I hereby give notice that an ordinary meeting of the Waiheke Local Board will be held on:

 

Date:

Time:

Meeting Room:

Venue:

 

Wednesday, 26 March 2025

1.00pm

Local Board Office
Waiheke Local Board office
10 Belgium Street
Ostend
Waiheke

 

Waiheke Local Board

 

OPEN AGENDA

 

 

 

 

MEMBERSHIP

 

Chairperson

Cath Handley

 

Deputy Chairperson

Kylee Matthews

 

Members

Bianca Ranson

 

 

Robin Tucker

 

 

Paul Walden

 

 

(Quorum 3 members)

 

 

 

Amelia Lawley

Democracy Advisor

 

20 March 2025

 

Contact Telephone: 027 261 8595

Email: amelia.lawley@aucklandcouncil.govt.nz

Website: www.aucklandcouncil.govt.nz

 

 


 

 


ITEM   TABLE OF CONTENTS            PAGE

1          Nau mai | Welcome                                                                  5

2          Ngā Tamōtanga | Apologies                                                   5

3          Te Whakapuaki i te Whai Pānga | Declaration of Interest                                                               5

4          Te Whakaū i ngā Āmiki | Confirmation of Minutes              5

5          He Tamōtanga Motuhake | Leave of Absence                      5

6          Te Mihi | Acknowledgements                              5

7          Ngā Petihana | Petitions                                       5

8          Ngā Tono Whakaaturanga | Deputations           5

8.1     Deputation - Te Whau residents                5

9          Te Matapaki Tūmatanui | Public Forum                                6

10        Ngā Pakihi Autaia | Extraordinary Business     6

11        Chairperson's report                                            7

12        Record of urgent decisions - March 2025        13

13        Waiheke Local Board Grants Programme 2025/2026                                                             17

14        Quick Response round two 2024/2025 grant allocations                                                           29

15        Auckland Transport Kōkiri / Local Board Transport Agreement Quarterly update - March 2025                                                                      87

16        Waiheke Kōkiri Agreement interim report March 2025                                                        101

17        Kōkiri - Setting priorities for Auckland Transport project and programme engagement                                                                            129

18        Local board input into Auckland Council’s submission on the Term of Parliament (Enabling 4-year Term) Legislation Amendment Bill                                                197

19        Waiheke Local Board feedback on the proposed wastewater environmental performance standards                                    201

20        Waiheke Local Board views on the draft Contributions Policy 2025                               209

21        Waiheke Local Board - Resource Consent Applications - March 2025                               415

22        Waiheke Local Board - Hōtaka Kaupapa Policy Schedule - March 2025                                     419

23        Waiheke Local Board - Workshop record - March 2025                                                        423

24        Te Whakaaro ki ngā Take Pūtea e Autaia ana | Consideration of Extraordinary Items

 

 


1          Nau mai | Welcome

 

            The meeting will be opened with a karakia.

 

2          Ngā Tamōtanga | Apologies

 

At the close of the agenda no apologies had been received.

 

 

3          Te Whakapuaki i te Whai Pānga | Declaration of Interest

 

Members are reminded of the need to be vigilant to stand aside from decision making when a conflict arises between their role as a member and any private or other external interest they might have.

 

 

4          Te Whakaū i ngā Āmiki | Confirmation of Minutes

 

That the Waiheke Local Board:

a)          whakaū / confirm the ordinary minutes of its meeting, held on Wednesday, 26 February 2026, as a true and correct record.

 

 

 

5          He Tamōtanga Motuhake | Leave of Absence

 

At the close of the agenda no requests for leave of absence had been received.

 

 

6          Te Mihi | Acknowledgements

 

At the close of the agenda no requests for acknowledgements had been received.

 

 

7          Ngā Petihana | Petitions

 

At the close of the agenda no requests to present petitions had been received.

 

 

8          Ngā Tono Whakaaturanga | Deputations

 

Standing Order 7.7 provides for deputations. Those applying for deputations are required to give seven working days notice of subject matter and applications are approved by the Chairperson of the Waiheke Local Board. This means that details relating to deputations can be included in the published agenda. Total speaking time per deputation is ten minutes or as resolved by the meeting.

 

 

8.1       Deputation - Te Whau residents

Te take mō te pūrongo

Purpose of the report

1.       Residents of Te Whau will be in attendance to address the board on their concern about changes to the use of property that is zoned rural.

 

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      receive the presentation by the residents of Te Whau and thank them for their attendance.

 

Attachment

a          Te Whau residents support letter............ 435

 

 

 

9          Te Matapaki Tūmatanui | Public Forum

 

A period of time (approximately 30 minutes) is set aside for members of the public to address the meeting on matters within its delegated authority. A maximum of three minutes per speaker is allowed, following which there may be questions from members.

 

At the close of the agenda no requests for public forum had been received.

 

 

10        Ngā Pakihi Autaia | Extraordinary Business

 

Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (as amended) states:

 

“An item that is not on the agenda for a meeting may be dealt with at that meeting if-

 

(a)        The local authority by resolution so decides; and

 

(b)        The presiding member explains at the meeting, at a time when it is open to the public,-

 

(i)         The reason why the item is not on the agenda; and

 

(ii)        The reason why the discussion of the item cannot be delayed until a subsequent meeting.”

 

Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (as amended) states:

 

“Where an item is not on the agenda for a meeting,-

 

(a)        That item may be discussed at that meeting if-

 

(i)         That item is a minor matter relating to the general business of the local authority; and

 

(ii)        the presiding member explains at the beginning of the meeting, at a time when it is open to the public, that the item will be discussed at the meeting; but

 

(b)        no resolution, decision or recommendation may be made in respect of that item except to refer that item to a subsequent meeting of the local authority for further discussion.”

 


Chairperson's report

File No.: CP2025/04569

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To provide Chairperson Cath Handley with an opportunity to update the local board on the projects and issues she has been involved with and to draw the board’s attention to any other matters of interest.

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      receive Chairperson Cath Handley’s written report.

 

Ngā tāpirihanga

Attachment

No.

Title

Page

a

Chairperson's report

9

      

Ngā kaihaina

Signatories

Author

Amelia Lawley - Democracy Advisor

Authorisers

Lou-Ann Ballantyne - General Manager Governance and Engagement

Janine Geddes – Acting Local Area Manager

 

 






Record of urgent decisions - March 2025

File No.: CP2025/02725

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To note the resolution made under urgency on 5 March 2025.

Whakarāpopototanga matua

Executive summary

2.       On 5 March 2025, the Waiheke Local Board resolved through urgent decision (under delegated authority by Chairperson Cath Handley and Deputy Chairperson Kylee Matthews) to revoke resolution WHK/2025/11 and approve a replacement resolution relating to feedback on the Fix and Finish fund (Attachment A).

 

Ngā tūtohunga

Recommendation/s

That the Waiheke Local Board:

a)      note the resolution made under urgency on 5 March 2025 (Attachment A).

 

Ngā tāpirihanga

Attachment

No.

Title

Page

a

Urgent decision 5 March 2025 - Fix and Finish fund

15

     

Ngā kaihaina

Signatories

Author

Amelia Lawley - Democracy Advisor

Authorisers

Janine Geddes – Acting Local Area Manager

Lou-Ann Ballantyne - General Manager Governance and Engagement

 

 




Waiheke Local Board Grants Programme 2025/2026

File No.: CP2025/02949

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To adopt the Waiheke Grants Programme 2025/2026.

Whakarāpopototanga matua

Executive summary

2.       The Auckland Council Community Grants Policy guides the allocation of local, multi-board and regional grant programmes to groups and organisations delivering projects, activities and services that benefit Aucklanders.

3.       The Community Grants Policy supports each local board to review and adopt their own local grants programme for the next financial year.

4.       This report presents the Waiheke Grants Programme 2025/2026 for adoption (as provided in Attachment A to this report).

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      adopt the Waiheke Grants Programme 2025/2026 in Attachment A.

 

Horopaki

Context

5.       The Auckland Council Community Grants Policy guides the allocation of local, multi-board and regional grant programmes to groups and organisations delivering projects, activities and services that benefit Aucklanders.

6.       The Community Grants Policy supports each local board to review and adopt its own local grants programme for the next financial year. The local board grants programme guides community groups and individuals when making applications to the local board.

7.       The local board community grants programme includes:

· outcomes as identified in the local board plan

· specific local board grant priorities

· which grant types will operate, the number of grant rounds and opening and closing           dates

· any additional criteria or exclusions that will apply

· other factors the local board consider to be significant to their decision-making.

8.       Once the local board grants programme has been adopted, the types of grants, grant rounds, criteria and eligibility with be advertised through an integrated communication and marketing approach which includes utilising the local board channels.

Tātaritanga me ngā tohutohu

Analysis and advice

9.       The aim of the local board grant programme is to deliver projects and activities which align with the outcomes identified in the local board plan. The new Waiheke Grants Programme has been workshopped with the local board and feedback incorporated into the grants programme.

Tauākī whakaaweawe āhuarangi

Climate impact statement

10.     The local board grants programme aims to respond to Auckland Council’s commitment to address climate change by providing grants to individuals and groups with projects that support community climate change action. Local board grants can contribute to climate action through the support of projects that address food production and food waste; alternative transport methods; community energy efficiency education and behaviour change; build community resilience and support tree planting.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

11.     The grants programme has no identified impacts on council-controlled organisations and therefore their views are not required.

12.     Based on the main focus of an application, a subject matter expert from the relevant council unit will provide input and advice. The main focus of an application is identified as arts, community, events, sport and recreation, environment or heritage.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

13.     The grants programme has been developed by the local board to set the direction of its grants programme. This programme is reviewed on an annual basis.

Tauākī whakaaweawe Māori

Māori impact statement

14.     All grant programmes respond to Auckland Council’s commitment to improving Māori wellbeing by providing grants to organisations delivering positive outcomes for Māori. Applicants are asked how their project aims to increase Māori outcomes in the application process.

