendar.
Recommendation/s That the Maungakiekie-Tāmaki Local Board: a) note the attached Hōtaka Kaupapa / Governance Forward Work Calendar. |
Attachments
No. |
Title |
Page |
a⇩ |
Tuesday 28 February 2023, Maungakiekie-Tāmaki Local Board Business Meeting: Item 16 - Governance Forward Work Calendar, document |
165 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Record of Maungakiekie-Tāmaki Local Board Workshops
File No.: CP2023/00807
Te take mō te pūrongo
Purpose of the report
To provide a summary of the Maungakiekie-Tāmaki Local Board workshops for 21 February 2023.
Whakarāpopototanga matua
Executive summary
1. Local board workshops are held to give board members an opportunity to receive information and updates or provide direction and have discussion on issues and projects relevant to the local board area. No binding decisions are made or voted on at workshop sessions.
Recommendation/s That the Maungakiekie-Tāmaki Local Board: a) note the local board record of workshops held on 21 February 2023. |
Attachments
No. |
Title |
Page |
a⇩ |
Tuesday 28 February 2023, Maungakiekie-Tāmaki Local Board Business Meeting: Item 16 - Record of Workshops, document |
171 |
Ngā kaihaina
Signatories
Author |
Jessica Prasad - Democracy Advisor |
Authorisers |
Victoria Villaraza - Local Area Manager |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
a) exclude the public from the following part(s) of the proceedings of this meeting.
The general subject of each matter to be considered while the public is excluded, the reason for passing this resolution in relation to each matter, and the specific grounds under section 48(1) of the Local Government Official Information and Meetings Act 1987 for the passing of this resolution follows.
14 Auckland Council's Performance Report: Maungakiekie-Tāmaki Local Board for quarter two 2022/2023 - Attachment b - Maungakiekie-Tāmaki Operating Performance Financial Summary
Reason for passing this resolution in relation to each matter |
Particular interest(s) protected (where applicable) |
Ground(s) under section 48(1) for the passing of this resolution |
The public conduct of the part of the meeting would be likely to result in the disclosure of information for which good reason for withholding exists under section 7. |
s7(2)(j) - The withholding of the information is necessary to prevent the disclosure or use of official information for improper gain or improper advantage. In particular, the report contains detailed financial information related to the financial results of the Auckland Council group that requires release to the New Zealand Stock exchange.. |
s48(1)(a) The public conduct of the part of the meeting would be likely to result in the disclosure of information for which good reason for withholding exists under section 7. |
Maungakiekie-Tāmaki Local Board 28 February 2023 |
|
Item 8.1 Attachment a 28 February 2023, Maungakiekie-Tāmaki Local Board Business Meeting: Item 8.1 - Deputation, powerpoint presentation Page 181