Ngā ritenga ā-pūtea

Financial implications

15.     The allocation of grants to community groups is within the adopted Long-Term Plan 2021 -2031 and local board agreements.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

16.     The allocation of grants occurs within the guidelines and criteria of the Community Grants Policy. Therefore, there is minimal risk associated with the adoption of the grants programme.

Ngā koringa ā-muri

Next steps

17.     An implementation plan is underway and the local board grants programme will be locally advertised through the local board and council channels, including the council website, local board Facebook page and communication with past recipients of grants.

 

Ngā tāpirihanga

Attachment

No.

Title

Page

a

Waiheke Local Board Grants Programme 2025/2026

21

     

Ngā kaihaina

Signatories

Author

James Boyd - Senior Grants Advisor

Authorisers

Pierre Fourie - Grants & Incentives Manager

Janine Geddes – Acting Local Area Manager

 

 









Quick Response round two 2024/2025 grant allocations

File No.: CP2025/03996

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To fund, part-fund, or decline applications received for the Waiheke Local Board in the Quick Response grant round two 2024/2025.

Whakarāpopototanga matua

Executive summary

2.       The Waiheke Local Board adopted the Grants Programme 2024/2025, which sets application guidelines for contestable grants submitted to the local board (Attachment A).

3.       This report presents applications received in Quick Response grant round two 2024/2025 (Attachments B).

4.       The local board has set a total community grants budget of $86,000 for the financial year.

5.       18 applications have been received towards Quick Response round one, requesting a total of $29,384.47. A total of $19,008 was funded with one grant being cancelled leaving a total of $67,692 for three remaining rounds.

6.       14 applications have been received towards Local Grants round one, requesting a total of $89,660.59. Four applications were received towards the Environmental round one, requesting a total of $35,136.23. $26,500 was spent in the Local Grants round and $17,727.20 was spent in the environmental round, leaving $41,192 and $7,272.80 respectively for two Local and one Environmental round.

7.       11 applications have been received towards Quick Response round two, requesting a total of $19,029.85.

Ngā tūtohunga

Recommendation

That the Waiheke Local Board agree to fund, part-fund or decline each application listed below:

a)   Funding applications:

Application ID

Organisation

Main focus

Requesting funding for

Amount requested

Eligibility

QR2518-201

Waiheke Community Art Gallery

Arts and culture

Towards coordinator costs, flyer design and printing at Owhanae Barn from 30 May 2025 to 2 June 2025

$2,000.00

Eligible

QR2518-203

Waiheke Playgroup

Community

Towards venue hire, general running costs, flag and chalk board at Old Blackpool Hall from 3 April 2025 to 2 April 2026

$2,000.00

Eligible

QR2518-204

Waiheke Island Historical Society Inc

Arts and culture

Towards solar panels and equipment at the Museum of Waiheke

$2,000.00

Eligible

QR2518-206

Waiheke Tennis Club

Sport and recreation

Towards coaching wages at Onetangi Sports Park from 28 April 2025 to 27 June 2025

$2,000.00

Eligible

QR2518-208

Reach Out Waiheke

Community

Towards board games and catering at Surfdale Community Hall from 1 April 2025 to 25 November 2025

$750.00

Eligible

QR2518-209

The Artworks Theatre Incorporated

Community

Towards bean bags at Artworks Theatre courtyard

$1,315.00

Eligible

QR2518-210

Te Arai Roa Manaaki - Living Without Violence (Waiheke Network) Inc

Community

Towards guest speaker hire costs at Waiheke Resources Trust

$2,000.00

Eligible

QR2518-211

Waiheke Adult Literacy Inc

Community

Towards facilitator fees at Waiheke Adult Learning from 28 April 2025 to 5 December 2025

$2,000.00

Eligible

QR2518-212

G Alexander-Masters

Community

Towards cups for Ostend Market

$964.85

Eligible

QR2518-213

Waiheke Livingwaters AOG

Community

Towards ingredient purchase for Livingwaters AOG Church from 2 April 2025 to 11 February 2026

$2,000.00

Eligible

QR2518-214

Waiheke Hope Centre

Community

Towards power and food vouchers at 4/92 The Esplanade from 7 April 2025 to 31 December 2025

$2,000.00

Eligible

Total

 

 

 

$19,029.85

 

 

 

Horopaki

Context

8.       The local board allocates grants to groups and organisations delivering projects, activities, and services that benefit Aucklanders and contribute to the vision of being a world-class city.

9.       The Auckland Council Community Grants Policy supports each local board to adopt a grants programme.

10.     The local board grants programme sets out:

·    local board priorities

·    lower priorities for funding

·    exclusions

·    grant types, the number of grant rounds and when these will open and close

·    any additional accountability requirements

11.     The community grant programmes have been extensively advertised through the council grants webpage, local board webpages, local board e-newsletters, Facebook pages, council publications, radio, and community networks.

Tātaritanga me ngā tohutohu

Analysis and advice

12.     The aim of the local board grant programme is to deliver projects and activities which align with the outcomes identified in the local board plan. All applications have been assessed utilising the Community Grants Policy and the local board grant programme criteria. The eligibility of each application is identified in the report recommendations.

Tauākī whakaaweawe āhuarangi

Climate impact statement

13.     The local board grants programme aims to respond to Auckland Council’s commitment to address climate change by providing grants to individuals and groups with projects that support community climate change action. Local board grants can contribute to climate action through support of projects that address food production and food waste, support alternative transport methods, support community energy efficiency education and behaviour change, build community resilience, and support tree planting.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

14.     According to the main focus of the application, each one has received input from a subject matter expert from the relevant department. The main focuses are identified as arts, community, events, sport and recreation, environment or heritage.

15.     The grants programme has no identified impacts on council-controlled organisations and therefore their views are not required.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

16.     Local boards are responsible for the decision-making and allocation of local board community grants. The Waiheke Local Board is required to fund, part-fund or decline these grant applications against the local board priorities identified in the local board grant programme

17.     The board is requested to note that section 48 of the Community Grants Policy states; ‘we will also provide feedback to unsuccessful grant applicants about why they have been declined, so they will know what they can do to increase their chances of success next time’.

Tauākī whakaaweawe Māori

Māori impact statement

18.     The local board grants programme aims to respond to Auckland Council’s commitment to improving Māori wellbeing by providing grants to individuals and groups who deliver positive outcomes for Māori. Auckland Council’s Nga Mātārae has provided input and support towards the development of the community grant processes

Ngā ritenga ā-pūtea

Financial implications

19.     The allocation of grants to community groups is within the adopted Long-term Plan 2021-2031 and local board agreements.

20.     The local board has set a total community grants budget of $86,000 for the financial year.

21.     18 applications have been received towards Quick Response round one, requesting a total of $29,384.47. A total of $19,008 was funded with one grant being cancelled leaving a total of $67,692 for three remaining rounds.

22.     14 applications have been received towards Local Grants round one, requesting a total of $89,660.59. Four applications were received towards the Environmental round one, requesting a total of $35,136.23. $26,500 was spent in the Local Grants round and $17,727.20 was spent in the environmental round, leaving $41,192 and $7,272.80 respectively for two Local and one Environmental rounds.

23.     11 applications have been received towards Quick Response round two, requesting a total of $19,029.85..

24.     Appropriate financial staff have been consulted on this process.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

25.     The allocation of grants occurs within the guidelines and criteria of the Community Grants Policy and the local board grants programme. The assessment process has identified a low risk associated with funding the applications in this round.

Ngā koringa ā-muri

Next steps

26.     Following the Waiheke Local Board allocating funding for the round, the grants staff will notify the applicants of the local board’s decision.

 

 

 

 

 

 

 

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Waiheke Local Board Grants Programme 2024 2025

35

b

Waiheke Quick Response Round Two Application Summary 2024 2025

43

     

Ngā kaihaina

Signatories

Authors

James Boyd - Senior Grants Advisor

Authorisers

Pierre Fourie - Grants & Incentives Manager

Janine Geddes – Acting Local Area Manager

 

 





















































Auckland Transport Kōkiri / Local Board Transport Agreement Quarterly update - March 2025

File No.: CP2025/04413

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To provide an update on projects in the local board’s Kōkiri / Local Board Transport Agreement 2024-2025 (Kōkiri Agreement).

Whakarāpopototanga matua

Executive summary

2.       The Kōkiri Agreement 2024-2025 is a local board’s engagement plan with Auckland Transport’s (AT) work programme.

3.       Developing the agreement is an annual process. During this process AT provides advice on its work programme, seeks feedback from the local board, responds to this feedback, and establishes an endorsed plan for engaging on work in the local board area.

4.       This report provides an update on projects in the local board’s Kōkiri Agreement.

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      whiwhi / receive the December 2024 quarterly update on the Kōkiri / Local Board Transport Agreement 2024-2025.

 

Horopaki

Context

5.       In mid-2023, development of the Kōkiri Agreement was initiated to build a more structured and supportive relationship between local boards and Auckland Transport. The Kōkiri Agreement is formed through an annual process that includes the following steps:

October/November

AT provides quality advice to local boards on the next financial year’s work programme.  

March

Local boards provide their feedback, prioritise projects or programmes, and request levels of engagement for each project.

April/May

AT responds to that feedback, and a Kōkiri Agreement is written for each local board.

June/July

AT seeks formal endorsement of the Kōkiri Agreement from local boards.

6.       AT reports quarterly on the prioritised projects and programmes listed in the local board’s Kōkiri Agreement.

7.       This process provides a clear annual structure for engaging with AT.  Local boards are able to influence Auckland Transport’s work programme through the annual Kōkiri Agreement process.

Tātaritanga me ngā tohutohu

Analysis and advice

8.       Kōkiri Agreements prioritise the projects or programmes that are of most interest to the local board. Clear local board prioritisation provides Auckland Transport with expectations of transport related objectives, in addition to the objectives provided in the local board plan. This information helps AT to either inform its planning or to offer better explanations for why certain projects or programmes cannot be delivered. 

9.       However, plans evolve and change, so AT reports quarterly on progress of projects in the Kōkiri Agreement. This means that local boards are kept informed and have a regular opportunity to provide formal feedback to AT about their work programme.

10.     The levels of engagement in the Kōkiri Agreement are derived from the International Association for Public Participation’s (IAP2) doctrine and are as follows:

Collaboration

AT and the local board work together to deliver the project or programme.  The local board leads the process of building community consensus. The local board’s input and advice are used to formulate solutions and develop plans. Local board feedback is incorporated into the plan to the maximum extent possible.

Consultation

AT leads the project or programme but works with the local board, providing opportunities to input into the plan. If possible, AT incorporates the local board’s feedback into the plan, and if it is not able to, provides clear reasons for that decision.

Informing

AT leads the project or programme informing the local board about progress. Local board members may be asked to provide their local knowledge and insight by AT, however there is no expectation that the project must be modified based on that input.

11.     Attachment A provides updates about all projects and programmes currently listed in this local board’s Kōkiri Agreement 2024-2025.This report also includes the following attachments:

Attachment B is a quarterly update on road maintenance activities

12.     Additionally, AT would like to provide the following updates:

a)   The Local Board Capital Fund projects are mostly making significant progress so additional updates are being provided via memos and workshop briefings.

Tauākī whakaaweawe āhuarangi

Climate impact statement

13.     This report does not have a direct impact on climate, however the projects it refers to will.

14.     AT engages closely with the council on developing strategy, actions and measures to support the outcomes sought by the Auckland Plan 2050, the Auckland Climate Action Plan and the council’s priorities. 

15.     AT reviews the potential climate impacts of all projects and works hard to minimise carbon emissions. AT’s work programme is influenced by council direction through Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan.

 

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

16.     The Kōkiri Agreement is a product of the Local Board Relationship Project. AT started the project in response to a 2022 ‘Letter of Expectation’ directive from the Mayor that stated in part that:

“The Statement of Intent 2023-2026 must set out how AT will achieve closer local board involvement in the design and planning stage of local transport projects that affect their communities.”

17.     The Kōkiri Agreement gives effect to this intent. AT receives local board feedback via regular engagement. AT also surveys local board members quarterly about engagement, providing an indication of satisfaction.  

18.     The Kōkiri Agreement was developed working closely with Auckland Council’s Governance and Engagement Department.

19.     The Kōkiri Agreement is reported to the Local Board Chair’s Forum on a regular basis.

20.     This work relies on historical engagement with both Auckland Council and with other major council-controlled organisations (CCO) through the previous joint CCO engagement plans.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

21.     The local board endorsed the Kōkiri Agreement 2024-2025 at their August business meeting. This report provides a quarterly update on projects in the agreement.

Tauākī whakaaweawe Māori

Māori impact statement

22.     Auckland Transport is committed to meeting its responsibilities under Te Tiriti o Waitangi and its broader legal obligations in being more responsible or effective to Māori. 

23.     AT’s Māori Responsiveness Plan outlines the commitment to 19 mana whenua in delivering effective and well-designed transport policy and solutions for Auckland. We also recognise mataawaka and their representative bodies and our desire to foster a relationship with them. This plan is available on the Auckland Transport website - https://at.govt.nz/about-us/transport-plans-strategies/maori-responsiveness-plan/#about

24.     The Kōkiri Agreement is focused on AT’s interaction with local boards, as such Māori input was not sought at a programme level. However, when individual projects or operational activities have impact on water or land, Auckland Transport engages with iwi to seek their views. These views are shared in reports seeking decisions from the local board.

Ngā ritenga ā-pūtea

Financial implications

25.     Generally, this report has limited financial implications for the local board because Auckland Transport funds all projects and programmes. However, local boards do have a transport budget, called the Local Board Transport Capital Fund.

26.     Updates about Local Board Transport Capital Fund projects are included in this report, but financial implications are reported separately, in project specific decision reports.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

27.     If a local board provides any formal direction on changes to the Kōkiri Agreement, there are risks to consider. First, the local board needs to be able to commit to the time required for the level of engagement requested.  If decisions are not able to be made or are slowed down by local board decision-making, there can be significant financial costs.

28.     Auckland Transport suggests that this risk is mitigated by the local board providing sufficient workshop time to allow for timely discussion of activities listed in Kōkiri Agreement.

Ngā koringa ā-muri

Next steps

29.     After local boards receive this report, AT will respond to any additional resolutions.

30.     The next quarterly report is planned for June 2025.

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Kōkiri Quarterly update - projects and programmes

91

b

Kōkiri Quarterly update - road maintenance activities

99

     

Ngā kaihaina

Signatories

Author

Alex Elton-Farr – Elected Member Relationship Partner

Authorisers

John Gillespie  - Head Stakeholder and Community Engagement

Janine Geddes – Acting Local Area Manager

 











Waiheke Kōkiri Agreement interim report March 2025

File No.: CP2025/04686

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       The purpose of this report is to update the Waiheke Local Board about projects in its 2024-2025 Kōkiri Agreement, and to seek feedback and direction on them.

Whakarāpopototanga matua

Executive summary

2.       This report provides updates and an opportunity to  give feedback or make decisions related to the Waiheke’s Local Board’s Kōkiri Agreement.  Kōkiri is a plan that outlines levels of engagement with local projects between Auckland Transport (AT) and the local board. 

3.       This report confirms completion of public engagement on a Waiheke Local Board Transport Capital Fund project, 1 Surfdale Road to Donald Bruce Road Roundabout cycle paths. Informing the community of the intended project has been undertaken and AT requests the local board now provides direction on the project’s next phase. This project has a ‘Collaborate’ level of engagement so local board feedback is sought through resolution.

4.       This report also confirms completion of public engagement on a Waiheke Local Board initiated project, the permanent closure of The Esplanade to motorised vehicles. Engagement is complete and AT requests the local board consider feedback and provide its direction on the project’s next phase which is detailed design. This project has a ‘Collaborate’ level of engagement so local board feedback is sought through resolution.

 

Ngā tūtohunga

Recommendation/s

That the Waiheke Local Board:

a)      review the 1 Surfdale Road to Donald Bruce Road Roundabout cycle path designs submitted in Attachment A and provide feedback and direction on the project to Auckland Transport through resolution.

b)      consider the community feedback outlined in Attachment B on the proposed closure of The Esplanade to motorised vehicles and provide feedback to Auckland Transport and through resolution authorise Auckland Transport to proceed with the project.

 

Horopaki

Context

5.       AT manages Auckland’s transport network on behalf of Auckland Council. AT’s Kōkiri Agreement provides a structured annual process for local boards to engage with and influence transport projects and programmes. Every year local boards and AT work together to set ‘levels of engagement’ for projects and programmes that AT is delivering. This process clearly defines the board’s expectations and AT’s responsibilities. 

6.       The levels of engagement noted in the Kōkiri Agreement are derived from the International Association for Public Participation’s (IAP2) doctrine, were agreed between Auckland Council and Council Controlled Organisations in 2020; and are as follows:

      Collaborate - AT and the local board are working together to deliver the project or programme. The local board leads the process of building community consensus. The local board’s input and advice are used to formulate solutions and develop plans. Local board feedback is incorporated into the plan to the maximum extent possible.

      Consult - AT leads the project or programme but works with the local board providing opportunities to input into the plan. If possible, AT incorporates the local board’s feedback into the plan; and if it is not able to provides clear reasons for that decision.

      Inform – AT leads the project or programme but works with the local board providing opportunities to input into the plan. If possible, AT incorporates the local board’s feedback into the plan; and if it is not able to provides clear reasons for that decision.

7.       Any ‘Collaborate’ or ‘Consult’ project involves local board decisions that need to be taken and recorded, this report is to provide the decisions relating to the delivery of the following local board transport capital project:

      a) Waiheke Local Board, Local Board Transport Capital Fund project, 1 Surfdale Road       to Donald Bruce Road Roundabout cycle paths. A ‘Collaborate’ level or engagement project in the local board’s Kōkiri Agreement.

      b) Waiheke Local Board initiated project, The Esplanade – Permanent closure to motorized vehicles. A ‘Collaborate’ level of engagement project in the local board’s Kōkiri Agreement.

8.       Submissions not supportive of the proposal had concerns about congestion or other points (noted in the presentation), but not the traffic management aspects of the project. These concerns can be addressed without major changes to the design.

Tātaritanga me ngā tohutohu

Analysis and advice

 

Local Board Transport Capital Fund Cycle Path – 1 Surfdale Road to Donald Bruce Road Roundabout

 

9.       Public consultation was held on the Waiheke 10-year Transport Plan, to communicate the plan and collect feedback. The project team held drop-in sessions at Mātiatia Wharf, Waiheke Library and Ostend Memorial Hall. Each household was provided with a brochure outlining the proposals and a feedback form. The project team also held meetings with some stakeholders, such as local schools. 450 individual pieces of feedback were received. This outcome is indicative of a high level of engagement.

10.     A key recurring theme in the feedback from the engagement was the desire to increase the number of footpaths and cycleways on the island, particularly to make travel safe for school children. In addition, Waiheke’s character should be reflected in the design of the transport network, including the roads, public transport network, footpaths and cycleways. ‘Cycling to school’ represented the highest-ranking supported item in all the feedback

11.     On 25 October 2023 the Waiheke Local Board resolved the decision to allocate $589,789 to continue with the staged design and construction of the cycle infrastructure project - 1 Surfdale Road to Donald Bruce Road Roundabout. Resolution number WHK/2023/143.

12.     AT  engaged with Cycle Action Waiheke (CAW) on 29 February 2024. Stantec were asked to redesign the initial design and produce new concept drawings.

13.     AT met with CAW on 1 August 2024 to present the revised designs that incorporated the feedback from the February 2024 workshop. CAW endorsed AT’s approach at this workshop.

14.     AT met with the Waiheke Local Board on 13 November 2024 and presented the designs that they wish to advance to construction in early 2025. See Attachment A.

 

 

 

 

 

Local Board Initiated Project – Permanent closure of The Esplanade to motorized vehicles.

15.     The Esplanade, between Blackpool Beach and Surfdale Beach was closed off as part of a trial between 2010 and 2011. Due to slips and repairs, the closure was extended until 2013.

16.     The Waiheke Local Board asked AT to look into closing off the unpaved section of The Esplanade to vehicles. This project is a priority under the Waiheke 10-Year Transport Plan.

17.    The proposal includes:

a)   installing swing gates to restrict vehicle motorized vehicle access to the unpaved section of The Esplanade. 

b)   the installation of two gates, one at Blackpool Beach and another at Surfdale Beach. 

c)   allowing access for emergency services and maintenance vehicles when required.

18.    AT propose to install two gates, one at Blackpool Beach and another at Surfdale Beach – indicative images below.

The Esplanada, Waiheke - Permanent Swing Gates Map

A road sign on a road

AI-generated content may be incorrect.

A road sign on a road

AI-generated content may be incorrect.

19.     Making the unpaved section of The Esplanade active modes only would:

a)   improve safety for people walking, cycling and riding horses.

b)   provide an alternative cycling route for visitors away from the main roads.

c)   preserve the narrow, bendy, and unpaved section of The Esplanade.

20.     Emergency vehicles will be able to access this section of road at all times.

21.     AT will continue to maintain the unpaved section of The Esplanade. Auckland Transport will ensure the road can accommodate vehicles in case of an emergency. This is to ensure network resilience. 

22.     AT seeks the Waiheke Local Board’s feedback on this proposal, and a recommendation has been made for this purpose

Collaboration

AT and the local board work together to deliver the project or programme.  The local board leads the process of building community consensus. The local board’s input and advice are used to formulate solutions and develop plans. Local board feedback is incorporated into the plan to the maximum extent possible.

Consultation

AT leads the project or programme but works with the local board, providing opportunities to input into the plan. If possible, AT incorporates the local board’s feedback into the plan, and if it is not able to, provides clear reasons for that decision.

Informing

AT leads the project or programme informing the local board about progress. Local board members may be asked to provide their local knowledge and insight by AT, however there is no expectation that the project must be modified based on that input.

 

 

Tauākī whakaaweawe āhuarangi

Climate impact statement

23.     This report does not have a direct impact on climate, however the projects it refers to will.

24.     AT engages closely with the council on developing strategy, actions and measures to support the outcomes sought by the Auckland Plan 2050, the Auckland Climate Action Plan and the council’s priorities. 

25.     AT reviews the potential climate impacts of all projects and works hard to minimise carbon emissions. AT’s work programme is influenced by council direction through Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

26.     The Local Board Transport Capital Fund projects were initiated by Waiheke Local Board and do not impact on Council facilities. 

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

27.     The Local Board Transport Capital Fund Project, 1 Surfdale Road to Donald Bruce Road Roundabout cycle paths, was initiated by Waiheke Local Board and was workshopped with members prior to this report being submitted. At these workshops, local board members expressed support for the proposal outlined in this report

28.     The Local Board initiated project - The Esplanade, with the proposed closure between Blackpool Beach and Surfdale Beach for motorised vehicles, has been workshopped with the local board where support for the project has been expressed. In the public engagement period between 2 and 31 October 2024, 452 responses from the community were received, with 71% of respondents stating that they supported making the unpaved section of The Esplanade for active modes use only.

29.     29% of people did not support the change as installing the gates would limit access.

Tauākī whakaaweawe Māori

Māori impact statement

30.     AT is committed to meeting its responsibilities under Te Tiriti o Waitangi and its broader legal obligations in being more responsible or effective to Māori. 

31.     AT’s Māori Responsiveness Plan outlines the commitment to 19 mana whenua in delivering effective and well-designed transport policy and solutions for Auckland. We also recognise mataawaka and their representative bodies and our desire to foster a relationship with them. This plan is available on the Auckland Transport website - https://at.govt.nz/about-us/transport-plans-strategies/maori-responsiveness-plan/#about

32.     The Kōkiri Agreement is focused on AT’s interaction with local boards, as such Māori input was not sought at a programme level. However, when individual projects or operational activities have impact on water or land, Auckland Transport engages with iwi to seek their views. These views are shared in reports seeking decisions from the local board.

Ngā ritenga ā-pūtea

Financial implications

33.     For the cycle path project, the Waiheke Local Board have already committed funds from the local board transport capital fund to progress this project.

34.     For The Esplanade project, AT has committed to fully fund the design and installation of the gates as well as the associated costs arising from the project.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

35.     The proposed decisions do have intrinsic elements of risk, any construction project can be affected by a range of factors including weather, contract availability or discovery of previously un-identified factors like unmapped infrastructure.

36.     AT manages risk by retaining a 10% contingency on the projects and historically there are several occasions in the organisation has used budget surpluses in other programmes to support delivery of the Local Board Transport Capital Fund. However, there is always a small risk that more money may be required from the Local Board Transport Capital Fund.

Ngā koringa ā-muri

Next steps

37.     With support from the Waiheke Local Board the projects will both progress to final detailed design and implementation anticipated to commence in May 2025 for the cycle path and June for The Esplanade.

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Community feedback report - The Esplanade

107

b

Cycleways designs

119

     

Ngā kaihaina

Signatories

Author

Alex Elton-Farr – Elected Member Relationship Partner

Authorisers

John Gillespie  - Head Stakeholder and Community Engagement

Janine Geddes – Acting Local Area Manager

 

 
























Kōkiri - Setting priorities for Auckland Transport project and programme engagement

File No.: CP2025/04405

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To provide feedback on Auckland Transport’s proposed work programme for 2025-2026.

Whakarāpopototanga matua

Executive summary

2.       Auckland Transport has been building a more structured and effective process for local boards to engage with and influence transport projects and programmes.

3.       At this stage in the second year of Kōkiri (part of the Local Board Relationship Project), Auckland Transport is seeking formal views on the proposed work programme for 2025-2026.

4.       Auckland Transport workshopped the forward works programme with the local board on 6 November 2024.

5.       After the local board provides formal views, Auckland Transport will provide a response to the local board before delivering a draft local board transport agreement (Kōkiri) to June 2025 business meetings for adoption.

 

Ngā tūtohunga

Recommendation/s

That the Waiheke Local Board:

a)      Receive the Forward Works Programme brief, considered the information provided and board requests Auckland Transport to apply the following levels of engagement to these projects:

i)       Collaborate

A   Local Board Transport Capital Fund (LBTCF) Cycle Path project – Surfdale to Oneroa.

B   The Esplanade. Proposed closure of The Esplanade to motorised vehicles.

C   The LBTCF Waiheke School raised crossing project on Seaview Road.

ii)       Consult

A   Mātiatia Wharf Renewal Programme – Pier 2, Coastguard & Canopies.

B   Mātiatia minor safety improvements projects – TBC.

    

iii)      Inform. 

A      Road Safety, Katoa Ka Ora and the potential for roads to revert to speeds where they were reduced under this program.

B   Awaawaroa Road Bridge project.

C   Footpath renewals in the local board area.

 

 

 

b)      Provides any projects or programmes for Auckland Transport to consider for inclusion in future work programmes.

c)       Provides any projects or programmes for Auckland Transport to review that are not supported by the local community.

Horopaki

Context

Project Kōkiri

6.       In mid-2023, Kōkiri was initiated to build a more structured and supportive relationship between local boards and Auckland Transport (AT).

7.       The project was in part a response to the 2020 Review of Auckland Council’s Council-controlled Organisations which highlighted the need for local boards and Auckland Transport to work more meaningfully and collaboratively.

8.       AT has taken steps to improve information flow and local board decision-making, including:

·    establishing an annual forward works programme briefing for all local boards

·    increasing the number of updates sent to local boards

·    providing local board insights in all project engagement

·    participating in Auckland Council’s CCO Engagement Plan reporting.

9.       Auckland Transport aims to provide a better basis for communication and understanding of roles, responsibilities, limitations, and opportunities. 

10.     The overall purpose of this process is to identify local board interest in AT projects and programmes and to clearly express the preferred levels of local board engagement.

11.     The levels of engagement are derived from the International Association for Public Participation’s (IAP2) doctrine; and are as follows:

Collaboration

AT and the local board are working together to deliver the project or programme.  The local board leads the process of building community consensus. The local board’s input and advice are used to formulate solutions and develop plans. Local board feedback is incorporated into the plan to the maximum extent possible.

Consultation

AT leads the project or programme but works with the local board providing opportunities to input into the plan. If possible, AT incorporates the local board’s feedback into the plan; and if it is not able to provides clear reasons for that decision.

Informing

AT leads the project or programme informing the local board about progress. Local board members may be asked to provide their local knowledge and insight by AT, however there is no expectation that the project must be modified based on that input.

Tātaritanga me ngā tohutohu

Analysis and advice

12.     AT first provided quality advice on the forward works programme at a workshop on 6 November 2024.

13.     This report seeks to confirm local board feedback on the proposed work programme and seek views on how the local board wants to work together with Auckland Transport.

14.     Auckland Transport recommends that the local board prioritises work programme items aligned to transport goals stated in their local board plan.

15.     The local board should prioritise a list of projects and programmes for each of the three levels of engagement (collaborate, consult and inform).

16.     Auckland Transport resource is limited. Projects in the collaborate and consult require significant staff and elected member time such as:

·    providing quality advice, including technical advice on options and their costs as well as benefit analysis.  Often this advice involves written advice and the opportunity to ask experts questions at a workshop.

·    considering the advice, time is required for members to process and understand the advice provided.

·    making a formal decision, i.e. feedback about a project or programme requires a report to be submitted and a resolution made at a public meeting.

17.     Auckland Transport recommends the local board reserves categorising projects in collaborate and consult for the projects of highest priority, such as local board transport capital fund projects.

18.     Other projects and programmes that may be at the ‘collaborate’ level include any projects which the local board has delegated financial control over either by AT, council or by another government agency like New Zealand Transport Agency.

19.     There may also be projects or programmes that a local board wants to deliver but is not currently identified in AT planning. Local boards may choose to advocate for these projects or programmes.

20.     There may be projects or programmes that the local board considers are not supported by the community it represents.  This report provides an opportunity for the local board to express its community’s concerns about proposed work. AT will consider and may decide not to proceed with these projects based on the local board’s feedback.

Tauākī whakaaweawe āhuarangi

Climate impact statement

21.     AT engages closely with the council on developing strategy, actions and measures to support the outcomes sought by the Auckland Plan 2050, the Auckland Climate Action Plan and the council’s priorities. 

22.     AT reviews the potential climate impacts of all projects and works hard to minimise carbon emissions. AT’s work programme is influenced by council direction through Te-Tāruke-ā-Tāwhiri: Auckland’s Climate Plan.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

23.     In 2022, the mayor provided Auckland Transport with a Letter of Expectation which directed AT to improve the relationship with local boards, including providing more opportunity to influence decision-making. Specifically, that:

“The Statement of Intent 2023-2026 must set out how AT will achieve closer Local Board involvement in the design and planning stage of local transport projects that affect their communities.”

24.     AT’s ‘2023-26 Statement of Intent’ reflects this direction stating that:

“We (AT) will engage more meaningfully and transparently with Local Boards, recognising that they represent their communities, and that they should have greater involvement in local transport projects that affect those communities. This means a genuine partnership where we seek to understand the unique and diverse needs of each Local Board at a regional level, not just by project. We will work in partnership to integrate those needs into our planning. We will support Local Boards to communicate integrated local transport planning to their communities.”

25.     Project Kōkiri provides an annual process where local boards prioritise a group of key programmes or projects, identifying them to AT, and setting engagement levels that capture the local board’s expectations. This plan forms the basis for regular reporting on key programs and projects.  Project Kōkiri will be supported by regular updates to provide transparency.

26.     Project Kōkiri was developed working closely with Auckland Council’s Governance Division.  It has also been reported generally monthly to the Local Board Chair’s Forum and discussed with a reference group of local board chairs.

27.     Further, this work relies on historical engagement with both Auckland Council and with other CCOs.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

28.     The local board had a forward works programme briefing workshop on 6 November 2024 to receive quality advice on the programme. The response from both elected members and staff supporting local boards has been positive. They have been specifically supportive of the large amount and quality of information provided, the detailed discussion with subject matter experts, and attendance at workshops by AT executive leaders.

Tauākī whakaaweawe Māori

Māori impact statement

29.     Auckland Transport is committed to meeting its responsibilities under Te Tiriti o Waitangi and its broader legal obligations in being more responsible or effective to Māori.

30.     AT’s Māori Responsiveness Plan outlines the commitment to 19 mana whenua tribes in delivering effective and well-designed transport policy and solutions for Auckland. We also recognise mataawaka and their representative bodies and our desire to foster a relationship with them. This plan is available on the Auckland Transport website - https://at.govt.nz/about-us/transport-plans-strategies/maori-responsiveness-plan/#about

Ngā ritenga ā-pūtea

Financial implications

31.     This decision has no financial implications for Waiheke Local Board because Auckland Transport funds all projects and programmes.

32.     Local boards do have a transport budget through the local board transport funds, and these projects are included in this report. However, their financial implications are reported separately.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

33.     The proposed decision does carry some risk. First, the local board needs to be able to commit to the time required for the level of engagement requested.  If decisions are not able to be made or are slowed down by local board decision-making, there can be significant financial costs to AT and therefore the ratepayer.

Ngā koringa ā-muri

Next steps

34.     After receiving this report, AT will review the formal feedback from all local boards.

35.     AT may engage with the local board directly after receiving their formal resolutions to clarify positions or to discuss the proposed levels of engagement.

36.     By mid-May 2025, AT will provide a memo outlining its response to this report. This memo will provide the basis for future engagement.

37.     In June 2025, AT will draft a report with an attached annual ‘Kōkiri’ (local board transport agreement) stating how AT and the local board will engage over the next 12 months.

 

Ngā tāpirihanga

Attachment

No.

Title

Page

a

Auckland Transport Forward Works Plan brief workshop presentation 6 November 2024

135

     

Ngā kaihaina

Signatories

Author

Alex Elton-Farr – Elected Member Relationship Partner

Authorisers

John Gillespie  - Head Stakeholder and Community Engagement

Janine Geddes – Acting Local Area Manager

 

 
































































Local board input into Auckland Council’s submission on the Term of Parliament (Enabling 4-year Term) Legislation Amendment Bill

File No.: CP2025/03874

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To seek feedback from the local board on the Term of Parliament (Enabling 4-year Term) Legislation Amendment Bill.

Whakarāpopototanga matua

Executive summary

2.       The Term of Parliament (Enabling 4-year Term) Legislation Amendment Bill proposes a mechanism for extending New Zealand’s parliamentary term from three to four years, subject to a binding referendum.

3.       Rather than mandating an automatic change, this would allow Parliament to extend its term only if select committees reflect proportional representation – meaning the number of MPs from each party on committees matches their share of seats in Parliament.

4.       Supporters argue a four-year term enables better policymaking and project delivery, while opponents highlight reduced electoral accountability. New Zealand’s three-year term is rare globally, and past referendums have opposed extending it, though recent reviews suggest shifting public sentiment.

5.       A key consideration for Auckland Council is the potential impact on local election cycles. There could be years where local and central elections coincide, which could impact voter engagement. Fixed parliamentary terms would benefit the alignment of local election timing.

6.       In December 2024, the council submitted feedback on the LGNZ Electoral Reform Working Group Issues Paper, supporting a four-year electoral cycle for local government. The submission acknowledged potential benefits of aligning local and central elections if local elections shift to booth voting but recommended keeping them two years apart otherwise. While most local boards supported a four-year term, views varied on election timing—some favoured aligning with central elections, while others preferred a two-year gap.

7.       The Policy and Planning Committee will consider the council’s submission on 10 April. The submission closing date is 17 April.

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      tuku / provide feedback to Auckland Council’s submission on the Term of Parliament (Enabling 4-year Term) Legislation Amendment Bill.

 

Horopaki

Context

Overview of the Bill

8.       The Term of Parliament (Enabling 4-year Term) Legislation Amendment Bill (“the Bill”) proposes a mechanism to extend the current three-year Parliamentary term to four years, subject to a binding referendum.

9.       The Bill doesn’t automatically change the term to four years. Instead, Parliament can choose to extend its term from three to four years if select committees are structured in a way that fairly reflects the makeup of Parliament. To make this happen, Parliament must pass a resolution within the first three months of a new term stating that the proportionality requirement has been met, and the Governor-General must then issue a proclamation.

Key Considerations

10.     Arguments in favour of a four-year term include allowing for a more deliberate and considered legislative process, reducing the frequency of election cycles, and providing governments with a longer timeframe to implement policy.

11.     Arguments against a four-year term highlight concerns around democratic accountability. A longer term would mean elected representatives face elections less frequently, shifting accountability from a three-year to a four-year cycle.

12.     Additionally, New Zealand’s constitutional framework differs from jurisdictions with stronger checks and balances, such as an upper and lower house or a clearer separation of executive and legislative powers. In New Zealand, the executive is formed from the majority party in Parliament and drives the legislative agenda.

13.     To address concerns around accountability, the Bill strengthens the role of select committees by requiring their composition to more accurately reflect the proportionality of Parliament.

History of New Zealand Parliamentary terms

14.     New Zealand originally had a five-year parliamentary term, in line with Britain. In 1879, it was reduced to three years following the abolition of provincial governments, as there were concerns about the concentration of power at the central level. Reducing the term ensured more frequent electoral accountability.

15.     Two non-binding referendums on extending the term—held in 1967 and 1990—both resulted in strong opposition. Both referendums saw large majorities opposed to extending the term to four years.

16.     Recent reviews, including the 2013 Constitutional Advisory Panel and the 2023 Independent Electoral Review, suggest public opinion may be shifting towards a four-year term.

17.     A key change since the last referendum was the introduction of the Mixed-Member Proportional (MMP) system in 1993, which increased proportional representation and strengthened the role of smaller parties in governance. While MMP has enhanced legislative scrutiny, concerns remain about reduced accountability if the term is extended.

18.     The Constitutional Advisory Panel in 2013 found that public support for a four-year term was contingent on improved legislative scrutiny and accountability measures, such as more referenda, better human rights assessments, and the introduction of an upper house. The panel emphasised that any extension should be decided by referendum.

19.     The Independent Electoral Review (IER), set up in 2022, also assessed the term length and found arguments for and against a four-year term to be finely balanced.

International context

20.     New Zealand’s three-year parliamentary term is rare internationally. In 183 countries with elected lower houses or unicameral parliaments, only eight have a term of three years or less, 72 have a four-year term, 99 have a five-year term and four have a six-year term.

21.     In general, parliaments (whether unicameral or bicameral) have a four-year or five-year term including both the United Kingdom (with Westminster-style of Parliament and Executive, headed by a sovereign) and Germany (with an MMP electoral system), from which New Zealand’s system is based.

Tātaritanga me ngā tohutohu

Analysis and advice

22.     The last referendum on the parliamentary term took place in 1990 in which 69 per cent of voters rejected extending the term from three to four years. It is timely to revisit the topic again with communities.

23.     A key concern for local government is the uncertainty around whether Parliament will adopt a three-year or four-year term. If local government maintains its three-year term while Parliament alternates between three and four years, there is likely to be occasional overlap, where parliamentary and local elections occur in the same year. However, this would likely happen inconsistently.

24.     If local elections remain the responsibility of councils (rather than the Electoral Commission), the concurrent timing of parliamentary and local elections could lead to voter confusion.

25.     Auckland Council, in its submission to the Electoral Reform Working Group, acknowledged that there could be potential benefits if local elections were conducted by the Electoral Commission, using the booth voting method, alongside parliamentary elections. This could capitalise on the higher voter turnout for parliamentary elections to boost participation in local elections. However, it remains uncertain whether this will occur.

26.     As a result, the council’s draft submission on the bill would consider requesting that parliamentary terms be fixed, and that the legislation governing local elections be amended to align with parliamentary terms.

Tauākī whakaaweawe āhuarangi

Climate impact statement

27.     The Bill does not have any direct climate impacts.

28.     However, a four-year term could provide a longer, uninterrupted timeframe for planning and implementing climate-related initiatives.

29.     If both local and central government terms are fixed at four years, this could lead to a reduction in postal voting for local government elections. This change may result in environmental benefits, such as reduced paper usage and a decrease in transport requirements for the delivery and collection of voting papers.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

30.     The council group is not directly affected by the proposed change. However, if local and central elections were to coincide, further analysis of the potential impacts would be necessary.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

31.     In February 2023, nine local boards provided feedback on the introduction of a four-year electoral term for local government in the draft submission of the Future for Local Government paper. Most supported a four-year term, though views on election sequencing varied. One board opposed aligning local and central elections, emphasising the importance of maintaining local focus. 

32.     In November 2024, local boards provided further feedback to inform the council’s submission on the LGNZ Electoral Reform Working Group Issues Paper (Issue Five), which also addressed the four-year term. While most local boards supported the shift, there were differing views on election timing—some favored aligning local and central elections, while others preferred a two-year gap. Local board views are compiled here.

 

Tauākī whakaaweawe Māori

Māori impact statement

33.     Māori views were not sought in the preparation of this report. A four-year term could allow more time to build relationships and ensure continuity in key initiatives, without disruptions from frequent election cycles.

Ngā ritenga ā-pūtea

Financial implications

34.     The Bill does not impose any direct costs. Potential cost efficiencies could arise if central and local elections coincide.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

35.     The council's position on this matter presents minimal risk.

Ngā koringa ā-muri

Next steps

36.     The Policy and Planning Committee will consider approving the council’s submission at its meeting on 10 April.

37.     Submissions close on Thursday, 17 April.

 

Ngā tāpirihanga

Attachments

There are no attachments for this report.     

Ngā kaihaina

Signatories

Authors

Maclean Grindell - Senior Advisor Operations and Policy

Warwick McNaughton - Principal Advisor Governance

Authorisers

Janine Geddes - Acting Local Area Manager

Oliver Roberts - Planning & Operations Manager

 

 


Waiheke Local Board feedback on the proposed wastewater environmental performance standards

File No.: CP2025/04715

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To invite local board to provide input to the council’s upcoming submission to central government’s public consultation on proposed wastewater environmental performance standards by the Water Services Authority – Taumata Arowai.

Whakarāpopototanga matua

Executive summary

2.       The Water Services Authority – Taumata Arowai, on behalf of the Minister of Local Government, has made available for consultation until 24 April 2025 a discussion document on proposed wastewater environmental performance standards (Help shape New Zealand’s wastewater future - Taumata Arowai - Citizen Space).

3.       The purpose of the wastewater standards, proposed under regulation-making powers of the Water Services Act 2021, is to set nationally consistent requirements for all public wastewater networks and operators through resource consents. The proposed standards are intended to apply as these consents expire and are replaced or are issued for new wastewater infrastructure.

4.       The proposed wastewater standards in this initial package will cover discharges to water, discharges to land, beneficial reuse of biosolids, and arrangements for wastewater network overflows and bypasses of wastewater treatment plants. Local boards were provided with a memo on 14 March 2025, which provides more information on the proposal (see Attachment A).

5.       From a council perspective, the key issue will be whether these national wastewater standards potentially constrain the range of tools available to achieve appropriate environmental outcomes in different receiving environments, bearing in mind that there are multiple stressors within a catchment for the relevant contaminant. Councils use a range of tools to achieve environmental outcomes, including parameters managed through resource consents, that gives effect to Resource Management Act planning provisions (e.g. National Policy Statement for Freshwater Management).

6.       Wastewater standards that are beyond challenge may save time and money by simplifying consenting, design and procurement of some elements of public wastewater plants. The assessment of cumulative effects will continue to be a challenge, as well as attributing mitigation actions for contributing parties, beyond wastewater discharges from public networks.

7.       Policy department staff (Natural Environment Strategy unit) are coordinating the preparation of a council group submission. Local board feedback is due 4 April 2025.

8.       Central government’s intention is to finalise regulations for the initial package of wastewater standards before the end of 2025.

 

 

 

 

 

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      tuku / provide feedback to the council’s submission on proposed wastewater environmental performance standards by the Water Services Authority – Taumata Arowai.

 

 

Ngā tāpirihanga

Attachment

No.

Title

Page

a

Attachment A – Memorandum

203

     

Ngā kaihaina

Signatories

Authors

David Allen – Manager, Natural Environment Strategy

Authorisers

Lou-Ann Ballantyne - General Manager Governance and Engagement

Louise Mason – General Manager

Janine Geddes – Acting Local Area Manager

 

 







Waiheke Local Board views on the draft Contributions Policy 2025

File No.: CP2025/04788

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To invite local board views on the draft Contributions Policy 2025 for inclusion in the Governing Body decision report on 1 May 2025

Whakarāpopototanga matua

Executive summary

2.       The most-recent full review of the contributions policy, was completed and adopted in December 2021, based on the investments in the Long-term Plan 2021-2031. This was operational from 10 January 2022.

3.       In April 2023, the Governing Body adopted the Contributions Policy 2022 Variation A which added investments over a 30-year period to support growth in Drury.

4.       In June 2024, the council adopted its new Long-term Plan 2024-2034, which sets out capital expenditure plans for this period. The Contributions Policy 2025 now proposed for adoption reflects these decisions.

5.       The draft Contributions Policy 2025 also includes investments over a longer time horizon for the Inner Northwest, and Auckland Housing Programme (AHPs) and to update the investments to be made in Drury beyond 2031. This follows through on the agreement in principle from December 2021 (FIN/2021/119) and subsequent noting in April 2023 (GB/2023/63).

6.       The remaining Investment Priority Area (IPA), the City Centre/City Rail Link (CRL) stations, will be added as a next step later in 2025/early 2026 as more information becomes available, Also in this timeframe updates will be made for additional investments in Drury West, and stormwater in Mt Roskill and Māngere.

7.       The Governing Body approved consultation on the draft Contributions Policy 2025 in September 2024 and consultation took place from September to December 2024.

8.       A memorandum and summary of feedback received from consultation was circulated to all local board and Governing Body members in February 2025. These are attached to this report as Attachment F.

9.       This was followed up with Subject Matter Expert (SME) attendance at local board workshops as requested by individual local boards.

10.     Any local board views agreed through this report will form an attachment to the decision-making report being presented to Governing Body on 1 May 2025.

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      tuku / provide views on the draft Contributions Policy 2025 for inclusion in the Governing Body decision report on 1 May 2025.

 

Horopaki

Context

11.     Development contributions (DCs) allow for an equitable and proportionate share of the total cost of growth-related capital expenditure to be recovered from the development community. The Contributions Policy sets out how the council will recover from new development an appropriate and fair share of the cost of infrastructure investment attributable to growth.

12.     Auckland's population has grown substantially over the 12 years to the end of 2024, from 1.4 million to over 1.8 million at an average of 1.4 per cent annually. It is forecast to continue to grow, with approximately 200,000 more Aucklanders expected by 2034. The population is expected to grow by a further 400,000 by 2054[1].

13.     To support the development enabled by the Auckland Unitary Plan, we are facing both immediate and longer-term demands for infrastructure in growth areas. If we do not adequately plan for the delivery and funding of this infrastructure, the cumulative effects of this development could lead to an unfair rates burden on future ratepayers or a risk of infrastructure shortfalls for future residents.

14.     Auckland Council’s current contributions policy was introduced in January 2022 and later updated from June 2023 to extend cost recovery in Drury over a 30-year period instead of the previous 10-year approach.

15.     Between September and November 2024, the council consulted on a proposal to adopt a new policy that incorporates updated capital expenditure from the Long-term Plan 2024-2034, revised growth and interest rate forecasts, adjustments to project costs, and extended investment planning for Drury.

16.     The proposed policy also expands the 30-year cost recovery model to other Investment Priority Areas, including the Inner Northwest (Red Hills, Westgate, and Whenuapai) and Auckland Housing Programme (AHP) areas in Tāmaki, Māngere, and Mt Roskill. In addition, several smaller adjustments aim to ensure fairer cost distribution between ratepayers and developers.

17.     The policy proposed for consultation included $10.3 billion in growth-related capital investment in the period to 2034, increasing the average development contribution from $21,000 to $30,000, while contributions in Drury would rise from $70,000 to $83,000. The proposed policy also provided for $10.9 billion of investment in Drury, Inner Northwest, and the AHP areas in the period beyond 2034. With these investments included the average DC price across the region would rise to $50,000. Different charges apply to different geographical areas based on the relevant activity funding areas in the proposal.

18.     The Consultation Document (CD) provided to support consultation set out the key issues to be considered in assessing the proposal. The CD can be found at Attachment C. The key changes set out in consultation are summarised below.

Update for decisions in the LTP 2024-2034 and updates to Drury

19.     The draft Contributions Policy 2025 that was consulted on updated the capital expenditure projects to reflect the decisions made since 2021 and the associated investment planned over the 10-year timeframe of the LTP.

20.     The key changes include:

·        Level crossings – Takanini ($550 million)

·        Development of new town square in Henderson ($12.5 million)

·        Waterview catchment separation ($59 million) – updated costs.

21.     The current contributions policy included projects which are now funded as part of the NZ Upgrade Programme. Government decisions on the NZ Upgrade Programme had not been made at the time the Contributions Policy 2022 Variation A was adopted. We are now removing these projects from the policy as they are not expected to require council funding and there is no basis to recover any costs for them. Contributions collected for these projects to date will be re-allocated against similar projects within the same funding area.

22.     The assessment of requirements for stormwater infrastructure in Drury has now been completed. This identified one project the council would need to deliver in addition to those that would be provided by developers as a condition of resource consent, and this has been included in the draft policy. Some adjustments have now also been made to the timing of projects including reducing investment and deferral of the timing of open space acquisitions. The assumptions made for investments in Drury over the longer horizon have also been reviewed based on the latest available information and the capital expenditure included in the policy has been updated. This includes updated land cost assumptions, alignment with the Cost Estimation guide published by Auckland Transport, and the latest growth forecasts. These changes raised the DC price for Drury that was consulted on from $70,000 to $83,000.

23.     The draft policy will include a list of over 1,700 programmes and projects for which the council will seek to recover the growth share of costs through development contributions (see Attachment B).

24.     The table below shows the total investments with a growth component in transport, stormwater, reserves, and community facilities over the LTP period and their funding source in the CD. In this analysis and that which follows later it is assumed that National Land Transport Fund from Waka Kotahi will fund 51 per cent funding of qualifying transport projects.

Funding source

 

CAPEX investment type $ millions

Transport

Reserves

Community spaces

Stormwater

Total funding

Total NZTA/Waka Kotahi

3,569

0

0

0

3,569

Total rates

3,072

557

301

463

4,393

Total development contributions

893

1,005

127

309

2,334

Total CAPEX

7,534

1,562

428

772

10,296

 

25.     As a result of the capital expenditure changes in the period to 2034, updated forecasts of NZTA/Waka Kotahi funding and dwelling construction, and adjustments to the investments in Drury before and after 2034 the weighted average development contributions price for a standard residential unit would rise from $21,000 under the Contributions Policy 2022, Variation A to $30,000 under the draft Contributions Policy 2025. The average price increase is driven by the increased level of investment within the LTP period in the Investment Priority Areas (IPA). This is a weighted average and varies widely by location depending on the investments the council plans to make to support growth in each area.

Inclusion of investments in IPA areas beyond 2034

26.     The consultation proposed the addition of investments beyond 2034 to support growth in the IPA areas. The proposed investments and consequent changes to DC prices for each of the IPA areas is set out below.

Inner Northwest

27.     The LTP provides for investment of $155 million in transport and $139 million in reserves between 2024 and 2034. The table below shows the investments with a growth component in transport, reserves, and community facilities beyond 2034 and their funding sources. No stormwater investment is required by the council as the nature of infrastructure needed in this area is such that it is expected to be delivered by developers as a condition of resource consent.

Total investments and funding source by activity in the Inner Northwest over a longer horizon

$ millions

Funding source

Transport

Reserves

Community facilities

Total NZTA/Waka Kotahi

1,142

0

0

Total rates

558

118

82

Total development contributions

1,366

903

133

Total CAPEX

3,066

1,021

215

 

28.     The additional funding requirement would increase the contributions price for the Inner Northwest from an average of $25,167 per household unit equivalent (HUE) to an average of around $98,000 per HUE when the investments beyond 2034 are added. Different charges apply to different geographical areas based on the relevant activity funding areas in the proposal. The proposed charges are set out in the table below.

Changes to funding area charges in the Inner Northwest over a longer horizon

 

Funding area

Current DC charge

Proposed DC for investments within the LTP period incl regional and sub-regional DCs

Proposed DC price for investments beyond LTP

Total proposed price including all investments incl regional and sub-regional DCs

Whenuapai

$25k

$27k

$75k

$102k

Redhills

$25k

$27k

$62k

$89k

Westgate

$23k

$34k

$61k

$95k

 

Māngere Auckland Housing Programme area

29.     The LTP provides for investment of $46 million in transport and $23 million in reserves between 2024 and 2034. The table below shows the transport investments with a growth component beyond 2034 and their funding sources. Investments in stormwater infrastructure will be added in 2025 once further work is completed.

Total investments and funding source by activity in Māngere over a longer horizon

$ millions

Funding source

Transport

Reserves

Community facilities

Total NZTA/Waka Kotahi

292

0

0

Total rates

531

0

0

Total development contributions

89

0

0

Total CAPEX

912

0

0

 

30.     The additional funding requirement would increase the contributions price for the Māngere Auckland Housing Programme from an average of $18,123 per HUE to an average of around $29,000 per HUE when the investments beyond 2034 are added.

 

Mt Roskill Auckland Housing Programme area

31.     The LTP provides for investment of $44 million in transport and $15 million in reserves between 2024 and 2034. The table below shows the transport investments with a growth component beyond 2034 and their funding sources. Investments in stormwater infrastructure will be added in 2025 once further work is completed.

Total investments and funding source by activity in Mt Roskill over a longer horizon

$ millions

Funding source

Transport

Reserves

Community facilities

Total NZTA/Waka Kotahi

594

0

0

Total rates

677

0

0

Total development contributions

344

0

0

Total CAPEX

1,615

0

0

 

32.     The additional funding requirement would increase the contributions price for the Mt Roskill from an average of $20,406, per HUE to an average of around $52,000 per HUE when the investments beyond 2034 are added. Different charges may apply depending on the combination of activity funding areas a development falls within. The primary driver of the higher DCs in the above range is the recovery of historic stormwater investments in the Inner West Triangle and the Waitematā Central funding areas.

Tāmaki Regeneration area

33.     The LTP provides for investment of $76 million in transport, $67 million in stormwater, $87 million in reserves, and $1 million in community facilities between 2024 and 2034. The table below shows the investments with a growth component in transport, community facilities and stormwater beyond 2034 and their funding sources.

Total investments and funding source by activity in Tāmaki over a longer horizon $ millions

Funding source

Transport

Reserves

Community facilities

Stormwater

Total NZTA/Waka Kotahi

181

0

0

0

Total rates

194

0

41

18

Total development contributions

171

0

19

788

Total CAPEX

546

0

60

806

 

34.     The standard of service for stormwater in Tāmaki has been planned to deliver the same level of service as in the Inner Northwest and Drury. This is higher than the service level presently provided by historical investment in the other brownfields areas that aren’t expected to develop. Accordingly, the scale of and cost of the investment required to redevelop the area is substantial.

35.     The additional funding requirement would increase the contributions price for Tāmaki from $31,157 per HUE to $119,114 per HUE when the investments beyond 2034 are added.

 

 

 

Other proposed changes to the policy

Funding areas

36.     Changes were proposed to funding areas to provide a more refined allocation of costs to development areas to better reflect beneficiaries of the planned infrastructure. The new proposed funding areas include:

·        new sub-regional funding areas at Paerata, Whau, Inner Northwest

·        a new local funding area at Avondale.

37.     Changes to neighbouring funding areas were proposed to accommodate these new areas.

38.     A number of other refinements were proposed to local and sub-regional funding areas to better reflect the beneficiaries of infrastructure. Details of these changes are included in Attachment E: Funding area maps.

Other changes

39.     Some technical changes were proposed to the policy to clarify its intent and ensure fairness. Changes were highlighted in the draft policy in Attachment A.

40.     Aside from the proposed changes discussed, the Contributions Policy 2022, Variation A was recommended as appropriate and fit for purpose and it was proposed to continue the unamended provisions in the current policy into the new policy.

Tātaritanga me ngā tohutohu

Analysis and advice

41.     Key issues addressed in the CD related to the uncertainty inherent in taking a 30-year view of growth and the infrastructure investment required to support that along with the impact that higher DCs would have on current landowners planning to develop and whether higher DCs would impact on house prices. Key points made in the advice that supported the adoption of the draft policy for consultation on these issues is set out below. Further advice on these matters and other issues raised in consultation will form part of the advice to the council on 1 May.

42.     The uncertainty associated with long-term planning is managed through the three-yearly review of our infrastructure planning priorities and funding through the council’s LTP. This allows the council to manage the risk of the pace of growth changing from our forecasts and consequent changes in the required infrastructure.

43.     Continuing with a 10-year focus would continue the uncertainty for developers, landowners, and other infrastructure providers. It would also make it difficult to recover a fair share of the funding of expected capital expenditure in years 11-30 from early developers to address the longer-term cumulative impacts of their development. This would risk development occurring without adequate infrastructure and place more demand on future ratepayers.

44.     These changes will not materially impact on house prices, which are driven by supply and demand and are not determined via a cost-plus methodology. That is, the developers are price takers. Their market power is limited, given they are part of a larger market, and their products are substitutable for near equivalents. Higher DC prices will eventually flow through to lower prices for raw land as the cost of enabling infrastructure is capitalised into the land value. However, they may have a short-term negative impact on the pace of development as developers respond to the change. Developers must absorb the cost into a lower land value. Depending on their financial position, they may either proceed with development, defer development and hold the land awaiting future value uplift, or on-sell the land to another developer.  Staff consider that these short-term effects are outweighed by better cost signalling and associated longer-term benefits.

45.     As these investments are being planned over decades, they are subject to refinement as investment plans are developed further, development intentions change, and economic conditions fluctuate. Future contributions policies will be updated as more refined information becomes available.

Consultation

46.     Public consultation ran from 30 September to December 2024, featuring webinars, in-person events, and an opportunity for submitters to present directly to councillors.

47.     Materials released to support consultation included the following documents attached to this report:

·        Attachment A: Draft Development Contributions Policy 2025

·        Attachment B: Schedule 8 Assets for which development contributions (DCs) will be used

·        Attachment C: Consultation Document - Contributions Policy 2025

·        Attachment D: How we set Development Contributions – Cost Allocation Methodology

·        Attachment E: Funding area maps.

Feedback received

48.     A total of 147 submissions were received, including 46 from organisations. 

49.     Key concerns raised included the impact of higher contributions on house prices and development, uncertainty around 30-year planning and cost escalation, the scale of stormwater investment in Tāmaki, delays in infrastructure investment, consideration of alternative funding sources, transparency of information, and specific issues with funding areas and projects.

50.     A full analysis of the feedback can be found in Attachment F.

Updates for Final Policy for Adoption

51.     Officers are analysing the points raised in the submissions. Advice on these points and further analysis conducted since the consultation process, including updated growth and economic forecasts, will be incorporated in advice to the Governing Body for decision making, planned for 1 May 2025. Potential changes to the proposed policy will also be presented at that time.

52.     The Government has announced intended reforms to infrastructure funding and financing as part of the Going for Housing Growth policy program. The reforms are planned for implementation alongside council long-term plans in 2027. The exact form the reforms take will only be confirmed once legislation has passed. Staff consider that the Contributions Policy will still be required for at least the next two years and the council should continue with the updates and improvements proposed.

Tauākī whakaaweawe āhuarangi

Climate impact statement

53.     Planning now for the funding of investments to support growth in the IPAs will ensure that the council is better able to deliver the infrastructure required for development in the IPAs to manage climate impacts of development and to connect to the rest of the city with a reduced climate impact. The proposal provides for early developers to meet a share of the costs of the infrastructure they will benefit from and create the need for, to address the cumulative impacts of growth.

54.     If plans for securing a share of funding with DCs from early developers aren’t made now, greater demands will fall on future ratepayers to deliver this infrastructure. While adjustments can be made to the DC policy in the future these can’t retrospectively secure revenue from early developers. General rates are the only practical alternative funding source to make up this shortfall. Given the competing demands on general rates there is a real risk that all the funding required won’t be available in the future. This will mean the council won’t be able to deliver the level of investment required, leading to a greater negative climate impact.

Ngā whakaaweawe me ngā tirohanga a te rōpū Kaunihera

Council group impacts and views

55.     The information prepared for consultation on the draft Contributions Policy 2025 was developed in conjunction with the following council-controlled organisations and council units:

·        Auckland Transport

·        Public Law

·        Policy

·        Planning and Resource Consents

·        Eke Panuku Development Auckland

·        Healthy Waters and Flood Resilience

·        Service Strategy and Partnerships

·        Chief Economist Unit

·        Spatial Analysis and Modelling.

Ngā whakaaweawe ā-rohe me ngā tirohanga a te poari ā-rohe

Local impacts and local board views

56.     The DC price varies by location depending on the cost of infrastructure required to support development in an area. These locations do not usually align to local board areas.

57.     A local board briefing session was held on 30 September 2024 to brief members on this topic. Local boards have received a memorandum to update them on the review of the contributions policy and the feedback from public consultation. 18 local boards accepted an offer for workshop briefing sessions which were held in March. The purpose of this report is to seek local board views.

Tauākī whakaaweawe Māori

Māori impact statement

58.     Development contributions are assessed against the demand that different types of development generate on council infrastructure. Māori developments are assessed under broader development types based on the demand they generate. For example, kaumātua housing is treated the same as retirement villages, and marae are considered under community facilities.

59.     Iwi authorities with mana whenua interests were contacted prior to the start of consultation to seek expressions of interest in discussing and providing feedback on the proposed changes. All iwi authorities were also notified when consultation opened, further advising of how they could have their say. The Mana Whenua forum and other council forums were advised of the consultation.

60.     Seven submitters on the proposal identified as Māori. One response supported the proposed changes to update the policy for changes to the LTP and to reflect growth beyond 2034 in the IPA areas and four were opposed. In regard to the changes to Drury and the other changes proposed two were in favour and two against. The only comment received was that new development needs to be fully funded by developers.

Ngā ritenga ā-pūtea

Financial implications

61.     The Long-term Plan 2024-2034 assumes DCs revenue of $2.0 billion over the LTP period. After completing the analysis of the cost of investments in the LTP that can be recovered with DCs and the impact of the proposed policy changes, it was estimated that the revenue would be $2.6 billion. The achievement of this revised revenue forecast requires, as a first step, the implementation of a contributions policy updated for the capital expenditure decisions in the LTP, and the other changes proposed in this report.

Ngā raru tūpono me ngā whakamaurutanga

Risks and mitigations

62.     Forecasting long-term growth, infrastructure investment, and development contributions (DCs) carries risks, but these can be managed through the triennial long-term plans, policy adjustments, and reallocation or refunds of DCs if planned assets are not delivered.

63.     There is a risk that projected development and DC revenue may not be met, which will be managed by monitoring consent applications and DC revenue.

64.     The council ensures its contributions policy complies with legislation, but given the proposed increases in DCs, some developers may challenge the policy.

Ngā koringa ā-muri

Next steps

65.     The Governing Body will consider the feedback and updates to the proposed policy and make a decision on the final policy adoption on 1 May 2025.

Ngā kaihaina

Signatories

 

Author

Andrew Duncan - Manager Financial Policy

Authorisers

 Lou-Ann Ballantyne – General Manager, Governance and Engagement

Janine Geddes - Acting Local Area Manager

 

 

 

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Attachment A: Draft Development Contributions Policy 2025

219

b

Attachment B: Schedule 8 Asset for which development contributions (DCs) will be used

263

c

Attachment C: Consultation Document - Contributions Policy 2025

293

d

Attachment D: How we set Development Contributions - Cost Allocation Methodology

321

e

Attachment E: Funding area maps

389

f

Attachment F: Memorandum and Summary of consultation feedback

401

     

 

 





































































































































































































Waiheke Local Board - Resource Consent Applications - March 2025

File No.: CP2025/03599

 

  

 

Whakarāpopototanga matua

Executive summary

Attached is the list of resource consent applications related to Waiheke Island and inner Hauraki Gulf islands received from 9 February to 15 March 2025.

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      note the list of resource consents applications (Attachment A) related to Waiheke Island and inner Hauraki Gulf islands 9 February to 15 March 2025.

 

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Resource consent applications - March 2025

417

     

Ngā kaihaina

Signatories

Author

Amelia Lawley - Democracy Advisor

Authoriser

Janine Geddes – Acting Local Area Manager

 

 



Waiheke Local Board - Hōtaka Kaupapa Policy Schedule - March 2025

File No.: CP2025/03598

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To present the Waiheke Local Board Hōtaka Kaupapa – Policy Schedule.

Whakarāpopototanga matua

Executive summary

2.       The Hōtaka Kaupapa – Policy Schedule, formerly called the Waiheke Local Board Governance Forward Work Calendar, is appended to the report as Attachment A. The policy schedule is updated monthly, reported to business meetings and distributed to council staff for reference and information only.

3.       The Hōtaka Kaupapa / governance forward work calendars aim to support local boards’ governance role by:

·    ensuring advice on meeting agendas is driven by local board priorities

·    clarifying what advice is expected and when

·    clarifying the rationale for reports

4.       The calendar also aims to provide guidance for staff supporting local boards and greater transparency for the public.

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      note / tuhi ā-taipitopito the Hōtaka Kaupapa – Policy Schedule for the political term 2022-2025 as at 26 March 2025

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Hōtaka Kaupapa - March 2025

421

     

Ngā kaihaina

Signatories

Author

Amelia Lawley - Democracy Advisor

Authoriser

Janine Geddes – Acting Local Area Manager

 

 



Waiheke Local Board - Workshop record - March 2025

File No.: CP2025/03608

 

  

 

Te take mō te pūrongo

Purpose of the report

1.       To note the Waiheke Local Board proceedings taken at the workshops held on 5 and 19 March 2025

Whakarāpopototanga matua

Executive summary https://acintranet.aklc.govt.nz/EN/workingatcouncil/techandtools/infocouncil/Pages/ExecutiveSummary.aspx

2.       The purpose of the local board’s workshops is for the provision of information and local board members discussion.  No resolutions or formal decisions are made during the local board’s workshops.

3.       The record of proceedings for the local board’s workshops held on 5 and 19 March 2025

4.       These can also be viewed at this link https://www.aucklandcouncil.govt.nz/about-auckland-council/how-auckland-council-works/local-boards/all-local-boards/waiheke-local-board/Pages/waiheke-local-board-public-and-business-meetings.aspx

 

Ngā tūtohunga

Recommendation

That the Waiheke Local Board:

a)      note the record of proceedings for the local board workshop held on 5 and 19 March 2025

 

 

Ngā tāpirihanga

Attachments

No.

Title

Page

a

Workshop notes - March 2025

425

     

Ngā kaihaina

Signatories

Author

Amelia Lawley - Democracy Advisor

Authoriser

Janine Geddes – Acting Local Area Manager

 

 







 


 

 


Waiheke Local Board

26 March 2025

 

 

 

 

 

 

 

 

ATTACHMENTS

 

Item 8.1      Attachment a    Te Whau residents support letter Page 435


Waiheke Local Board

26 March 2025

 

 

 



[1] The current population estimate is based on the most recent population estimates from StatsNZ. The post-covid period has been one of particularly high volatility with growth exceeding expectations. Future forecasts are based on the current ‘most likely’ Auckland growth scenario, AGSv1.1, These figures are the central scenario noting that the low and high are +/- 300,000 either side.